EastForkImnamatnoonConRFPdocx.docx

DOCX document 287 KB Posted

Attached to
Nez Perce-Clearwater NFs - East Fork Imnamatnoon Creek Culvert Replacement
Solicitation number
AG-02RC-S-15-0047
Issued by

About this file

Solicitation

View the file

Other files

File Type Posted
Amendment1EFimnamatnoon.doc DOC document
ImnamatnoonCulvertFSSS.pdf PDF
Imnamatnoon_Culvert_Plans.pdf PDF
EF_Imnamatnoon_Signed_Front_Page_Plans.pdf PDF
EFPhotoThrough_Culvert.JPG JPG image
EFDownStreamView.JPG JPG image
EFRoadPhoto.JPG JPG image

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION RFP thru FAC 2005-78B – 12/26/2014AG-02RC-S-15-0047
East Fork Imnamatnoon Creek Culvert Replacement

Powell Ranger District; Nez Perce-Clearwater NFs

CONSTRUCTION RFP thru FAC 2005-78B – 12/26/2014AG-02RC-S-15-0047
East Fork Imnamatnoon Creek Culvert Replacement

Powell Ranger District; Nez Perce-Clearwater NFs

OFFEROR'S COPY

NOTE: Attached forms must be completed and submitted intact.

Issuing Office:

U.S. Department of Agriculture Forest Service Idaho Montana Acquisition Team Nez Perce-Clearwater NFs Grangeville Office 104 Airport Road Grangeville, ID 83530

Offers Are Solicited For:

East Fork Imnamatnoon Creek Culvert Replacement

Powell Ranger District; Nez Perce Clearwater National Forest

Solicitation No. RFP AG-02RC-S-15-0047
HELP PREVENT FOREST FIRES

IMPORTANT - NOTICE TO OFFEROR

1. This is a complete copy. Information and instructions for submission of proposals as well as contract provisions and specifications are contained in this OFFEROR REFERENCE COPY. This copy should be retained by offerors.

2. Note: An offer guarantee (Bid Bond) IS REQUIRED. Performance and Payment Bonds will be required of the successful offeror. (See Section I, FAR Clause 52.228-15.)

FS-6300-45 (11/79)

CONSTRUCTION RFP thru FAC 2005-78B – 12/26/2014AG-02RC-S-15-0047
East Fork Imnamatnoon Creek Culvert Replacement

Powell Ranger District; Nez Perce-Clearwater NFs

TABLE OF CONTENTS

Page(s)

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM 1 - 2

SECTION B - SUPPLIES OR SERVICES AND PRICES 3 - 4

B- 1 - Schedule of Items
B- 2 – Price Proposal Instructions
B- 3 – Offer Submittal
B- 4 – Payment for Bond Premiums
B- 5 – Additional Classification Required – Davis-Bacon General Wage Decision
B- 6 – Idaho Use Tax

SECTION C - DESCRIPTION/SPECIFICATIONS 5 - 9

C- 1 – Project Description and Location
C- 2 – Government Furnished Material
C- 3 - Standard Specifications
C- 4 – Forest Service Supplemental Specifications
C- 5 - Drawings
C- 6 - Biobased Product Utilization

SECTION E - INSPECTION AND ACCEPTANCE 10 - 11

E- 1 – Inspection of Construction

SECTION F - DELIVERIES OR PERFORMANCE 12

F- 1 - Clauses Incorporated by Reference
F- 2 - Commencement, Prosecution, and Completion of Work Alt I
F- 3 - Period of Performance

SECTION G – CONTRACT ADMINISTRATION DATA 13

G- 1 – Post Award Conference
G- 2 – Contracting Officer’s Representative
G- 3 – Government-Furnished Property

SECTION H - SPECIAL CONTRACT REQUIREMENTS 14 - 23

H- 1 - Clauses Incorporated by Reference
H- 2 – Key Personnel
H- 3 - Physical Data
H- 4 – Barricades, Warning Signs, and Other Devices
H- 5 – Conditions on use of Premises
H- 6 – Environmental Protection
H- 7 – Noxious Weed Control
H- 8 – Landscape Preservation
H- 9 – Fire Control
H- 10 - Loss, Damage, or Destruction
H- 11 - Incidental Payment Items
H- 12 - Conformity with Drawings and Specifications
H- 13 - Local Material Sources
H- 14 - Samples, Tests, Cited Specifications

H- 15 - Invoice Processing Platform (IPP) H- 16 – Idaho Worker’s Compensation Law

PART II - CONTRACT CLAUSES

SECTION I - CONTRACT CLAUSES 24 - 42

I- 1 - Clauses Incorporated by Reference
I- 2 - Reporting Executive Compensation and First-Tier Subcontract Awards
I- 3 - System for Award Management Maintenance

I- 4 - Commercial and Government Entity Code Maintenance I- 5 - Assurance Regarding Felony Conviction or Tax Delinquent Status for Corporate Applicants Alternate I I- 6 - Post Award Small Business Program Rerepresentation I- 7 – Minimum Wages Under Executive Order 13658 I- 8 - Affirmative Procurement of Biobased Products Under Service and Construction Contracts

I- 9 - Buy American - Construction Materials
I-10 - Bid Guarantee
I-11 - Performance and Payment Bonds - Construction
I-12 - Alternative Forms of Security
I-13 – Federal, State, and Local Taxes
I-14 - Reimbursement For Bond Premiums - Fixed Price Construction Contracts
I-15 - Providing Accelerated Payment to Small Business Subcontractors
I-16 - Permits and Responsibilities
I-17 - Alterations In Contract
I-18 - Order of Precedence - Construction

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS 43 - 54

J- 1 - Wage Determination
J- 2 - Specifications
J- 3 - Drawings
J- 4 - State of Idaho Certificate of Verification of Workers’ Compensation Insurance

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER55 - 60
STATEMENTS OF OFFERORS AND RESPONDENTS

K- 1 - Annual Representations and Certifications K- 2 - Commercial and Government Entity Code Reporting K- 3 - Representation by Corporations Regarding an Unpaid Delinquent Tax Liability or a Felony Conviction Alternate I

SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS61 - 67
AND RESPONDENTS
L- 1 - Solicitation Provisions Incorporated by Reference
L- 2 - System for Award Management
L- 3 - Inquiries
L- 4 - Instructions for the Preparation of Technical and Business Proposals
L- 5 - Amendments to Proposals
L- 6 - Type of Contract
L- 7 – Construction Wage Rate Requirements – Secondary Site of Work
L- 8 - Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity

for Construction

L- 9 - Notice of Buy American Requirements - Construction Materials
L-10 - Service of Protest
L-11 - Site Visit (Construction)
L-12 - Preparation of Proposals – Construction

SECTION M - EVALUATION FACTORS FOR AWARD 68 - 70

M- 1 - Evaluation Factors
M- 2 - Award Statement
CONSTRUCTION RFP thru FAC 2005-78B – 12/16/2014AG-02RC-S-15-0047
East Fork Imnamatnoon Creek Culvert Replacement

Powell Ranger District; Nez Perce-Clearwater NFs

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

RFP AG-02RC-S-15-0047

2. TYPE OF SOLICITATION

|_| SEALED BID (IFB)

|_| NEGOTIATED (RFP)

3. DATE ISSUED

4/22/2015

PAGE OF PAGES

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

743825

6. PROJECT NO.

7. ISSUED BYCODE
8. ADDRESS OFFER TO

USDA, Forest Service Idaho Montana Acquisition Team Nez Perce-Clearwater NFs; Grangeville Office 104 Airport Road Grangeville, ID 83530

USDA, Forest Service Idaho Montana Acquisition Team Nez Perce-Clearwater NFs; Grangeville Office 104 Airport Road Grangeville, ID 83530

9. FOR INFORMATION
CALL:
a. NAME

KAREN RUKLIC: kruklic@fs.fed.us

b. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

(208) 983-5144

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

EAST FORK IMNAMATNOON CREEK CULVERT REPLACEMENT

Powell Ranger District Nez Perce-Clearwater National Forests Idaho County, Idaho

Price Range: The Government’s estimate is between $250,000 and $500,000.

**FAXED OFFERS ARE NOT ACCEPTABLE. ORIGINAL BID BONDS ARE REQUIRED. OFFERS MUST BE MAILED OR HAND-CARRIED AND RECEIVED BY May 21, 2015 AT 4:00 PM LOCAL TIME.

IMPORTANT: This acquisition has been set-aside for HUBZone Concerns (see FAR 52.219-3, Notice of Total HUBZone Set-Aside or Sole Source Award in Section I). Offerors must be certified HUBZone Concerns with the U.S. Small Business Administration. For information regarding the on-line application process, go to the following website at https://www.sba.gov. This process can take 90 days or more to complete.

11. The Contractor time shall begin upon receipt of contract |_| notice to proceed and shall be completed no later than October 15, 2015. This performance period is |_| mandatory, |_| negotiable. (See Section F, Clause 52.211-10, Alt I)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12b.)

|_| YES|_| NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a.Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 4:00 pm local time May 21, 2015 . If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
b.An offer guarantee|_| is,|_| is not required. (See clause in Section I.)
c.All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.Offers providing less than 30 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-32121442-101STANDARD FORM 1442 (REV. 4-85)
Computer GeneratedPrescribed by GSA

FAR (48 CFR) 53.236-1(e)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

Duns No. ______________________________________

TIN: ___________________________________________

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17. The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

PLEASE COMPLETE THIS BLOCK.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.
DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
|_| 10 U.S.C. 2304(c)( )|_| 41 U.S.C. 253(c)( )
26. ADMINISTERED BYCODE
27. PAYMENT WILL BE MADE BY

USDA – Forest Service Idaho Montana Acquisition Team Nez Perce-Clearwater NF, Grangeville Office 104 Airport Road Grangeville, ID 83530

All invoices will be processed using the Department of Treasury’s Invoice Processing Platform (IPP), visit http://www.ipp.gov to learn more. Contractors must follow the instructions on how to register and submit invoices via IPP.

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

|_|28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return ____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
|_|29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print) 31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

KAREN RUKLIC

BY

31c. DATE

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

EAST FORK IMNAMATNOON CULVERT REPLACEMENT

ROAD NO. 568 – M.P. 4.50

Nez Perce-Clearwater National Forests Powell Ranger District Idaho County, Idaho

B-1 SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

METH. OF

MEAS.

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101
MOBILIZATION
LSQ
Lump Sum
1
$___________
$_____________
15221
CONSTRUCTION SURVEY AND STAKING
LSQ
Lump Sum
1
$___________
$_____________
15713
SOIL EROSION CONTROL AND DEWATERING
LSQ
Lump Sum
1
$___________
$_____________
20301
REMOVAL OF EXISTING 57"x38” CORRUGATED STEEL PIPE-ARCH
AQ
Each
1
$___________
$_____________
20404
UNCLASSIFIED BORROW (GOVERNMENT FURNISHED)
CQ
Cubic Yard
1400
$___________
$_____________
20806
STRUCTURE EXCAVATION
LSQ
Lump Sum
1
$___________
$_____________
25101
PLACED RIPRAP, CLASS 4, MACHINE PLACED (GOVERNMENT FURNISHED)
CQ
Cubic Yard
150
$___________
$_____________
25150
GRADE CONTROL STRUCTURES, ROCK WEIRS
AQ
Each
16
$___________
$_____________
27201
GEOCELL ABUTMENT STABILIZATION, 6” DEPTH
CQ
Square Yard
122
$___________
$_____________
30809
CRUSHED AGGREGATE SURFACING, METHOD 2 (GOVERNMENT FURNISHED)
CQ
Cubic Yard
100
$___________
$_____________
553A01
PRECAST CONCRETE MEMBER, CULVERT FOOTING
AQ
Linear Foot
182
$___________
$_____________
553A02
PRECAST CONCRETE MEMBER, WINGWALL WITH DEADMAN ANCHOR
AQ
Each
7
$___________
$_____________
60103
STRUCTURAL CONCRETE FOR CULVERT HEADWALLS
LSQ
Lump Sum
1
$___________
$_____________
60304
10’ SPAN, 4’-5” RISE STRUCTURAL PLATE ARCH, 0.111” THICKNESS
AQ
Linear Foot
90
$___________
$_____________
62201
EQUIPMENT RENTAL, HYDRAULIC EXCAVATOR WITH THUMB
AQ
Hour
15
$___________
$_____________
62202
EQUIPMENT RENTAL, LARGE DUMP TRUCK
AQ
Hour
8
$___________
$_____________
62503
SEEDING, DRY METHOD WITH MULCH
LSQ
Lump Sum
1
$___________
$_____________
62601
CLUMP PLANTED VEGETATION
AQ
Each
20
$___________
$_____________
62901
EROSION CONTROL MAT, TYPE 4
CQ
Square Yard
600
$___________
$_____________
Project Total
$________________

* Designated Method of Measurement:

AQ - Actual Quantities; LSQ - Lump Sum Quantities; CQ – Contract Quantities

B-2 PRICE PROPOSAL INSTRUCTIONS: Unit prices and total item amounts must be submitted for all items. Do not round the extended item amounts and provide prices to the nearest cent. In addition, the Contractor shall give a price per hour under Items 62201 Hydraulic Excavator with Thumb and 62202 Large Dump Truck for additional work above the estimated quantities that is encountered during the contract performance. The Government does not guarantee that any hourly work shall be ordered and reserves the right to reduce or eliminate entirely the work under these items with no adjustment in contract unit price.

B-3 OFFER SUBMITTAL: As your offer, submit a completed and signed Standard Form 1442, a completed Schedule of Items (Section B-1), a Technical Proposal, an original bid bond, a completed Section K and a completed Verification of Worker’s Compensation Insurance Form (provided in Section J). Technical and price proposals are required for evaluation of offers. See Section L for proposal instructions and Section M for evaluation/award information.

Electronic or facsimile proposals are NOT acceptable.

B- 4 PAYMENT FOR BOND PREMIUMS Note: Payment for bond premiums in accordance with FAR Clause 52.232-5, Payments Under Fixed-Price Construction Contracts, shall not be in addition to the contract price.

B-5 ADDITIONAL CLASSIFICATION REQUIRED – DAVIS-BACON GENERAL WAGE DECISION ID150051, 1/23/2015: A wage rate for an Excavator Operator shall be conformed after award in accordance with FAR 52.222-6 Construction Wage Rate Requirements (MAY 2014) and direction provided in the subject Wage Decision. The most recent wage rate approved by the Department of Labor for this classification was $25.56 per hour rate with $12.85 fringe benefits (conformed 9/19/14).

B-6 IDAHO USE TAX Under Clause 52.236-7, Permits and Responsibilities, Contractors shall be responsible for complying with any Federal, State, and municipal laws, codes and regulations applicable to the performance of the work. Questions regarding assessment of Idaho Use Tax on Government Furnished Property should be directed to the Idaho State Tax Commission at (208) 799-3491.

SECTION C - DESCRIPTION/SPECIFICATIONS

C-1 - PROJECT DESCRIPTION AND LOCATION

a. Scope of Contract. This project is in collaboration with the Nez Perce Tribe Watershed program. The goal of this partnership is to use restoration techniques to improve the waterway. This contract requires installation of an Aquatic Organism Passage deep fill culvert to improve this water way. Erosion control measures will be used to protect the watershed. All work shall be in compliance with this solicitation’s specifications, and provisions. This includes furnishing labor, equipment, supervision, transportation, operating supplies, and incidentals.

b. Description of Work. EF Imnamatnoon Culvert Replacement - This project is located on FS Road 568 at milepost 4.50 and consists of removing a 57”x 38” corrugated steel pipe arch and replacing with a new 10’ span, 4’-5” rise structural plate arch, 0.111” thickness. The culvert is considered deep fill with over 22 feet fill over the culvert at centerline of the roadway; it is located in a switchback corner of the road. Contractor is responsible for meeting OSHA regulations for excavation, see sheet 5 of Drawings. The culvert is designed for 100 year flood and includes native streambed material, channel and footer rocks placed in the culvert. At the inlet and outlet of the culvert, head walls (cast-in-place) and wing walls (precast) shall be installed and geocell reinforcement is included throughout the length of the precast foundations of the culvert. Work also includes placing riprap, rebuilding the road prism, replacement of surfacing along with all other work necessary to complete the project as required by the contract, plans, and specifications. In addition to the above work, the Government shall be using hourly excavator time to rehab two dispersed recreation sites. These sites are located at MP 0.1 of FS Road 568 and MP 0.0 of FS Road 108.

c. Project Location. The project is located in the Powell Ranger District of the Nez Perce - Clearwater National Forests, approximately 88.1 miles east on Highway 12 from Kooskia, and 4.5 miles north on Forest Road 568 Idaho in Idaho County, Idaho (Section 7, Township 37 North, Range 14 East). Milepost 4.50 on Forest Road #568. Refer to the location map on the title sheet of the plans.

d. Price Range. Government cost estimate is between $250,000 and $500,000.

e. Pre-Bid Tour. No organized site visit is planned for this project. For further information, please contact Michael Dominguez at the 208-926-6408, Civil Engineering Technician supporting the Lochsa-Powell Ranger District.

f. Start Work. It is estimated that work will begin on July 1, 2015. The contractor shall give provide notice 14 days prior to starting any ground disturbing activities.

g. Period of Performance. All instream work must be between July 15, 2015 and August 30, 2015. All work must be completed by October 15, 2015. See Part I, Section F, Clause 52.211-10 Alt I.

C-2 - GOVERNMENT FURNISHED MATERIAL

· Item 25101 Placed Rip Rap, Class 4

· Item 20404 Unclassified Borrow

· Item 30809 Crushed Aggregate Surfacing

· Waste site for excess and unsuitable material.

See Section G-3 and FAR 52.245-1 in Section I-1 for additional information.

C-3 - STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS FP-03 U.S. Customary Units (U.S. DEPARTMENT OF TRANSPORTATION, Federal Highway Administration) (2003)

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-03, U.S. Customary Units are included in this solicitation by reference only. The requirements contained in these Specifications are hereby made a part of this solicitation and any resultant contract. Copies of these Specifications are available on the internet at www.wfl.fha.dot.gov/design/specs/fp03.htm

C-4 - FOREST SERVICE SUPPLEMENTAL SPECIFICATIONS

Forest Service supplementary specifications incorporated into this solicitation and any resultant contract are included as a separate attachment to this solicitation (see Section J). The supplementary specifications applicable to this project are listed below.

NOTE THAT THE SUPPLEMENTAL SPECIFICATION LIST INCLUDES THE MAJOR SPECIFICATIONS APPLICABLE TO THIS PROJECT. OTHER SPECIFICATIONS REFERRED TO WITHIN THESE SPECIFICATIONS (EVEN THOUGH NOT SPECIFICALLY LISTED HEREIN) ARE ALSO FULLY APPLICABLE TO THIS REQUEST FOR PROPOSALS AND ANY RESULTANT CONTRACT.

SUPPLEMENTAL SPECIFICATION LIST

East Fork Imnamatnoon Creek Culvert Replacement

NEZ PERCE-CLEARWATER NATIONAL FORESTS

SPEC. No.
SPECIFICATION TITLE
FSSS101
Terms, Format, and Definitions
FSSS102
Bid, Award, and Execution of Contract
FSSS103
Scope of Work
FSSS104
Control of Work
FSSS105
Control of Materials
FSSS106
Acceptance of Work
FSSS107
Legal Relations and Responsibility to the Public
FSSS108
Prosecution and Progress
FSSS109
Measurement & Payment
FSSS151
Mobilization
FSSS152
Construction Survey and Staking
FSSS153
Contractor Quality Control
FSSS155
Schedules for Construction Contracts
FSSS156
Public Traffic
FSSS157
Soil Erosion Control
FSSS 201
Clearing and Grubbing
FSSS 203
Removal of Structures and Obstructions
FSSS 204
Excavation and Embankment
FSSS 208
Structural Excavation and Backfill for Selected Major Structures
FSSS 251
Riprap
FSSS 272
Geocell Abutment Stabilization
FSSS 308
Minor Crushed Aggregate
FSSS 553A
Precast Concrete Structures
FSSS 601
Minor Concrete Structures
FSSS 603
Structural Plate Structures
FSSS 622
Rental Equipment
FSSS 625
Turf Establishment
FSSS 626
Plants, Tress, Shrubs, Vines, and Groundcovers
FSSS 629
Rolled Erosion Control Products and Cellular Confinement Systems
FSSS 703
Aggregate
FSSS 705
Rock
FSSS 713
Roadside Improvement Material
FSSS 725
Miscellaneous Material
FSSS 736
Geocell

C-5 – DRAWINGS (Entitled: “TRIBUTARY TO EF IMNAMATNOON CREEK CULVERT REPLACEMENT”)

The following drawings are a part of this solicitation and any resulting contract and are found in a separate attachment in Section J.

SHEET NUMBER
SHEET TITLE
SHEET 1
COVER
SHEET 2
ESTIMATED QUANTITIES & GENERAL NOTES
SHEET 3
ROAD PLAN & PROFILE
SHEET 4
CULVERT GENERAL LAYOUT
SHEET 5
EXCAVATION REQUIREMENTS & RIPRAP DETAILS
SHEET 6 - 7
PRECAST FOOTING DETAILS
SHEET 8
HEADWALL & WINGWALL DETAILS
SHEET 9
INLET HEADWALL DETAILS
SHEET 10
OUTLET HEADWALL DETAILS
SHEET 11
WINGWALL DETAILS
SHEET 12
STREAM DETAILS
SHEET 13
DEWATERING REQUIREMENTS
SHEET 14
PERMANENT EROSION CONTROL DETAILS
SHEET XS1 - XS5
ROAD CROSS SECTIONS

C- 6 - BIOBASED PRODUCT UTILIZATION

The Contractor must comply with the Agricultural Act of 2014; the Food, Conservation and Energy Act of 2008 (FCEA), 7 U.S.C. 8102; the Farm Security and Rural Investment Act of 2002 (FSRIA), 7 U.S.C. 8102; the Federal Acquisition Regulation; Executive Order (EO) 13514, “Federal Leadership in Environmental, Energy and Economic Performance,” dated October 5, 2009; EO 13423, “Strengthening Federal Environmental, Energy, and Transportation Management,” dated January 24, 2007; and Presidential Memorandum, “Driving Innovation and Creating Jobs in Rural America through Biobased and Sustainable Product Procurement,” dated February 2012, to provide biobased products.

The Contractor shall utilize products and material made from biobased materials to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the end user. All supplies and materials shall be of a type and quality that conform to applicable Federal specifications and standards. All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer’s Representative (COR).

The following is an example list of products that may be used in this contract for which biobased products are available. The list is not all inclusive. It is desirable that Contractors be able to supply the greatest number of biobased products listed meeting the health and environmental specifications.

Hydraulic FluidsPenetrating LubricantsDegreasers
AbsorbentsDiesel Fuel AdditivesGreases
Dust Suppressants2-Cycle Engine OilSorbents
Adhesive and Mastic RemoversCleanersConcrete/Asphalt Release Fluids
Composite PanelsSealersWood and Concrete Sealers
Graffiti and Grease RemoversStain RemoversMetalworking Fluids

Biobased products that are designated for preferred procurement under USDA’s Biopreferred Program must meet the required minimum biobased content as stated in the USDA Final Rule available at www.biopreferred.gov. The Contractor should provide data for their biobased products such as biobased content and source of biobased material.

In addition to the biobased products designated by the U.S. Department of Agriculture in the Biopreferred Program, the Contractor is encouraged to use other commercially available biobased products.

The Contractor shall submit with the initial proposal a complete list of biobased products, indicating the name of the manufacturer, cost of each material, and the intended use of each of the materials that are to be used in carrying out the requirements of this contract (see Sections L and M).

Additionally, the winning Contractor on each anniversary date of the contract shall compile a complete list of biobased products, including the information above, purchased to carry out the contract requirements. The Contractor shall list volume to be used and total cost for each individual product. This information will be used for reporting purposes (see Section I, FAR Clause 52.223-2).

Within thirty (30) days of contract award, the Contractor shall submit an Operation Plan. This submittal will be approved by the COR in writing. The Contractor shall not commence work until this submittal is approved by the COR in writing. The Plan must be reviewed and updated annually, and as required by the COR. The Plan must contain and define the following elements:

· The Contractor’s written policy stating its commitment to the use of biobased products, employee health and safety, and sound environmental management practices.

· Detail on how the Contractor intends to keep abreast of the development and increasing availability of designated and non-designated biobased products and how any new or improved products will be incorporated on an ongoing basis into contract performance.

· Proposed biobased construction products which must be selected in accordance with the criteria included above. At a minimum, the Plan must identify products by brand name for each of the product types.

NOTE: A Contractor may propose more than one product within a product category and/or propose a product or products addressing more than one product category.

· The product guides which define standard operating procedures for instructing staff in the proper use, storage, and disposal of biobased products; proper maintenance of equipment; and other procedures/instructions to accomplish work under this contract.

The Contractor shall provide data on the quantity and dollar values of biobased products used in this contract. The data shall be submitted to the COR quarterly.

A demonstration of proper use, an effective training program, and technical assistance are essential to the success of the purchase and use of some biobased products that may function differently than a conventional product.

SECTION E - INSPECTION AND ACCEPTANCE

E-1 - INSPECTION OF CONSTRUCTION (FAR 52.246-12) (JUL 1986)

(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.

(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.

(c) Government inspections and tests are for the sole benefit of the Government and do not--

(1) Relieve the Contractor of responsibility for providing adequate quality control measures;

(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;

(3) Constitute or imply acceptance; or

(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.

(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.

(e) The Contractor shall promptly furnish, without additional charge, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.

(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.

(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.

(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.

(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.

SECTION F - DELIVERIES OR PERFORMANCE

F- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

52.242-14 Suspension of Work (APR 1984)

F- 2 FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) Alternate I (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10-calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than October 15, 2015. The time stated for completion shall include final cleanup of the premises.

The completion date is based on the assumption that the successful offeror will receive the notice to proceed by July 1, 2015. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.

All stream work must occur between July 15, 2015 and August 30, 2015.

F- 3 AGAR 452.211.74 Period of Performance (FEB 1988)

The period of performance of this contract is from July 1, 2015 through October 15, 2015.

SECTION G--CONTRACT ADMINISTRATION DATA

G-1 AGAR 452.215-73 Post Award Conference (NOV 1996) A post award conference with the successful offeror is required. It will be scheduled and held within 30 days of the commencement of work. The conference will be held at Nez Perce – Clearwater National Forest, Lochsa-Powell Ranger District Office, in Kooskia, ID. Another location can be approved if all parties agree.

G-2 CONTRACTING OFFICER'S REPRESENTATIVE

The Contracting Officer will designate a representative, hereinafter referred to as the Contracting Officer's Representative (COR) or, alternatively, as the Engineer, who will provide on-the-ground administration for the Government. The COR will be designated in writing and a copy of the designation will be furnished to the Contractor before or at the prework conference. The Contractor is cautioned to read the COR designation because certain authority under the contract is reserved solely for the Contracting Officer. The term "Contracting Officer" as used throughout the Specifications, shall be interpreted to include the Contracting Officer's designated representative(s) acting within the limits of their delegation of authority.

G-3 - GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the “Government Property” FAR clause contained elsewhere in the contract.

· The source for Item 25101 Placed Rip Rap, Class 4 is located at the Wendover Cabin site located on Forest Road 5621 in Section 26 of T37N, R13E. Material may require sorting and/or blending to meet the specified gradation.

· The source for Item 20404 Unclassified Borrow is at the Wendover Cabin site described above.

· Government furnished material for Item 30809 Crushed Aggregate Surfacing, Method 2 (Spec 105) is located at the Powell Pasture Stockpile located at MP 0.2 of Forest Road No. 5910A, which is left at the junction of Forest Road 5910.

· The waste site for excess and unsuitable material is located at the Wendover Cabin described above.

· There is no available Government source for Coarse Granular Backfill.

SECTION H - SPECIAL CONTRACT REQUIREMENTS

H- 1 FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): Federal Acquisition Regulations - http://www.acquisition.gov/far and the Agriculture Acquisition Regulations – http://www.usda.gov/procurement/policy/agar.html.

AGRICULTURE ACQUISITION REGULATION (48 CFR CHAPTER 4) CLAUSES

452.236-72 Use of Premises (NOV 1996)

H- 2 KEY PERSONNEL

The key personnel specified in the Offeror’s Technical Proposal are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, the Contractor shall notify the Contracting Officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract. No diversion shall be made by the Contractor without the written consent of the Contracting Officer: Provided that the Contracting Officer may ratify in writing such diversion and such ratification shall constitute the consent of the Contracting Officer required by this clause. The contract may be amended from time to time during the course of the contract to either add or delete personnel, as appropriate.

H-3 FAR 52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor’s information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the plans and in the specifications are the result of site investigations by Forest Service specialists making physical determination based on surface observations.

(b) Weather Conditions. Normal snow conditions indicate a work season from approximately July 1, 2015 to October 15, 2015.

(c) Transportation Facilities. The project is located at milepost 4.50 on FS Road 568. From Kooskia, Idaho travel east on US Hwy 12 for approximately 88.1 miles. Turn left on Road 568 and go approximately 4.50 miles to the project site. Road 568 is a single FS lane, aggregate road with turnouts.

(d) Material Sources.

The source for Rip Rap is located at the Wendover Cabin site located on Forest Road 5621 in Section 26 of T37N, R13E (Material may require sorting and/or blending to meet the specified gradation. Unclassified Borrow Source is at the Wendover Cabin site described above. Crushed Aggregate Source is located at the Powell Pasture Stockpile located ate MP 0.2 of Forest Road No. 5910A, which is left at the junction of Forest Road 5910. There is no available Government source for Coarse Granular Backfill. The waste site for excess and unsuitable material is located at the Wendover Cabin.

H-4 BARRICADES, WARNING SIGNS, AND OTHER DEVICES

The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient lights, danger signals, signs, and other traffic control devices, and shall take all necessary precautions for the protection of the work and safety of the public. Roads closed to traffic shall be protected by effective barricades, and obstructions shall be illuminated during the hours of darkness. Suitable warning signs shall be provided to properly control and direct traffic.

The Contractor shall erect warning signs in advance to any place on the project where operations may interfere with the use of the road or trail by traffic and at all intermediate points where the new work crosses or coincides with an existing road or trail. All road barricades, warning signs, lights, temporary signals, flagmen and pilot car operators and equipment, and other protective devices, except for special devices, shall conform with Part VI of the Manual on Uniform Traffic Control Devices for Streets and Highways, published by the Federal Highway Administration and applicable safety codes.

Necessary warning signs and guards shall be posted during blasting operations to safeguard the public.

…As a minimum, it is anticipated that the following type and number of signs will be required:

For EF Imnamatnoon Creek Culvert Replacement MP 4.50:

Location

Designation

Quantity

Junction with Highway 12 and Road 568

ROAD CLOSED 4.5 MILES AHEAD

Junction with Road 109 and Road 568 at MP- 4.50

ROAD CLOSED 2 MILES AHEAD

Approximately 500’ on both sides of construction site on Road 568

ROAD CLOSED

Junction w/ Highway 12 and RD 5621 (ONLY During Haunling)

TRUCKS ENTERING HIGHWAY

*NOTE: Contractor is to provide an approved Traffic Control Plan

H-5 CONDITIONS ON USE OF PREMISES (Camping)

(a) Camping will be allowed only at the sites designated on the project maps or approved in advance by the District Ranger.

(b) No improvements of a permanent nature shall be constructed without prior written approval of the C.O.R.

Temporary structures such as tent frames, hitch racks, tents and tent pegs shall be removed at the end of the period of use, all evidence of the camp eliminated, and the site restored to its original condition. Final payment will not be authorized until the campsite has been cleaned up and the site is approved by the Contracting Officer or his designated representative. Reusable native material may be neatly stacked for future use.

(c) Livestock will not be permitted without written approval from the Contracting Officer.

(d) Vegetation shall be undisturbed to the maximum extent possible. The Contractor will be permitted to cut only those trees designated by the COR.

(e) Storage of petroleum products in excess of 50 gallons at the campsite will require the approval of the COR. All petroleum spills shall be immediately cleaned up. All spills will be reported immediately to the CO or COR. Spills over 25 gallons will be reported to CO and the Idaho State Department of Enviromental Quality. No waste disposal of petroleum product will be permitted on National Forest land.

(f) Chemical toilets are preferred for all campsites, however, the Contractor may be permitted to construct a slit trench when conditions warrant. Any slit trench constructed shall not be located closer than 400 feet to any live stream and is subject to approval of the COR. The trench shall be covered and the area restored to as natural a condition as possible when the camp is closed.

(g) Refuse including waste materials, garbage, and rubbish of all kinds, shall be disposed of in the following manner, and shall guard the purity of streams and living waters:

Garbage, trash, sewage waste, and other litter shall be kept in closed fly-proof containers and periodically hauled to an approved disposal facility located outside of the National Forest.

(h) Waste water shall be disposed of in a leach pit located at least 300 feet from springs, streams, and lakes. The pit shall be a minimum of 2 x 2 x 2 feet and shall be filled with rock two to eight inches in diameter. The leach pit shall be covered with at least two feet of compacted soil when the camp is closed.

(i) No waste or by-products shall be discharged if it contains any substances in concentrations which will result in substantial harm to fish and wildlife, or to human water supplies.

Storage facilities for materials capable of causing water pollution, if accidentally discharged, shall be located so as to prevent any spillage into waters, or channels leading into water, that would result in substantial harm to fish and wildlife or to human water supplies.

(j) The camp area shall be maintained to present a clean, neat, and orderly appearance. Disposal of trash and debris, unusable machinery, Forest Service authorized improvements, etc., shall be kept current. Building materials, firewood, etc., shall be neatly stacked.

(k) The campsite shall be left in a clean condition. Any clean-up work not accomplished by the Contractor at time of camp closure will be done by the Forest Service, and the actual cost of such clean-up will be deducted from payment otherwise due the Contractor.

H-6 ENVIRONMENTAL PROTECTION

Prevention of Oil Spills.

The contractor is required to have a spill plan. The plan will contain a description of the specific hazardous materials, procedures, and spill containment that will be used, including inventory, storage, and handling.

All vehicles carrying fuel will have specific equipment and materials needed to contain or clean up any incidental spills at the project site.

All pumps and generators used in or near streams will have appropriate spill containment structures and/or absorbent pads in place during use.

When storage facilities for oil or oil products are on site, appropriate preventive measures shall be taken to insure that any spill of such oil or oil products does not enter any stream or any other body of water. If a spill of petroleum product should occur in water, immediately notify the Contracting Officer and appropriate state agencies.

Fuel and service all equipment only in the areas approved by the Contracting Officer. If the total oil or oil products storage exceeds 1320 gallons or if any single container exceeds a capacity of 660 gallons, prepare a Spill Prevention Control and Countermeasures (SPCC) Plan. Meet all applicable EPA requirements (40 CFR 112) including certification by a registered professional engineer.

Contractor shall ensure that all personnel involved in handling and packaging the hazardous waste are trained for the level of expertise required for the proper performance of the task and, in particular, in the areas of chemical incompatibility, general first aid procedures, and spills. Provide handling and personal protective equipment appropriate to ensure safe handling of the hazardous waste according to 29 CFR 1910.120). Notify the Forest Service of all hazardous material that may be brought onto the National Forest.

The Contractor is solely responsible for all spills or leaks that occur during the performance of this contract. The contractor must clean up spills or leaks in a manner that complies with Federal, state, and local laws and regulations and to the satisfaction of the CO. Any spills resulting in a detectable sheen on water shall be reported to the EPA National Response Center (1-800-424-8802). Any spills over 25 gallons will be reported to the Idaho Division of Environmental Quality and cleanup will be initiated within 24 hours of the spill. When available provide copies of all spill related clean up and closure documentation and correspondence from regulatory agencies.

Equipment, Fuel/Oil Leakage

All equipment used for instream work will be cleaned of external oil, grease, dirt and mud; and leaks repaired; prior to arriving at the project site. All equipment will be inspected by the Contracting Officer’s Representative before unloading at site. Any leaks or accumulations of grease will be corrected before entering streams or areas that drain directly to streams or wetlands.

Equipment used for in-stream or riparian work (including chainsaws and other hand power tools) will be fueled and serviced in an area approved by the CO. When not in use, vehicles will be stored in the designated staging area. The staging area should be in an area that will not deliver fuel, oil, etc. to streams.

Contractor is required to have a Spill Kit or equivalent that contains oil-absorbing floating booms, and other equipment such as pads and absorbent “peanuts” appropriate for the size of the stream, available on-site during all phases of construction. For small streams with few pools or slack water, booms may not be effective. Use pads and straw bales to anchor booms if necessary. Booms will be placed in a location that facilitates an immediate response to potential petroleum leakage.

H-7 NOXIOUS WEED CONTROL

In order to prevent the potential spread of noxious weeds into work areas, Contractor shall be required to use weed-free equipment.

The following is considered proof of weed-free equipment:

The Contractor will be required to clean all construction equipment prior to entry on to national forest land. This cleaning shall remove all dirt and plant parts and material that could carry noxious weed seeds into the work area. Only clean construction equipment inspected by the Forest Service will be allowed to operate within the work area. All subsequent move-ins of construction equipment shall be treated in the same manner as initial move-in. "Construction equipment" does not include pickup trucks and personal vehicles.

H-8 LANDSCAPE PRESERVATION

(a) The Contractor shall confine operations to within the clearing limits or other areas designated in contract documents, and prevent the depositing of rocks, excavated materials, stumps, or other debris outside of these limits. Material, which falls outside of these limits, shall be retrieved, disposed of, or incorporated in the work as directed by the Contracting Officer.

(b) Operation shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.).

Pollutants such as fuels, lubricants, bitumens, raw sewage, and other harmful materials shall not be discharged into or near rivers, streams, and impoundments or into natural or manmade channels leading thereto. Wash water or waste water from concrete or aggregate operations shall not be allowed to enter live streams prior to treatment by filtration, settling, or other means sufficient to reduce the sediment content to not more than that of the stream into which it is discharged.

Mechanized equipment shall not be operated in live streams without written approval by the Contracting Officer.

H-9 FIRE CONTROL (FS 236-1)

(a)Contractor's Responsibility for Contractor-Caused Fires. The Contractor, whether or not directed by the Forest Service, shall immediately extinguish, without expense to the Government, all fires on or in the vicinity of the project which are caused by Contractor's employees, whether set directly or indirectly as a result of Contractor operations. The Contractor may be held liable for all damages and costs of additional labor, subsistence, equipment, supplies, and transportation resulting from fires set or caused by the Contractor's employees or resulting from contract operations.
(b)Other Fires. For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor or his employees, the Contractor when requested by the Contracting Officer shall place his employees and equipment temporarily at the disposal of the Forest Service. Payment for such services will be made by the Government at not less than the current rate for fire-fighting services established by the Forest Service in the area concerned.

Any employees and equipment furnished will be relieved from fire fighting as soon as the Forest Service finds that it is practicable to employ other labor and…