Nez Perce-Clearwater NFs - Crooked River Valley Rehabilitation - Option 2

Award Notice Posted

Solicitation number
AG-02RC-S-17-0077
Agency
Awarded
to Glacier Excavating, Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-02RC-C-17-0020 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Red River Ranger District 300 American River Road Elk City, Idaho 83525, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

Award made on 6/14/17.

Update #5 ·

The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in 4 - 6 Phases. The Phases include building a bypass channel, rebuilding floodplain and river channel, and adding large wood structures. Phase 1 Bypass work was completed in 2016 and Phase 2 Bypass Work will be completed in 2017 under a separate contract. The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration.

This contract requires the work specified under Option 2 of the Crooked River Valley Rehabilitation Project. Option 2 requires installation of 10 large woody debris structures utilizing on-site material and re-grading approximately 11 acres of floodplain including bankfull and upland elevations. The floodplain re-grading will require moving and reshaping approximately 11,800 cubic yards of mine tailings on site and hauling approximately 16,300 cubic yards of excess material to a staging area. On site soil and wood chips shall be used as surface treatment on the newly created floodplain. Contractor shall also salvage and transplant/utilize/stockpile soil, brush, vegetation and trees and create floodplain roughness. Contractor shall perform survey and construction staking incidental to these work items.


Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.


The project is approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area.


The Government's construction estimate is between $250,000 and $500,000. A formal pre-bid tour will be held; see Section L of the solicitation for details. It is anticipated that the solicitation will be issued in early May. Construction work shall commence approximately July 1, 2017; all work shall be completed by September 30, 2017. All in-stream work must take place between July 15th and August 30, 2017.

Solicitation was issued on 5/10/2017.  Original bid bonds are required.

The organized site visit is scheduled for Wednesday, May 17th at 11 AM PST.  While drafting the solicitation, the government choose to move the time from 1 o'clock to 11 o'clock.  In the rush to post the solicitation, the drafter failed to change the PM to AM.  No formal amendment will be made to the solicitation as the time intended is self-evident. 

Site Visit was held as planned.  Notes have been uploaded.  A solicitation amendment shall follow to clarify a few requirements and upload aerial photos.

Solicitation amended 5/31/17.  Response deadline was not extended.

Update #4 ·

The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in 4 - 6 Phases. The Phases include building a bypass channel, rebuilding floodplain and river channel, and adding large wood structures. Phase 1 Bypass work was completed in 2016 and Phase 2 Bypass Work will be completed in 2017 under a separate contract. The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration.

This contract requires the work specified under Option 2 of the Crooked River Valley Rehabilitation Project. Option 2 requires installation of 10 large woody debris structures utilizing on-site material and re-grading approximately 11 acres of floodplain including bankfull and upland elevations. The floodplain re-grading will require moving and reshaping approximately 11,800 cubic yards of mine tailings on site and hauling approximately 16,300 cubic yards of excess material to a staging area. On site soil and wood chips shall be used as surface treatment on the newly created floodplain. Contractor shall also salvage and transplant/utilize/stockpile soil, brush, vegetation and trees and create floodplain roughness. Contractor shall perform survey and construction staking incidental to these work items.


Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.


The project is approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area.


The Government's construction estimate is between $250,000 and $500,000. A formal pre-bid tour will be held; see Section L of the solicitation for details. It is anticipated that the solicitation will be issued in early May. Construction work shall commence approximately July 1, 2017; all work shall be completed by September 30, 2017. All in-stream work must take place between July 15th and August 30, 2017.

Solicitation was issued on 5/10/2017.  Original bid bonds are required.

The organized site visit is scheduled for Wednesday, May 17th at 11 AM PST.  While drafting the solicitation, the government choose to move the time from 1 o'clock to 11 o'clock.  In the rush to post the solicitation, the drafter failed to change the PM to AM.  No formal amendment will be made to the solicitation as the time intended is self-evident. 

Site Visit was held as planned.  Notes have been uploaded.  A solicitation amendment shall follow to clarify a few requirements and upload aerial photos.

Update #3 ·

The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in 4 - 6 Phases. The Phases include building a bypass channel, rebuilding floodplain and river channel, and adding large wood structures. Phase 1 Bypass work was completed in 2016 and Phase 2 Bypass Work will be completed in 2017 under a separate contract. The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration.

This contract requires the work specified under Option 2 of the Crooked River Valley Rehabilitation Project. Option 2 requires installation of 10 large woody debris structures utilizing on-site material and re-grading approximately 11 acres of floodplain including bankfull and upland elevations. The floodplain re-grading will require moving and reshaping approximately 11,800 cubic yards of mine tailings on site and hauling approximately 16,300 cubic yards of excess material to a staging area. On site soil and wood chips shall be used as surface treatment on the newly created floodplain. Contractor shall also salvage and transplant/utilize/stockpile soil, brush, vegetation and trees and create floodplain roughness. Contractor shall perform survey and construction staking incidental to these work items.


Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.


The project is approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area.


The Government's construction estimate is between $250,000 and $500,000. A formal pre-bid tour will be held; see Section L of the solicitation for details. It is anticipated that the solicitation will be issued in early May. Construction work shall commence approximately July 1, 2017; all work shall be completed by September 30, 2017. All in-stream work must take place between July 15th and August 30, 2017.

Solicitation was issued on 5/10/2017.  Original bid bonds are required.

The organized site visit is scheduled for Wednesday, May 17th at 11 AM PST.  While drafting the solicitation, the government choose to move the time from 1 o'clock to 11 o'clock.  In the rush to post the solicitation, the drafter failed to change the PM to AM.  No formal amendment will be made to the solicitation as the time intended is self-evident. 

Update #2 ·

The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in 4 - 6 Phases. The Phases include building a bypass channel, rebuilding floodplain and river channel, and adding large wood structures. Phase 1 Bypass work was completed in 2016 and Phase 2 Bypass Work will be completed in 2017 under a separate contract. The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration.

This contract requires the work specified under Option 2 of the Crooked River Valley Rehabilitation Project. Option 2 requires installation of 10 large woody debris structures utilizing on-site material and re-grading approximately 11 acres of floodplain including bankfull and upland elevations. The floodplain re-grading will require moving and reshaping approximately 11,800 cubic yards of mine tailings on site and hauling approximately 16,300 cubic yards of excess material to a staging area. On site soil and wood chips shall be used as surface treatment on the newly created floodplain. Contractor shall also salvage and transplant/utilize/stockpile soil, brush, vegetation and trees and create floodplain roughness. Contractor shall perform survey and construction staking incidental to these work items.


Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.


The project is approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area.


The Government's construction estimate is between $250,000 and $500,000. A formal pre-bid tour will be held; see Section L of the solicitation for details. It is anticipated that the solicitation will be issued in early May. Construction work shall commence approximately July 1, 2017; all work shall be completed by September 30, 2017. All in-stream work must take place between July 15th and August 30, 2017.

Solicitation was issued on 5/10/2017.  Original bid bonds are required.

Update #1 ·

The objective of the Crooked River Valley Rehabilitation Project is to address the impacts of historical dredge mining on aquatic habitat conditions. The Crooked River Valley Rehabilitation project was designed to be constructed in 4 - 6 Phases. The Phases include building a bypass channel, rebuilding floodplain and river channel, and adding large wood structures. Phase 1 Bypass work was completed in 2016 and Phase 2 Bypass Work will be completed in 2017 under a separate contract. The project is being performed on the Red River Ranger District of the Nez Perce Clearwater National Forests in collaboration with the Nez Perce Tribe Watershed Program and funded by Bonneville Power Administration.

This contract requires the work specified under Option 2 of the Crooked River Valley Rehabilitation Project. Option 2 requires installation of 10 large woody debris structures utilizing on-site material and re-grading approximately 11 acres of floodplain including bankfull and upland elevations. The floodplain re-grading will require moving and reshaping approximately 11,800 cubic yards of mine tailings on site and hauling approximately 16,300 cubic yards of excess material to a staging area. On site soil and wood chips shall be used as surface treatment on the newly created floodplain. Contractor shall also salvage and transplant/utilize/stockpile soil, brush, vegetation and trees and create floodplain roughness. Contractor shall perform survey and construction staking incidental to these work items.


Contractor shall furnish all labor, equipment, structures, supervision, transportation, operating supplies (except those designated at Government-furnished), and incidentals necessary to complete the project as required by the contract, plans, and specifications.


The project is approximately 45 mi east of Grangeville, Idaho. At the junction of Highway 14 and the Crooked River Road (FR 233), travel south for approximately 0.25 mile to the project area.


The Government's construction estimate is between $250,000 and $500,000. A formal pre-bid tour will be held; see Section L of the solicitation for details. It is anticipated that the solicitation will be issued in early May. Construction work shall commence approximately July 1, 2017; all work shall be completed by September 30, 2017. All in-stream work must take place between July 15th and August 30, 2017.

Files

File Type Posted
AttachmentJ6_Page4_TreeStockpile.JPG JPG image
AttachmentJ6_Page3_Stockpile_areas.docx DOCX document
AttachmentJ6_Page1_temp_culvert_location.docx DOCX document
AttachmentJ6_Page5_AerialOption2.jpg JPG image
AttachmentJ6_Page2_Temp_culvert_location_2.docx DOCX document
CrookedRiverAmend1.pdf PDF
SiteTourNotes.docx DOCX document
Attachment3CRVR_Option2CoverSheet_signed.pdf PDF
Attachment3Crooked_RiverOption2Drawings.pdf PDF
Attachment2Tech_Specs_OPTION2_3-23-17.docx DOCX document
FinalConstructionRFP.docx DOCX document
Attachment4CRVR_Construction_SWPPP_Option2.docx DOCX document
Show all 12

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors