New Orleans To Venice, Non-Federal Levee, Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA (ED 20-030)
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W912P824B0050
- Agency
-
ENDIST New Orleans
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Y1KF Construction Of Dredging Facilities
- Place of performance
- Louisiana, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, New Orleans District is soliciting bids for the New Orleans To Venice, Non-Federal Levee, Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA (ED 20-030). The project involves wetland restoration through borrow dredging and placement of material to create a marsh platform. Key requirements include construction of retention dikes, surveys, and all related operations. The magnitude of construction is estimated to be between $25,000,000 and $100,000,000. The solicitation is an unrestricted procurement with a NAICS code of 237990. Important dates include the bid submission deadline of September 17, 2024 and the public bid opening on the same date.
This is an unrestricted procurement, meaning it is open to all qualified offerors. The location of performance is in Louisiana, USA. The government's estimate for the base work is $19,991,176, with an additional $1,237,279 for optional work. Three offers were received, with the low bid being $37,800,050 and the high bid $49,030,300. The contract was awarded on September 17, 2024.
Notice text
3 versions
Update #3 · Latest ·
New Orleans To Venice, Non-Federal Levee Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA.
This is an UNRESTRICTED procurement. NAICS code is 237990.
The work consists of wetland restoration in existing shallow open water area via borrow dredging from a designated borrow pit within Lake Pontchartrain. Material will be placed within the marsh creation area to the desired project marsh elevation. The work requires construction of retention dikes, surveys, and all operations incidental thereto. Degrading of dikes and additional excavation will be required after construction of the marsh platform has been finalized.
****************************************************************************************************************************************************
Amendment 0001 - Magnitude of work changed to between $10,000,000 and $25,000,000.
****************************************************************************************************************************************************
Amendment 0002 - Duration revision from page 32 of solicitation package. The correct duration is 350 days total (255 days for Base Work and 95 days for Optional Work).
Update #2 ·
New Orleans To Venice, Non-Federal Levee Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA.
This is an UNRESTRICTED procurement. NAICS code is 237990.
The work consists of wetland restoration in existing shallow open water area via borrow dredging from a designated borrow pit within Lake Pontchartrain. Material will be placed within the marsh creation area to the desired project marsh elevation. The work requires construction of retention dikes, surveys, and all operations incidental thereto. Degrading of dikes and additional excavation will be required after construction of the marsh platform has been finalized.
****************************************************************************************************************************************************
Amendment 0001 - Magnitude of work changed to between $10,000,000 and $25,000,000.
Update #1 ·
New Orleans To Venice, Non-Federal Levee Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA.
This is an UNRESTRICTED procurement. NAICS code is 237990.
The work consists of wetland restoration in existing shallow open water area via borrow dredging from a designated borrow pit within Lake Pontchartrain. Material will be placed within the marsh creation area to the desired project marsh elevation. The work requires construction of retention dikes, surveys, and all operations incidental thereto. Degrading of dikes and additional excavation will be required after construction of the marsh platform has been finalized.
The magnitude of construction is between $25,000,000 and $100,000,000.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| New Orleans To Venice, Non-Federal Levee, Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA (ED 20-030) | Award Notice | |
| This notice | Solicitation | |
| New Orleans To Venice, Non-Federal Levee, Mitigation Project, Fritchie Marsh, St. Tammany Parish, LA (ED 20-030) | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity