New Contract - Mow & Trim/Grounds Maintenance/Transportation of Remains - Ohio Western Reserve National Cemetery.

Award Notice Posted

Solicitation number
36C78619Q0006
Agency
Awarded
to Nelson Land Care, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
36C78619D0032 Federal IDV award
NAICS code
561730 Landscaping Services
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Awarded Vendors: NELSON LAND CARE, INC;44 S MAIN ST;RITTMAN;OH;44270. Contract Award Dollar Amount: $0.00. Contract Award Date: 2018-10-15.

Update #2 ·


Ohio Western Reserve National Cemetery Questions Sol # 36C78619Q0006
1) 1.3.5 States that leaves will be removed from the cemetery daily. Would it be possible to have a dumpster on site at the contractor s expense and have this dumped weekly until leaves are finished? No
2) 1.7 Mulching Historically how many cubic yards of mulch per application have been has been used? Approx. 35 cubic yards
3) 1.7.6 To clarify the contractor can only use hand devices such as wheel barrows to install mulch that is inside turf areas, an ATV cart with turf tires can not be used. Hand devices only.
4) 1.8.1 Can herbicides be used in conjunction with the hand pulling of weeds? No
5) 1.9 (a) states the # of acers to be over seeded will be determined by the COR. However, the pricing schedule item #0008 list 20 ac and the unit is job. How will this be paid if the acreage is under or over the 20 ac.? Should this line item be a per AC price without minimum or maximum acreage since the qty is undetermined? The contractor is to purchase seed for 20 acres. The cemetery COR will tell him where to apply it.
6) 1.11 (b) States that acreage is to be determined by the COR and can be ordered from 1 40 ac. However 0010 of the pricing schedules only allows the contractor to price the job for 40 ac.. Should this be priced by acreage, and how will payment be made if application is under the 40 ac? 40 acres is to be applied.
7) E.1.19 States, Subsequent mowing s of the turf grass areas will occur at a mowing height of 3 inches or as directed by the COR. At no time will more than 1/2 inch of new growth be removed at any single mowing unless directed by the COR. When grass reaches 3 ½ inches anywhere in the cemetery it is to be mowed back to 3 inches. Item 0012 of the pricing schedule has Qty of 39 for mowing 40 ac. If less acreage is determined to be cut be cut due to the growth rate, how will this be invoiced? Will the contractor be able to invoice for a completed qty of the line item #0012. When a mowing cycle is requested by the COR the entire cemetery is to be serviced.
8) How many acres are there that are to be hand mowed? Approx. 2 acres total.
9) In the bold print at the end of section 3.19 it states that G-3 and areas at the Committal shelter is to be hand mowed. However, in the paragraph above there are several areas that are stated that will be hand mowed. Which is correct? Approx. 2 acres ( 3 Shelters, G-3, And section 15.)
10) E.23 states that no motorized equipment will be allowed on turf areas . However, to get equipment to a site may require it go over a turf area to get there. For example, a mechanical roller is to be used to roll all installed sod. This equipment weights several hundred pounds. The question is that, are there exceptions to this rule understanding that the contractor is responsible for repair of any existing turf that is damaged? After all the sod has been installed the Contractor will roll the sod with a mechanical roller to smooth the surface and to help bring the sod layer into a good contact with the soil surface. A mechanical roller is hand operated. Therefor no machine should be needed.
11) O1.1 States, In addition, the Contractor will not use small truckster units and/or walk-behind, manual application methods when making turf applications in any Specialty Area - so that damage to Government property does not occur. Industry standard equipment would be a workman cart with turf tires and spray tank with both a boom and spray hose or a hopper for granular applications. The equipment is designed to drive over turf areas and not damage the turf. This equipment also allows for efficient uniform application of the product being applied. What is the approved equipment for the turf applications? Statement should read The contractor will use small truckster/walk behind for this application.
12.         On page 3 E 1.3 Leaf Removal the scope states that daily leaf removal is required and can include more than 1 leaf removal cycle in a day. The unit for this CLIN is job with a quantity of only 26. The requirement is November April which would be approximately 26 weeks. Is the contractor required to work several times during a week if needed but can only charge for 1 job for that week s work? Or will the contractor be able to charge per each job requests? Please change clin quantity to -105
Also under this section, will this CLIN be as requested or will the contractor need to inspect the cemetery each day to see if the service is needed and then get approval to do the work? The scope states the committal shelters have to have leaf removal done by 9am daily. Contractor will be notified the day before.
Under leaf removal during each leaf removal are you requesting leaves to be removed from gutters as well? No
13.        Page 5 (d) 1. Over-seeding will be done after aeration in early September. Since the Government wants the contractor to do the aeration, what CLIN needs to be used for the pricing?  Cemetery will do the aeration.
14.        When the acreage increases in 2021 from 40 acres to 70, will there be more landscaping beds that will need mulch? If so, will the request be made at that time for a price? Or would you like the price added in on CLIN 6? If so, what is the expected increase in SQFT to be mulched? Cemetery will mulch any beds in the expansion until the contract goes out for a new bid.
15. How often will mulch be required to be turned? Mulch is to be turned once in between new application.
16. Page 8, E 1.19 Mowing states --- When a mowing is requested and started it must continue uninterrupted until completed. Does the mean the mowing, trimming, and edging must be completed the same day it begins? Correct
17. For CLINs that will be done as requested, what is the required timeframe to begin work? For example Mulching beds. This is an item that must be ordered and a contractor has no control over the availability of mulch. Will this be a scheduled task so the mulch can be pre-ordered? 1 week from the date the contractor is notified.
18. Is mowing, trimming, and edging to be an expected weekly service during the growing season? Page 7 states that the cemetery is to be serviced as Priority 1 standards with all grass maintained at 3 inches and once the grass grows to 3 1/5 inches it is to be mowed again. Will mowing and trimming be done by request or a scheduled task with a few requests when needed? If it is by request, what is the expected turn around time to service the cemetery once the contractor is contacted? 1-2 days per stated in the contract. E 1.19 MOWING PRIORITY 1 AREAS (0001) The contractor will begin the mowing season 1-2 days once notified by the COR of and continue throughout entire growing season as directed by the COR with the final mowing occurring as seasonal growth has ceased ending in the fall as directed by the COR. When a mowing is requested and started it must continue uninterrupted until completed. Turf areas consist of different blends and mixtures of cool-season turf grasses (perennial ryegrass, fescues, Kentucky bluegrass).Â
19. Is floral pick up on a daily or weekly pick up schedule throughout the entire cemetery included within the trash and debris clins? Is emptying all trash receptacles on a daily basis also part of this requirement?
U 1.1 Definitions.
11. TRASH AND DEBRIS. Any item, material, or foreign object not permanently attached to or planted within the grounds and boundaries. Items include - but are not limited to - fallen twigs and branches that are under ten (10) inches (25.40 cm) in diameter, paper products, cigarette butts, gum, glass and metal products, plastic and any other synthetic item, plus loose rock and stone over three (3) inches (7.62 cm) in diameter that are not the apparent result of an interment. Also included is the material found within the trash receptacles located on the grounds. Yes, line item for trash pickup qty 144 added
20. Within the contract is there a requirement to spray/treat trees for insects and disease? No spraying of trees. Consist of limb removal/Pruning ext.
D 1.1 GENERAL REQUIREMENTS: Requirements. (1) Work consists of shrub/tree management, tree removal/replacement, leaf removal, broadleaf herbicide application, pre-emergence herbicide application, fertilization, mulching, weeding, overseeding, soil testing, fungicide and insecticide applications. No storage on cemetery grounds will be permitted. Page 2 of 17 (2) All work described herein are estimated quantities and may be adjusted depending on need and/or at the discretion of the COR. (3) All dates in all the following requirements are for approximate dates only. The COR will make the determination of when each line item of this contract will be performed.Â
E 1.2 Shrub/Tree Management/Perimeter Vegetation/ Tree Removal. No spraying of trees. Consist of limb removal/Pruning ext.
21. What is the square footage for areas the will be needing mulched? What kind and color of mulch is required? Mulch to be used is Approx.. 24 yards and should match what is currently being used brown organic.
E 1.7 Mulching (Trees and Planting Beds)
22. Can a greens dumpster and a trash dumpster be staged on the property within the spoils area or maintenance for removal of all trash and debris? As there is no onsite storage in this contract the contractor will need to provide his on refuse facility off site.Â
K 1.1 Contractor-furnished Items.
(g) The contractor will provide his/her own REFUSE FACILITIES. The contractor will be required to dispose of all debris and other waste materials generated by his/her work at a licensed off-site landfill unless otherwise directed by the COR(s).Â
23. Will there be a need for 2 casket carriers at the same time? Yes at times. Are all urns also transported by the contractor to the internment sites or columbarium locations? yes Does this also include pick ups at the administration building as well? yes How likely or what is the percentage of times there are 2 services going at the same time? As the cemetery cannot predict when burial services will be scheduled. The cemetery schedule is set up to have a service every 15 minutes starting at 0930. The contractor must arrive for pick up no more than 5 minutes once contacted that a service is over. It is the contractor s responsibility to provide adequate man power so that there are no delays between services.
24. PLEASE SUBMIT YOUR PRICING USING THE ATTACHED UPDATE PRICE SCHEDULE.
25. Date for offer submission is hereby extended to September 21, 2018 at 12:00 noon.
26. All other terms and conditions remain unchanged..

Update #1 ·

RFQ FOR COMMERCIAL ITEMS
GENERAL INFORMATION
Document Type: Combined Synopsis Solicitation Tiered Evaluation
Solicitation Number: 36C78619Q0006
Post Date: 08/27/2018
Original Response Date: 09/17/2018 at 12:00 pm
Applicable NAICS: 561730
Classification Code: S208
Set Aside Type: Service Disabled Veteran Owned Small Business
Period of Performance: Date of Award September 30, 2019 with (4) one-year options if exercised
Issuing Contracting Office: Department of Veterans Affairs
National Cemetery Administration, Contract Services
75 Barrett Heights Rd., Suite 309
Stafford, VA 22556
Place of Performance: Ohio Western Reserve National Cemetery
10175 Rawiga Road
Seville, OH 44273
Attachments: A Wage Determination No. 2015-4727, Revision 6
B Performance Work Statement
C Past Performance Questionnaire
D List of References
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued. This solicitation is issued as a Request for Quotation (RFQ), solicitation number 36C78619Q0006
This solicitation incorporates provisions and clauses in effect through Federal Acquisition Circular (FAC) 2005-100 Effective August 22, 2018.
This is a 100% set-aside for Service Disabled Veteran Owned Small Business
TIERED EVALUATIONS INCLUDING SMALL BUSINESS CONCERNS
This solicitation is being issued as a tiered evaluation for SDVOSB concerns, or
in the alternative, a tiered evaluation for VOSB concerns, or in the alternative,
a set aside for other small business concerns with HUBZone small business
concerns and 8(a) participants having priority. If award cannot be made, the
solicitation will be cancelled and the requirement resolicited
The applicable North American Industrial Classification System (NAICS) code for this procurement is 561730, with a business size standard of $7.5 million.
This notice shall not be construed as a commitment by the Government to ultimately award a contract, nor does it restrict the Government to a particular acquisition approach.
The U.S. Department of Veterans Affairs, National Cemetery Administration, anticipates the award of a Firm Fixed Priced Requirements Contract.
Scope: The contractor shall be responsible for providing grounds maintenance to include mow and trim, edging, pre & post emergence herbicide, fertilization, insecticide, over seeding, mulching, leaf removal, shrub and tree management, soil sampling, area preparation and sod laying, transportation of remains at Ohio Western Reserve National Cemetery.
PRICE SCHEDULE: Contractor shall provide all labor, supervision, material, equipment, tools and supplies to complete grounds maintenance services and transport of remains at Ohio Western Reserve National Cemetery located in Seville, Oh 44273 following National Cemetery Administration standards. Units and services to be in accordance with Performance Work Statement, Technical Specifications, Performance Incentives/Disincentives, terms and conditions contained in this solicitation.
The schedule price shall be all-inclusive, including all labor, equipment, materials, and supplies to complete the Contract Line Items (CLINs). Offerors shall enter unit price and total amounts for each CLIN as indicated in the schedule. In the event there is a difference between a unit price and the extended total amount, the unit price will be held to be the intended bid price and the total of the CLINs will be recomputed accordingly.
Offeror is to understand the quantities stated in the schedule are estimates for pricing purposes only.
SCHEDULE OF UNIT PRICES
Base Period: Date of Award through September 30, 2019
CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
0001
Shrub/Tree Management
2
EA
$______
$_________
0002
Leaf Removal
26
JB
$______
$_________
0003
Broadleaf Herbicide Application
2
EA
$______
$_________
0004
Pre-Emergence Herbicide Application
2
EA
$______
$_________
0005
Granular Fertilizer Application
3
EA
$______
$_________
0006
Mulching (tree rings/planting beds)
3
EA
$______
$_________
0007
Weeding (planting beds/tree rings)
14
JB
$______
$_________
0008
Over-seeding 20 Acres
1
JB
$______
$_________
0009
Soil Sample
1
EA
$______
$_________
0010
Insecticide Application (40 Acres)
1
JB
$______
$_________
0011
Curb and sidewalk edging
18
JB
$______
$_________
0012
Mowing
39
JB
$______
$_________
0013
Trimming edging
39
JB
$______
$_________
0014
Prep areas, furnish, deliver and install Kentucky Blue rye grass sod in cemetery burial section and/or areas as directed by the COR. Areas will be raked, graded and prepped by the contractor. All sod and fill materials that are needed will be furnished by the contractor on an as needed basis upon request.
75,000
SF
$______
$_________
0015
Transportation of remains.
3,000
EA
$______
$_________
Estimated Total Cost Base Period:Â
$__________
Option Period 1: October 1, 2019 through September 30, 2020
Â
Â
Â
Â
CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
1001
Shrub/Tree Management
2
EA
$______
$_________
1002
Leaf Removal
26
JB
$______
$_________
1003
Broadleaf Herbicide Application
2
EA
$______
$_________
1004
Pre-Emergence Herbicide
Application
2
EA
$______
$_________
1005
Granular Fertilizer Application
3
EA
$______
$_________
1006
Mulching (tree rings/planting beds)
3
EA
$______
$_________
1007
Weeding (planting beds/tree rings)
14
JB
$______
$_________
1008
Over-seeding (20 Acres)
1
JB
$______
$_________
1009
Soil Sample
1
EA
$______
$_________
1010
Insecticide Application (40 Acres)
1
JB
$______
$_________
1011
Curb and sidewalk edging
18
JB
$______
$_________
1012
Mowing
39
JB
$______
$_________
1013
Trimming/Edging
39
JB
$______
$_________
1014
Prep areas, furnish, deliver and install Kentucky Blue rye grass sod in cemetery burial section and/or areas as directed by the COR. Areas will be raked, graded and prepped by the contractor. All sod and fill materials that are needed will be furnished by the contractor on an as needed basis upon request.
75,000
SF
$______
$_________
1015
Transportation of remains.
3,100
EA
$______
$_________
Estimated Total Cost Option Period 1:Â
$__________
Option Period 2: October 1, 2020 through September 30, 2021
Â
Â
Â
Â
CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
2001
Shrub/Tree Management
2
EA
$______
$_________
2002
Leaf Removal
26
JB
$______
$_________
2003
Broadleaf Herbicide Application
2
EA
$______
$_________
2004
Pre-Emergence Herbicide Application
2
EA
$______
$_________
2005
Granular Fertilizer Application
3
EA
$______
$_________
2006
Mulching (tree rings/planting beds)
3
EA
$______
$_________
2007
Weeding (planting beds/tree rings)
14
JB
$______
$_________
2008
Over-seeding (20 Acres)
1
JB
$______
$_________
2009
Soil Sample
1
EA
$______
$_________
2010
Insecticide Application (40 Acres)
1
JB
$______
$_________
2011
Curb and sidewalk edging
18
JB
$______
$_________
2012
Mowing
39
JB
$______
$_________
2013
Trimming/Edging
39
JB
$______
$_________
2014
Prep areas, furnish, deliver and install Kentucky Blue rye grass sod in cemetery burial section and/or areas as directed by the COR. Areas will be raked, graded and prepped by the contractor. All sod and fill materials that are needed will be furnished by the contractor on an as needed basis upon request.
75,000
SF
$______
$_________
2015
Transportation of remains.
3,200
EA
$______
$_________
Estimated Total Cost Option Period 2:
Â
Â
Â
$__________
Option Period 3: October 1, 2021 through September 30, 2022
Â
Â
Â
Â
CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
3001
Shrub/Tree Management
2
EA
$______
$_________
3002
Leaf Removal
26
JB
$______
$_________
3003
Broadleaf Herbicide Application
2
EA
$______
$_________
3004
Pre-Emergence Herbicide Application
2
EA
$______
$_________
3005
Granular Fertilizer Application
3
EA
$______
$_________
3006
Mulching (tree rings/planting beds)
3
EA
$______
$_________
3007
Weeding (planting beds/tree rings)
14
JB
$______
$_________
3008
Over-seeding (20 Acres)
1
JB
$______
$_________
3009
Soil Sample
1
EA
$______
$_________
3010
Insecticide Application (70 Acres)
1
JB
$______
$_________
3011
Curb and sidewalk edging
18
JB
$______
$_________
3012
Mowing
39
JB
$______
$_________
3013
Trimming/Edging
39
JB
$______
$_________
3014
Prep areas, furnish, deliver and install Kentucky Blue rye grass sod in cemetery burial section and/or areas as directed by the COR. Areas will be raked, graded and prepped by the contractor. All sod and fill materials that are needed will be furnished by the contractor on an as needed basis upon request.
75,000
SF
$______
$_________
3015
Transportation of remains.
3,300
EA
$______
$_________
Total Cost Option Period 3:
$__________
Option Period 4: October 1, 2022 through September 30, 2023
Â
Â
Â
Â
CLIN
Operation
Est. Quantity
Unit
Unit Cost
Total Cost
4001
Shrub/Tree Management
2
$______
$_________
4002
Leaf Removal
26
$______
$_________
4003
Broadleaf Herbicide Application
2
$______
$_________
4004
Pre-Emergence Herbicide Application
2
$______
$_________
4005
Granular Fertilizer Application
3
$______
$_________
4006
Mulching (tree rings/planting beds)
3
$______
$_________
4007
Weeding (planting beds/tree rings)
14
$______
$_________
4008
Over-seeding (20 Acres)
1
$______
$_________
4009
Soil Sample
1
$______
$_________
4010
Insecticide Application (70 Acres)
1
$______
$_________
4011
Curb and sidewalk edging
18
$______
$_________
4012
Mowing
39
$______
$_________
4013
Trimming/Edging
39
$______
$_________
4014
Prep areas, furnish, deliver and install Kentucky Blue rye grass sod in cemetery burial section and/or areas as directed by the COR. Areas will be raked, graded and prepped by the contractor. All sod and fill materials that are needed will be furnished by the contractor on an as needed basis upon request.
75,000
$______
$_________
4015
Transportation of remains.
3,400
$______
$_________
Total Cost Option Period 4:
$__________
Total Aggregate Cost Base Period and All Options
Â
Â
Â
$__________
Services to be Provided: See Attachment B Performance Work Statement
SITE VISIT: Offerors are urged and expected to inspect all sites where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance. In no event shall failure to inspect a one or all sites constitute grounds for a claim after contract award. If you plan to conduct a site visit / inspection of the Ohio Western Reserve National Cemetery, YOU MUST CONTACT one of the following personnel to make arrangements:
Mark Polen, Director; Phone:330-335-3069 ex.t: 105
Brian Cheesman, Foreman, Phone 330-725-6435
Responses to this Request for Quotation (RFQ) are due to the Contracting Officer no later than 12:00 pm on 09/17/2018. Responses to this announcement will result in a Firm-Fixed Price Requirements Contract and the Government intends to make award without discussions. All information submitted in response to this announcement is voluntary and the Government will not pay for information provided nor will it compensate any respondent for any cost incurred in developing information provided for the Government. Offerors are responsible for obtaining any and all amendments or additional information concerning this announcement at https://fbo.gov.
All questions regarding this solicitation are to be submitted to the contracting officer, via email, no later than (5) calendar days before the closing date of the solicitation. Questions will not be addressed using the telephone.
Proposal Format and Submission Information:
Offers must be submitted on company letterhead. Commercial format is encouraged. All offerors shall include the following information as part of their quote:
Legal Business/Company Name (as listed in www.sam.gov)
DUNS Number
Point of Contact Name
Telephone number
Email Address
-Pricing shall be submitted as requested in the Schedule of Supplies/Services
-Technical Package for Evaluation
-Past Performance Questionnaire (Attachment C)
-List of References (Attachment D)
Proposals shall be submitted via email or via mail to the following addresses:
Email: john.carlock@va.gov
Mail: 575 N. Pennsylvania Street
Midwest District, Suite 495
Indianapolis, IN 46204
For proposals mailed, proposals shall be submitted on compact disk (CD) and files shall be in either Microsoft Word or Adobe pdf formats. DVDs are not acceptable as the Government computer is unable to read this media type. Any DVDs received in response to this announcement will be rated as technically unacceptable and removed from consideration.
Questions pertaining to this announcement shall be sent by email to: john.carlock@va.gov . Telephone inquiries will not be accepted.
Evaluation Process:
The Government intends to award a firm fixed price, Requirements contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation that provides the best benefit to the Government, price and other factors considered. Offers will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the best as a whole.
Quotes will be evaluated by performing a direct comparison of one offer with another in a uniform manner to determine which quote provides the government with its needs, as identified in the RFQ. The government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the government. The government has the discretion to accept other than the lowest priced offeror that provides additional benefits. The government also has the discretion to make an award based on whether the lowest priced of the quotations/offers having the highest past performance rating possible represents the best benefit to the government.
The following factors shall be used to evaluate offers:
Pricing: The sum of all the CLINs, to include options, will represent the total evaluated price. Proposed price must be determined to be fair and reasonable in order to be eligible for award.
Technical Acceptability
Demonstrated experience performing this requirement
Demonstrated qualifications to perform services
Use of Sub-Contractors
Contractor SHALL have a license to conduct business in the state of Ohio and shall submit a copy with their offer
Past Performance
SDVOSB Status verification in CVE
Proposal Contents:
-Pricing shall be submitted as requested in the Schedule of Supplies/Services.
-Technical Package for Evaluation
The following shall be included as part of the offeror s submission:
Experience of company and subcontractors anticipated to perform work under this contract
Managerial & Technical Qualifications of key personnel
Qualifications of any proposed sub-contractors and the percentage of work they will be performing.
-Past Performance. The offeror is responsible for providing three (3) references of their choosing. Send a copy of the attached Past Performance Questionnaire (Attachment C) for their completion. The completed questionnaire is to be returned to the Contracting Officer for review. The completed questionnaires shall be sent to: john.carlock@va.gov no later than the solicitation s closing date and time. The references chosen by the offer should be selected based on past projects of the same or similar work.
In addition to the past performance questionnaires, the offeror is responsible for providing a completed copy of the List of References (Attachment D) to the contracting officer. The completed list of references shall be included with the offeror s proposal submission.
Solicitation Provisions and Contract Clauses
The full text of FAR/VAAR provisions or clauses may be accessed electronically at http://acquisition.gov/comp/far/index.html.
https://www.va.gov/oal/library/vaar/
The following solicitation provisions apply to this acquisition:
FAR 52.212-1 Instructions to Offerors Commercial Items (Aug 2018)
VAAR 852.270-1 Representatives of Contracting Officers (Jan 2008)
VAAR 852.215-70 VA Notice of Total Service-Disabled Veteran-Owned Small Business Evaluation Factors
Offerors must complete annual representations and certifications on-line at http://orca.bpn.gov in accordance with FAR 52.212-3 Offerors Representations and Certifications Commercial Items. If paragraph (j) of the provision is applicable, a written submission is required.
The following solicitation clauses apply to this acquisition:
The clause at 52.212-4, Contract Terms and Conditions Commercial Items (Jan 2017) applies to this acquisition.
Addendum to FAR clause 52.212-4, Contract Terms and Conditions Commercial Items (Jan 2017):
FAR 52.216-18 Ordering (Oct 1995) (date of award through September 30, 2019)
FAR 52.216-19 Order Limitations (Oct 1995) ($250.00 | $25,000.00 | $45,000.00| 30 days)
FAR 52.216-21 Requirements (Oct 1995) (September 30, 2019)
FAR 52.217-8 Option to Extend Services (Nov 1999) (15 days)
FAR 52.217-9 Option to Extend the Term of the Contract (Mar 2000)
FAR 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Dec 2013)
FAR 52.237-3 Continuity of Services (Jan 1991)
VAAR 852.203-70 Commercial Advertising (Apr 2018)
VAAR 852.219-74, Limitations on Subcontracting Monitoring and Compliance (Jul 2018)
VAAR 852.232-72 Electronic Submission of Payments Requests (Nov 2012)
VAAR 852.237-70 Contractor Responsibilities (Apr 1984)
The clause at 52.212-5 Contract Terms and Conditions Required to Implement Statutes or Executive Orders (Aug 2018) applies to this acquisition. The following subparagraphs of FAR 52.212-5 are applicable: (b)(4), (b)(18), (b)(22), (b)(25), (b)(26), (b)(27), (b)(28), (b)(30), (b)(33)(i), (b)(42), (b)(49), (b)(55), (c)(2), (c)(8), and (c)(9).
(c)(3) 52.222-42 Statement of Equivalent Rates for Federal Hires (May 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67)
Employee Class
Monetary Wage Fringe Benefits
Laborer, Grounds Maintenance WG 3-1
$14.84 + $4.50
Laborer, Grounds Maintenance WG 3-3
$16.08+ $4.50
Laborer, Grounds Maintenance WG 3-5
$17.32 + $4.50
End of Addenda
End of Document.

Files

File Type Posted
36C78619D0032-000.docx DOCX document
36C78619Q0006-0001000.docx DOCX document
36C78619Q0006-003.pdf PDF
36C78619Q0006-002.pdf PDF
36C78619Q0006-001.pdf PDF
36C78619Q0006-000.docx DOCX document

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors