NE FLAP 7136(1), Montrose Bridge Repair

Award Notice Posted

Solicitation number
6982AF-18-B-000010
Agency
Awarded
to Battle Ridge Builders, LLC
Set-aside
No set-aside

Opportunity facts

Contract number
6982AF18C000030 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Sioux County, Nebraska Harrison, Nebraska 69346, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS IS A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE AVAILABLE.

Montrose Bridge is in Sioux County, Nebraska approximately 25 miles northeast of Harrison Nebraska. The bridge is on Montrose Road and crosses over Hat Creek. Montrose Road is owned and maintained by Sioux County. The road provides access to Oglala National Grasslands.

This project consists of replacing the existing bridge with a new prefabricated steel bridge with structural steel decking and aggregate wearing surface. The existing abutment piles and wingwalls will be reused, to the maximum extent possible, with additional piles being added to provide adequate support. Bridge transition railing will be added, which the original bridge did not have.

The existing roadway approaches will be widened to match the new bridge width and the existing roadway width. Additionally, the widening will allow the installation of the transition railing and end terminals.

The road will be closed during construction and the project is expected to take 3 months.


Items worth noting:
Sioux County will be performing work as part of the match, so coordination between the County and the Contractor will be critical.

Bridge submittals and manufacturing will be a long duration item; therefore, they may need to be addressed before NTP is given.

Principal Work Items
20304-2000 Removal of Bridge (Partial Substructure)
20304-4000 Removal of Bridge Superstructure
20420-0000 Embankment Construction
55104-1000 Steel H-Pile, 14x89, In Place
55201-0200 Structural Concrete, Class A(AE)
55401-2000 Reinforcing Steel, Epoxy Coated
55504-0000 Pre-Fabricated Steel Bridge (104'x20', 1-Lane)

The anticipated range for the project is $500K to $1Million 

A pre-bid meeting notice is being posted to solicit contractor interest and to orient contractors with the project site prior to the bid opening. Representatives from the Federal Highway Administration (FHWA) will provide a site visit information on Monday April 23, 2018, from 1:00 p.m. Mountain time to approximately 3:00 p.m. Mountain time.

Update #1 ·

 THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

THIS NOTICE IS A PRE-SOLICITAION NOTICE TO INFORM QUALIFIED PRIME CONTRACTORS THAT A SOLICTION WILL BE RELEASE NEAR THE MIDDLE OF APRIL FOR: PROJECT DETAILS:  NE FLAP 7136(1), Montrose Bridge


Montrose Bridge is in Sioux County, Nebraska approximately 25 miles northeast of Harrison Ne. The bridge is on Montrose Road and crosses over Hat Creek. Montrose Road is owned and maintained by Sioux County. The road provides access to Oglala National Grasslands.


This project consists of replacing the existing bridge with a new prefabricated steel bridge with structural steel decking and aggregate wearing surface. The existing abutment piles and wingwalls will be reused, to the maximum extent possible, with additional piles being added to provide adequate support. Bridge transition railing will be added, which the original bridge did not have.


The existing roadway approaches will be widened to match the new bridge width and the existing roadway width. Additionally, the widening will allow the installation of the transition railing and end terminals.


The road will be closed during construction and the project is expected to take 3 months.

Items worth noting:

Sioux County will be performing work as part of the match, so coordination between the County and the Contractor will be critical.

Bridge submittals and manufacturing will be a long duration item; therefore, they may need to be addressed before NTP is given.

Principal Work Items

20304-2000 Removal of Bridge (Partial Substructure)

20304-4000 Removal of Bridge Superstructure

20420-0000 Embankment Construction

55104-1000 Steel H-Pile, 14x89, In Place

55201-0200 Structural Concrete, Class A(AE)

55401-2000 Reinforcing Steel, Epoxy Coated

55504-0000 Pre-Fabricated Steel Bridge (104'x20', 1-Lane)

It is anticipated that the project will be advertised in April, 2018 with a Notice to Proceed issued in June, 2018.  The anticipated range for the project is $500k to $1 million.

THIS IS NOT A REQUEST FOR BID - PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.

Files

Show all 13

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors