Sheet 1 of 2

SYMBOLS AND ABBREVIATIONS

CONVENTIONAL PLAN

A2

ABBREVIATIONS DRAINAGE SYMBOLS

GEOLOGIC SYMBOLS

DI

FENCE & CATTLEGUARD SYMBOLS

Cattleguard (Existing, Proposed)

Fence w/ Gate (Existing, Proposed)

Fence (Existing, Proposed)

Material Source

Boring Location (Existing, Proposed)

Riprap Apron (Proposed)

Underdrain (Existing, Proposed)

With Drop Inlet (Existing, Proposed)

With Headwalls (Existing, Proposed)

With End Sections (Existing, Proposed)

Pipe Culvert (Existing, Proposed)

Box Culvert (Existing, Proposed)

Bridge (Existing, Proposed)

Spring

River

Wetland

Large Creek

Lake, Pond or Reservoir

Drainage or Small Creek

Flow Arrow

Ditch (Existing, Proposed)

SPRING

D jt.J int.

incr.

incl.

IDI

hwy.

HW

horiz.

hex.

HES

hdwl.H gdr.

galv.

ga.G ftg.

fin.

FES

Fed.

f.f.F ext.

exp. jt.

exc.

EW

et ux et al

ER

EQ or eq.

EOP

engr(s).

emb.

elev.

El. 94.066 e

EE

dwg(s).

DLC

Dist.

dist.

diaph.

diag.

dia. or D

DI

DHV

decr.D culv.

CTSM

ctrs.

CS

cr.

corr.

cont.

constr. jt.

constr.

conc.

col.

Co.

CMP

clr.

c-c

CBCC

brg.

br.

BP

BM

BK

beg.

b.f.B asph.

appr.

alt.

AH

aggr.

ADT

abut.A west vertical point of intersection vehicles per hour vertical design speed typical point of tangent to spiral transverse temporary construction easement temporary bench mark tangent township tangent length symmetrical structural straight stiffener standard station point of spiral to tangent street specification spacing, Spaces or Spaced shoulder section point of spiral to curve seasonal average daily traffic south route right reference hub retaining wall

Reservation reservoir required reinforcement reconstruction roadway road right-of-way range radius quantities pavement point of tangent pounds per square inch project point on tangent point on spiral point on curve plate point of intersection perforate point of compound curve point of curve outside diameter other face on centers number negative normal crown north mountain(s) monument minimum maximum material maintenance magnetic low water left lump sum longitudinal latitude lamination length of curve

WW

VPI

vph vert.

VV

typ.

TS

transv.

TCE

TBM

tan.

T.

TT

sym.

struc.

str.

stiff.

std.

sta.

ST

st.

spec.

spa.

shldr.

sec.

SC

SADT

SS

rte.

Rt. or RT

RH

ret. wall

Res.

res.

reqd.

reinf.

reconst.

rdwy.

rd.

R/W

R.

RR

quant., QtyQ pvmt.

PT

psi proj.

POT

POS

POC

pl.

PI

perf.

PCC

PCP

OD

o.f.

o.c.O

no. or # neg.

NC

NN

mtn(s).

mon.

min.

max.

matl.

maint.

mag.M

LW

Lt. or LT

LPSM

long.

lat.

lam.

LL

EROSION & SEDIMENT CONTROL SYMBOLS

joint interior increment inclusive,including inside diameter highway high water horizontal hexagon homestead entry survey headwall girder galvanized gage (gauge) footing finish flared end section federal fill face exterior expansion joint excavation edge of water and wife and others edge of road equation edge of pavement

Engineer(s) embankment elevation elevation with number superelevation rate east drawing(s) donation land claim district distance diaphragm diagonal diameter drop inlet design hour volume decrement culvert contingent sum centers point of curve to spiral creek corrugated continuous construction joint construction concrete column county corrugated metal pipe clear center to center concrete box culvert bearing bridge balance point bench mark back beginning,begin both faces asphalt approach alternate ahead aggregate average daily traffic abutment diameter curve delta centerline

Ø

Riprap

Rolled Erosion Control Product

Diversion Berm

Check Dam

Bonded Fiber Matrix Mulching

Fiber Roll (Slope Protection)

Temporary Inlet Protection

Silt Fence

Fiber Roll (Ditch and/or Cut Slope)

STATE PROJECT

A

M N N

E R o a d w a y C

A D

D S h e e ts A G e n s h t\

S Y

M .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

Montrose Bridge Repair

NE FLAP 7136(1)

SYMBOLS AND ABBREVIATIONS

CONVENTIONAL PLAN

Sheet 2 of 2

A3

36 31

36 31

6 1

ˆ

Treeline

Tree

MAPPING SYMBOLS

LANDSCAPING & VEGETATION SYMBOLS PROJECT SPECIFIC SYMBOLS

RIGHT-OF-WAY SYMBOLS

ROADWAY SYMBOLS

SIGN SYMBOLS

UTILITY SYMBOLS

Retaining Wall (Existing, Proposed)

Median & Side Barrier (Existing, Proposed)

Guardwall (Existing, Proposed)

Guardrail (Existing, Proposed)

GUARDRAIL, BARRIER & WALL SYMBOLS

Post Mounted (Existing, Proposed)

Portable (Proposed)

Delineator (Existing, Proposed)

Commercial (Existing, Proposed)

Signs

Telephone

Power

Fiber Optic

CATV

Overhead Utility Line (Existing, Proposed)

Water

Telephone

Sanitary Sewer

Power

Oil

Gas

Fiber Optic

CATV

Underground Utility (Existing, Proposed)

Telephone Pedestal (Existing, Proposed)

Telephone Booth (Existing, Proposed)

Street Light (Existing, Proposed)

Support Pole Anchor (Existing, Proposed)

Support Pole (Existing, Proposed)

Surface (Existing, Proposed)

Underground (Existing, Proposed)

Irrigation Ditch

999.9

Roadway Obliteration

Roadway Centerline (With Station ticks)

Proposed

Existing

Edge of Roadway

Toe of Fill

Transition

Top of Cut

Slope Stake Limits

Clearing/Construction Limits

Survey Control Point

Trail

Spot Elevation

Double Track

Single Track

Railroad

North Arrow

Coordinate Grid Tick

Building (Existing, Proposed)

Section Corner (Found)

Section Corner (Found, Projected)

Section Corner (Found, Projected)

Right-of-Way Line (Proposed)

Right-of-Way Line (Existing)

Property Line

Parcel Number

Monument (As described)

Temporary (Proposed)

Permanent (Proposed)

Permanent (Existing)

Easements

National Wildlife Refuge

National Park

National Forest

Bureau of Land Management

Bureau of Indian Affairs

Section

Section

Section

Township or Range Line

City

County

State

National

Boundaries

STATE PROJECT

A

M N N

E R o a d w a y C

A D

D S h e e ts A G e n s h t\

S Y

M .d

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

REVISIONS (OR CHANGE NOTICES)

DESCRIPTION

NO.

DATE INIT.

A4

SURVEY CONTROL

STATE PROJECT

A

M N N

E R o a d w a y C

A D

D S h e e ts A G e n s h t\

N E c o n tr o l_ s h e e t.

d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

PROJECT LOCATION

Crawford

25 m iles to

Church

Conception

Immaculate

31.50

Scale in Miles

H a r r is o n m ile s to

SITE MAP

A5

STATE PROJECT

A

M N N

E R o a d w a y C

A D

D S h e e ts A G e n s h t\

S T

E .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

Station to Station

LENGTH OF PROJECT

TOTAL (mi)

Roadway (ft) Bridge (ft)

MAINLINE

TYPICAL SECTIONS

NO SCALE

TOTALS (ft)

NOTE:

10+87.71 to 11+87.71

11+87.71 to 12+93.71

12+93.71 to 13+93.71 from 12' to 20'

Existing width varies

3" Existing aggregate surface course depth

1:4 and seeding limits

Topsoil and seeding limits

Topsoil

(variable)

Fill slope limit stake

Slope

1:4

2'

Station 12+93.71 to 13+93.71

Station 10+87.71 to 11+87.71

TYPICAL SECTION

Course

3" Aggregate Surface existing Match existing

Match

10' Traveled way 10' Traveled way

(va riab le)Fill slo pe

Existing ground limit stake

Slope

2' slope

Fore-

1'-0" slope

Fore-

1'-0"

3.3.

12+93.71 to 13+93.71

10+87.71 to 11+87.71

EXISTING TYPICAL SECTION

A6

11'-0" Subgrade 11'-0" Subgrade

Clearing and construction limits

3.

2.

1.

should be no steeper than 1:2.

fill slopes as necessary to tie into existing ground, but fill slopes

See the cross sections for cut and fill slope ratios. CO may adjust

Dimensions shown are approximate and may be varied by the CO.

Existing superelevated and widened sections are not shown.

Schedule A Option Y

0.04 0.02

STATE PROJECT

P

M N N

E R o a d w a y C

A D

D S h e e ts A G e n s h t\

T Y P .d

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

Sheet and Description

B6 S2

MISCELLANEOUS

SUMMARY BRIDGE ALLOWANCE Bid

Schedule

A0020 15101-0000 MOBILIZATION LPSM ALL

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL

A0060 15214-1000 SURVEY AND STAKING, BRIDGE LPSM ALL ALL

A0080 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL

A0100 15401-0000 CONTRACTOR TESTING LPSM ALL

A0120 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL

A0140 20304-2000 REMOVAL OF BRIDGE (SUBSTRUCTURE) LPSM ALL ALL

A0160 20420-0000 EMBANKMENT CONSTRUCTION (ABUTMENT) CUYD 120 120

A0180 20801-0000 STRUCTURE EXCAVATION CUYD 95 95 Contract Quantity

A0200 20803-0000 STRUCTURAL BACKFILL CUYD 30 30 Contract Quantity

A0220 55101-1900 STEEL H-PILE, 14 X 89, IN PLACE LNFT 291 291

A0240 55104-1000 DYNAMIC PILE LOAD TEST EACH 2 2

A0260 55201-0200 STRUCTURAL CONCRETE, CLASS A (AE) CUYD 31 31 Contract Quantity

A0280 55401-2000 REINFORCING STEEL, EPOXY COATED LB 3,400 3,400 Contract Quantity

A0300 55504-0000 PRE-FABRICATED STEEL BRIDGE (104'-0" x 20' modular steel vehicular bridge) LPSM ALL ALL

A0320 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 30

A0340 62201-1350 BULLDOZER, 200HP MINIMUM FLYWHEEL POWER HOUR 20

A0360 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10

A0380 62201-3000 HYDRAULIC EXCAVATOR HOUR 10

A0400 62301-0000 GENERAL LABOR HOUR 30

A0420 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 10

SUMMARY OF QUANTITIES - Schedule A

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

8- M ar -2

:3

A M

N

N E\

(1

R oa dw ay

\E st im at es _S ch ed ul es

\E ng in ee r Es tim at es

N E

FL

A P

(1

M on tr os e B ri dg e

0% S ch ed ul e

A.

xl sx ]S he et

STATE PROJECT

B1NE FLAP 7136(1)

Montrose Bridge RepairNE

SHEET

NUMBER

MISCELLANEOUS

SUMMARY BRIDGE ALLOWANCE Bid

Schedule

W0020 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 357 43 400

W0040 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 6 6

W0060 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE LNFT 355 355

W0080 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 110 110

SUMMARY OF QUANTITIES - Option W

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

8- M ar -2

:4

A M

N

N E\

(1

R oa dw ay

\E st im at es _S ch ed ul es

\E ng in ee r Es tim at es

N E

FL

A P

(1

M on tr os e B ri dg e

0% O pt io n W

.x ls x] Sh ee t

STATE PROJECT

B2NE FLAP 7136(1)

Montrose Bridge RepairNE

MISCELLANEOUS

SUMMARY BRIDGE ALLOWANCE Bid

Schedule

X0020 20304-4000 REMOVAL OF BRIDGE SUPERSTRUCTURE LPSM ALL ALL

SUMMARY OF QUANTITIES - Option X

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

8- M ar -2

:4

A M

N

N E\

(1

R oa dw ay

\E st im at es _S ch ed ul es

\E ng in ee r Es tim at es

N E

FL

A P

(1

M on tr os e B ri dg e

0% O pt io n X .x ls x]

Sh ee t

STATE PROJECT

B3NE FLAP 7136(1)

Montrose Bridge RepairNE

B7 S2

MISCELLANEOUS

SUMMARY BRIDGE ALLOWANCE Bid

Schedule

Y0020 20420-0000 EMBANKMENT CONSTRUCTION CUYD 101 19 120

Y0040 25101-0000 PLACED RIPRAP, METHOD A CUYD 29 6 35 Government furnished

Y0060 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 103 12 115 Government furnished

Y0080 62502-0000 TURF ESTABLISHMENT SQYD 373 27 400

SUMMARY OF QUANTITIES - Option Y

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

-M ar -2

1:

P M

N

N E\

(1

R oa dw ay

\E st im at es _S ch ed ul es

\E ng in ee r Es tim at es

N E

FL

A P

(1

M on tr os e B ri dg e

0% O pt io n Y.

xl sx

]S he et

STATE PROJECT

B4NE FLAP 7136(1)

Montrose Bridge RepairNE

B8 S2

MISCELLANEOUS

SUMMARY BRIDGE ALLOWANCE Bid

Schedule

Z0020 63301-0000 SIGN SYSTEM EACH 4 4

Z0040 63308-0000 OBJECT MARKER EACH 4 4

SUMMARY OF QUANTITIES - Option Z

A M E N D

Line Item No.

Pay Item Number Pay Item Description Unit

Estimated Quantities

Remarks and/or Determination of Estimated Quantity

8- M ar -2

:2

A M

N

N E\

(1

R oa dw ay

\E st im at es _S ch ed ul es

\E ng in ee r Es tim at es

N E

FL

A P

(1

M on tr os e B ri dg e

0% O pt io n Z .x ls x]

Sh ee t

STATE PROJECT

B5NE FLAP 7136(1)

Montrose Bridge RepairNE

B6

OPTION W

MISCELLANEOUS SUMMARY

STATE PROJECT

A

M N N

E R o a d w a y C

A D

D S h e e ts B S u m m T

A B

S .d

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

Aggregate surface course unit weight = 139 lb/cuft

OPTION Y

MISCELLANEOUS SUMMARY

B7

STATE PROJECT

P

M N N

E R o a d w a y C

A D

D S h e e ts B S u m m T

A B

S .d

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

OPTION Z

MISCELLANEOUS SUMMARY

B8

STATE PROJECT

A

M N N

E R o a d w a y C

A D

D S h e e ts B S u m m T

A B

S .d

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

STATE PROJECT

P

M N N

E R o a d w a y C

A D

D S h e e ts C

M L P

P P

N P .d g n

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

Montrose Bridge Repair

NE FLAP 7136(1)

P O

T

.0

P C

.7

P T

.3

P C

.6

P T

.6

P O

T

.1

0.000%

100'50'0

Scale in Feet

10+00 11+00 12+00 13+00 14+00

ONE LANE

BRIDGE

ONE LANE

BRIDGE

see S sheets

Begin bridge, 11+87.71

End bridge

12+93.71

E 638067.2400

N 1147092.6680

Station 10+00.00

E 638466.8990

N 1146905.5210

Station 14+45.12

Existing ground

Profile

Bridge

C1

Curve = MAIN-1

PI 11+27.71

R = 325.00'

T = 59.94'

L = 118.54'

D

Curve = MAIN-2

PI 13+43.21

R = 625.00'

T = 48.60'

L = 97.01'

D

MPH

MPH

wetlands

Do not disturb

El. 3589 to protect wetlands*

Place construction fence at

El. 3605.40

Sta. 12+93.71

End Bridge El. 3605.40

Sta. 11+87.71

Begin bridge

STA 13+93.71

NE FLAP 7136(1)

STA 10+87.71

NE FLAP 7136(1)

Install W5-3*** and W13-1P***

Install W1-2

Install OM3-L***

Install OM3-R*** for details*

See detail C157-50 clearing limits, typ.

Place silt fence along traveled way width**

Begin transition of

13+43.71, 10' Lt/Rt traveled way width**

End transition of

13+93.71, 6' Lt/Rt and W13-1P***

Install W1-2

Install W5-3***

Install OM3-R***

Install OM3-L*** ***This work to be completed under Option Z.

**This work to be completed under Option Y.

*This work to be completed under Option W.

STA 12+93.71

NE FLAP 7136(1)

RESUME OPT Y

END SCHED A

STA 11+87.71

NE FLAP 7136(1)

BEGIN SCHED A

SUSPEND OPT Y

overhead power line temporarily remove

County will

If required, Sioux

BEGIN OPT Y

BEGIN PROJECT

END PROJECT

END OPY Y

SILT FENCE

6" min. trench

6" min.

18" min.

30" min.

24" min.

C157-50

NOTE:

4.

3.

2.

1.

6 ft. (max.)

fence support mesh = withoutPost spacing

10 ft. (max.)

fence support mesh =withPost spacing running around the ends.

fence up the slope to prevent water from

As the slope is constructed, curve the silt contours as closely as possible.

Install silt fence to follow the ground manufacturer's recommendations.

machine-sliced silt fence according to the slicing as approved by the CO. Install

Silt fence may be installed using machine

DETAIL APPROVED FOR USE

REVISED: 08/2014

A

M N N

E R o a d w a y C

A D

D S h e e ts E C .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U.S. CUSTOMARY DETAIL

DETAIL

U s e r t h o m a s .m c c r a r y

STATE PROJECT

NUMBER

SHEET

NE

Montrose Bridge Repair

NE FLAP 7136(1)

E1

ELEVATION

PLAN

POST AND GEOTEXTILE INSTALLATION DETAIL

SILT FENCE INSTALLATION AT TOE OF FILL

Flow Fi ll slo pe

Flow

T o e o f s lo p e

Flow

(undisturbed)

Existing ground

END POSTS DETAIL

PLAN

PLAN

END DETAIL

ELEVATION

Fi ll sl op e

Steel or wood post

Backfilled and compacted soil

Limits of clearing

Steel or wood post

Varies

Varies

See Note 3 for spacing

See Note 4

Fasten fabric to posts.

around each post one full turn.

Fold geotextile fabric

NO SCALE

PLAN

T o e o f s lo p e

Note 3See

Staple or tie

Top of posts tied together.

Posts driven tightly together.

Steel or wood posts

POSTS AT JOINTS

See End Posts Detail

End posts

Geotextile fabric

Staple or tie

SILT FENCE AS PERIMETER CONTROL

Fill

Existing ground

Sheet flow Silt fence

PLAN

SECTION A-A

A

A

Roadway

Edge of shoulder

Edge of shoulder

Toe of slope

Toe of slope

Posts Detail

See End

End posts

Silt fence

Fence support mesh (optional)

Section A fabric

Geotextile

Section B

Geotextile fabric

Geotextile

See Typical Section Sheet

STATE PROJECT

SHEET

A

M N N

E R o a d w a y C

A D

D S h e e ts F C .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

U s e r t h o m a s .m c c r a r y

NE

Montrose Bridge Repair

NE FLAP 7136(1)

F1

SPECIAL

204-A

EMBANKMENT BENCHING

U.S. CUSTOMARY SPECIAL

NOTE:

2.

1.

EMBANKMENT BENCHING

8' bench height (typ.)

Top of subgrade bench height.

meet 12' minimum bench width and 8' typical

Bench into existing slope as necessary to

1V:3H or flatter.

Benching is not required for ground sloped at

12' (min.)

See Note 2

Proposed em bankm ent slope

Existing ground

Height varies pattern benching

Typical

Bridge Length = 106'-0"

H a t

C r e e k

C Rdwy.L

Drawing No. Description

BRIDGE DRAWING INDEX

Elev.

WS

ft/sec.

V ft /sec

Q

Q

Q100

HYDRAULIC DATA

ABUTMENTS

FOUNDATION PLAN

GENERAL NOTES

BRIDGE PLAN & ELEVATION

BRIDGE PLAN & ELEVATION

RG3029-A

RG3029-B

RG3029-C

RG3029-D

RG3029-E

PLAN

ELEVATION

A1" = 10'-0"K. EIKERMANN

Q

630 3.21

3598.96.465660

9210 6.80 3600.2

3591.2

RG3029-F

RG3029-G

S1 structural steel decking.

with steel girders and

Modular steel bridge Thrie Beam Bridge Railing

Approx. existing ground @ C RdwyL

3,610

3,605

3,600

3,5953,595

3,580

3,585

3,590

S ta

.7

B e g in B r id

El. 3605.40

El. 3605.40

El. 3605.40 at upstream face of bridge.

Note: Water surface elevations are

Elevations are at profile grade @ C Rdwy.

No Scale

PROFILE GRADE DIAGRAM

L

N

S ta

.7

E n d B r id

Abut. 1

Abut. 2

P T

.3

P C

.6

Horiz. Curve Data:

PI 13+43.21

R = 625.00'

T = 48.60'

L = 97.01'

EXISTING ABUTMENT 1

EXISTING ABUTMENT 2

Horiz. Curve Data:

PI 11+27.71

R = 325.00'

T = 59.94'

L = 118.54'

RG3029-H

SUMMARY OF BORING LOGS

L

Profile Grade

Grade = 0.000%

El. 3600.00 El. 3600.00

EXP

"4 11'-5

"2 1103'-1" = 2

133 spa. @ 3'-1

"4 11'-5

El. 3605.40

El. 3605.40

El. 3605.40

RG3029-I

TYPICAL SECTION

RG3029-K

WINGWALLS

Q WS El. 3598.950

RG3029-J

SLOPE PROTECTION

Q200 6.4012195 3601.5

100Q scour El. = 3577.9

EXP

3,575

El. 3601.7

Low chord

(typ.)

piles (typ.)

New HP 14x89 steel

-0.000%

REBAR LIST

embankment stabilization details.

See RG3029-E for Slope Protection and Approx. existing ground @ C Rdwy.

D. GERMANI

Bridge Railing Post spa. (typ. both sides) piles to stay in place (typ.)

" steel8 3Exist. 8"x8"x

E l.

.4

S ta

.7

B e g in B r id

E l.

.4

S ta

.7

E n d B r id existing profile grade

Bridge approaches match

(typ. @ all 4 corners)

Object marker

NO.

PROJECT

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

HAT CREEK BRIDGE

MONTROSE ROAD (COLL. 7136)

SIOUX COUNTY, NEBRASKA

DRAWING NO.DATEBRIDGE DRAWING

KARL EIKERMANN

PROJECT TEAM LEADERSCALE

CHECKED BY

DRAWN BY

R.WEHNER

DESIGNED BY

REVISIONS

BY

DATENO.

N

N E

(1

B r id g e R

G C

A D

F il e s D

G N

F il e s r g p e .d g

RG3029- of FEBRUARY 2018 11

GENERAL NOTES

B2NONEK. EIKERMANN

S2

D. GERMANI

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g g n .d g

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g f o u n d a ti o n .d g n

RG3029- of FEBRUARY 2018 11 C1" = 10'-0"

FOUNDATION NOTES:

FOUNDATION PLAN

S3

P T

.3

P C

.6

2"1'-0"

102'-0"2'-0" 2'-0"

3,610

3,595

3,580

3,585

3,590

3,595

3,600

3,605

Sta. 12+93.71

End Bridge

Sta. 11+87.71

Begin Bridge

S ta

.7

C B r g

A b u t.

L S ta

.7

C B r g

A b u t.

L ty p ty p s p a s p a

L" steel piles8 3C exist. 8" x 8" x L

C Rdwy.L

H a t

C r e e k

N

Abut. 1 Abut. 2

Approx. existing ground @ C RdwyL

El. 3598.39 El. 3598.39

FOUNDATION PLAN

ELEVATION

2'-0"2'-0" (typ.)

ty p

El. 3600.00 El. 3600.00

Profile Grade @ C Rdwy.L

(typ. all four corners)

Existing wingwall piles to be removed.

Horiz. Curve Data:

PI 11+27.71

R = 325.00'

T = 59.94'

L = 118.54'

Horiz. Curve Data:

PI 13+43.21

R = 625.00'

T = 48.60'

L = 97.01'

Location

Abut. 1

Abut. 2

FOUNDATION TABLE

Resistance req'd. (Rndr)

Nominal Pile Driving Min. Pile Tip Elev.

Axial Load

Max Factored Pile

220 kips(strength I)

220 kips(strength I)

El. 3563.0

El. 3563.0

Grade = 0.000%

C new HP 14 x 89 steel piles

New HP 14 x 89 steel piles (typ.)

S. BELCHER

to be removed under Option X.

Existing bridge superstructure

420 kips

420 kips

D. GERMANI

in place (typ.)

steel piles to stay

" 8 3Exist. 8" x 8" x

See Notes.

Test Pile.

See Notes.

Test Pile.

criteria for production piles.

with signal matching and provide driving

Verify the dynamic load test assumptions accordance with section 551.13(a) of FP-14.

Conduct dynamic load tests on 2 piles in

AASHTO/AWS Bridge Welding Code, D1.5.

Grade 65-35. Weld to steel pile according to cast steel shoes conforming to ASTM A27, Pile tips shall be fitted with prefabricated, Grade 50.

New steel H-piles shall conform to ASTM A572, STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g b o r in g s .d g n

RG3029- of FEBRUARY 2018 11

P T

.3

P C

.6

L

N

C Rdwy.

Bridge Length = 106'-0"

H a t

C r e e k

LEGEND

Boring No.

Elev.

RQD

x x x

Core Run

Depth Terminated

Location

Plan View

Graphic material description

Practical refusal SPT

% Core Recovery Shaded

Ground Water Depth at time of drilling (ATD)

Unified Soil Classification

Location of any sampled hole

AASHTO T206

(SPT) in accordance with standard penetration test

Blow count per foot with

TYPICAL TEST HOLE SYMBOL

TYPICAL TEST HOLE LOG

PLAN

ELEVATION

D

SUMMARY OF BORING LOGS

4NONE

S ta

.7

B e g in B r id

S ta

.7

E n d B r id

3,610

3,605

3,600

3,595

3,590

3,585

3,580

3,575

3,570

3,565

3,560

3,555

3,550

3,545

BH-01

STA 11+45, 5 ft RT

60.17

BH-02

STA 13+10, 5 ft RT

50.25

BH-01

BH-02

Silt Shale

Lean Clay

Silty Sand

Weathered Shale

Silty Clay

Fat Clay

El. 3606

50/5"

50/4"

50/2"

50/4"

50/2"

50/3"

50/2"

50/5"

El. 3605

S4

Division, Geotechnical Services Branch.

Federal Highway Administration, Central Federal Lands Highway

October 2017, prepared by U.S. Dept. of Transportation, Hat Creek Bridge, Report No. NE-FLAP-7136(1)-001-16, dated

For additional information, refer to Final Geotechnical Report:

C Pile wingwall (typ.)

Timber lagging

9"4'-4"4'-4"4'-4"4'-4"9"

18'-10"

Approx. exist. ground.

Steel pile spa.

A

A

Begin or End Bridge

Top of Rdwy.

3"8"

Scale: 1" = 1'-0"

UNLESS NOTED

" = 1'-0"2

SECTION A-A

S6

6 FK. EIKERMANN

Top of Rdwy.

3"8"

L

Top of pile

Begin or End Bridge

Scale: 1" = 1'-0"

SECTION B-B

B

B

L

9"

1'-6" 1'-6" wall (remove).

3" x 12" timber lagging

8"8"

6"

Top of pile

EXISTING ABUTMENT 1 ELEVATION

ABUTMENT 1 DETAILS

EXISTING

El. 3604.16 (Abut. 1)

El. 3599.39 lagging wall

3" x 12" timber

" steel abut. pile 8 38" x 8" x

8" x 4" x 14" steel wingwall pile.

(remove to 1' below new abut. cap) wingwall bracing (typ.)

6" x 2" Steel channel

El. 3604.14 (Abut. 1)

" bearing plate 2 abut. support.

12" x 3" steel channel

Note: Truss superstructure not shown.

" bearing plate.2 running plank

" timber 2 13" x 11 abut. support steel channel

12" x 3"

3" x 12" timber lagging wall.

foundation.

for re-use in new specified elevation abut. pile. Cutoff at

" steel 8 38" x 8" x

8" x 4" stringer

Int. steel timber deck

" 4 3" x 54

E x is ti n g S u p e r s tr u c tu r e

P a y l im it s f o r r e m o v a l o f

B r id g e

S u b s tr u c tu r e

" timber deck 4 3" x 54

" channel4 18" x 2

Ext. steel stringer brg. plate

@ C pile, top of

El. taken here

" steel bearing plate2 abut. support steel channel

12" x 3" foundation.

for re-use in new specified elevation abut. pile. Cutoff at

" steel 8 38" x 8" x

P a y l im it s f o r R e m o v a l o f

B r id g e

S u b s tr u c tu r e

C. ROBINSON

support for re-use in embankment stabilization. See RG3029-E.

Salvage 6" x 2" steel channel bracing or 12" x 3" steel channel abut.

NOTE:

Cutoff steel abut. piles at this elevation for re-use in new foundation.

El. 3598.39

Remove to channel bracing

6" x 2" Steel to b e r e m o v e d u n d e r O p ti o

X

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g e x is ti n g a b u tm e n t.

d g wingwall (typ.)

Timber lagging

9"4'-4"4'-4"4'-4"4'-4"9"

18'-10"

Steel pile spa.

AB

6"

AB

1'-6" 1'-6"

UNLESS NOTED

" = 1'-0"2

K. EIKERMANN

6"

S7

G 7

EXISTING ABUTMENT 2 ELEVATION

ABUTMENT 2 DETAILS

EXISTING

El. 3599.39

El. 3604.09 (Abut. 2)

" bearing plate2 lagging wall

3" x 12" timber " steel abut. pile.8 38" x 8" x

8" x 4" x 14" steel wingwall pile.

(remove to 1' below new abut. cap) ground.

exist.

Approx.

" bearing plate2 abut. support.

12" x 3" steel channel

Note: Truss superstructure not shown.

El. 3604.13 (Abut. 2) wingwall bracing (typ.)

6" x 2" Steel channel

P a y l im it s f o r R e m o v a l o f

B r id g e

S u b s tr u c tu r e

Note: See RG3029-F for Section A-A & B-B.

C. ROBINSON

support for re-use in embankment stabilization. See RG3029-E.

Salvage 6" x 2" steel channel bracing or 12" x 3" steel channel abut.

NOTE:

El. 3598.39

Remove to channel bracing.

6" x 2" Steel

Cutoff steel abut. piles at this elevation for re-use in new foundation.

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g e x is ti n g a b u tm e n t.

d g

45° (typ.)

(t y p

'-0

" w in g w a ll (ty p

Fill Face

C Brg. & C Abut.L L

1'-11"4 spa. @ 4'-4" = 17'-4"1'-11"

4'-1"3 spa. @ 4'-4" = 13'-0"4'-1"

Existing piles

Top of Rdwy.

ABUTMENT PLAN

ABUTMENT ELEVATION

A

A

ABUTMENT

" = 1'-0"4

7" (typ.)

C Rdwy.L

New piles

10"

2'-0"2'-0"

" w/ drain grate

C 3" Ø weephole L

SECTION A-A

Scale 38" = 1'-0"

Begin or End Bridge

K. EIKERMANN

10'-7"10'-7" p il e e m b e d

C Brg.L

S8

H8

1'-0"2"

L

C Exist. 8" x 8" x 38" steel pile L prior to ordering materials and constructing abutments.

* Final dimensions & elevations to be coordinated with bridge manufacturer

10'-0"10'-0"

(Abut. 1 Shown, Abut. 2 Similar)

(Abut. 1 Shown, Abut. 2 Similar)

Top of Rdwy.

El. 3598.39 *

C New HP 14 x 89 steel pile

End Bridge Sta. 12+93.71

Begin Bridge Sta. 11+87.71

El. 3604.40 (typ.)

L

C Exist. 8" x 8" x 38" steel pile L

C New HP 14 x 89 steel pile

PILE DETAIL

Scale 38" = 1'-0"

El. 3605.40 (typ.)

Bottom of abutment cap

@ ends) #5AE1 (typ.

7"= 1'-2", 2 spa. @

3"6"

#5AE1 (typ.)

#4EE1 (typ.)

#4EE2 b.f.

"2 15'-610'-1""2

15'-6weephole spa.

#7AE2 (6 tot.)

#7AE3 (6 tot.)

b.f. = Both faces o.f. = Other face f.f. = Fill face

ABBREVIATIONS:

#4EE2 (8 tot.)

c lr

#5AE1

6-#7AE2

6-#7AE3

3"26 spa. @ 9"= 19'-6", #4EE13"

#4EE3 (typ. @ ends)

3"

(typ.)

#4EE3

or

#4EE1

"2 piles) #5AE1 (typ.betw.

2 spa. @ 6"= 1'-0", "2 sheet drain.

Geocomposite

Geocomposite sheet drain with

Class 2, Type C geotextile.

Attach to wall per manufacturer's instructions.

for #7AE3 placement

2%

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g a b u tm e n t.

d g

"8 18'-2

El. 3604.40

El. 3598.39 *

Other face

Fill face

1'-0"

A

A

SECTION A-A

ABBREVIATIONS:

b.f. = both faces o.f. = other face f.f. = fill face

Fill face

Other face

8'-0" wingwall

WINGWALL PLAN

(typ. @ all four wingwalls)

WINGWALL ELEVATION

(typ. @ all four wingwalls)

El. 3605.40 prior to ordering materials and constructing abutments.

* Final dimensions & elevations to be coordinated with bridge manufacturer

WINGWALL

S9

" = 1'-0"

3 I K. EIKERMANN

#4WE3

#5WE2

#5WE4 b.f.

#4WE1a b.f. #4WE1g b.f.

W

E f .f s p a s p a

W

E o .f

#4WE bars

#5WE4

#4WE3 (typ.) #5WE2 (typ.)

6 spa. @ 1'-3"= 7'-6", #4WE1(a-g) b.f.3"

3" Ø weephole

Geocomposite sheet drain with

Class 2, Type C geotextile.

Attach to wall per manufacturer's instructions.

3" Ø weephole w/ drain grate

5'-0"

#4WE3 o.f. (typ.)

#5WE2 f.f. &

Geocomposite sheet drain.

2%

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g w in g .d g

L

0%

TYPICAL SECTION

10'-0"10'-0""4 13 "4 decking (galvanized)

Structural steel

Side dam (typ.)

Steel railing post (typ.)

Steel Diaphragm

Structural

"2 11'-05 spa. @ 3'-7" = 17'-11""2

11'-0

TYPICAL SECTION

" = 1'-0"8

3K. EIKERMANN

Rolled steel girder (typ.). splice at diaph (typ.).

Optional field bolted

2'-0"2'-0"

A b u t.

c a p

C brg.L

9 gage galv.

steel decking

End guard angle

TYPICAL SECTION @ ABUTMENT

C Bridge

C Rdwy. &

L m a x

Gdr./Prefab Bridge Length = 104'-0"

2" gap 10" endwall

10 J pads per bridge manufacturer.

and elastomeric bearing

Anchor bolts, bearing plates, 1'-6"4'-0"1'-6" excavation structure

Pay limits of **Aggregate base m in e m b e d s u p e r s tr u c tu r e d e p th

STRUCTURE EXCAVATION LIMITS

Approx. existing ground

1'-6"4'-0"1'-6"

Finished ground

Profile grade3 R o a d w a y S e c ti o n

STRUCTURE BACKFILL LIMITS

backfill structural

Pay limits of

Existing bridge to be removed

S10 depth above steel decking crest.

" 2 1Fill corrugations to provide 2

**Aggregate base (compacted).

D. GERMANI

prior to ordering materials and constructing abutments.

* Final dimensions & elevations to be coordinated with bridge manufacturer

TL-2 rating min.

(10 ga.) (typ.)

Galvanized Thrie-Beam Bridge Railing

Begin/End Bridge

** This work to be completed under Option Y.

Flared Thrie Beam End Section Bridge Railing

Thrie Beam

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g ty p ic a l.

d g

K. EIKERMANN NONE

REINFORCING STEEL SCHEDULE DIMENSION TABLE

BAR MK SIZE TYPE PIN SZ LOCATION QTY LENGTH WEIGHT A B C D E F G H J K O R

ABUTMENTS

V or N

60T2 2•" 6" 3'-8" 2'-7" 3'-8" 2'-7" 6"13'-6"#5AE1 8455 Stirrups

122 5…" 1'-2" 20'-10" 1'-2"23'-2"#7AE2 5687 Horiz. top

12STR 20'-10"20'-10"#7AE3 5117 Horiz. bot.

1924 LBSSUBTOTAL

ENDWALLS

V or N

5417 3„" 4'-6" 6" 4'-6"9'-6"#4EE1 3434 Stirrups

16STR 20'-10"20'-10"#4EE2 2234 Horiz. b.f.

417 3„" 5'-1" 6" 5'-1"10'-8"#4EE3 294 Stirrups

594 LBSSUBTOTAL

WINGWALLS

V or N sets of

STR 5'-8•"

to

6'-7•" at 1ƒ"

Incr.

5'-8•" to

6'-7•" at 1ƒ"

Incr.

#4WE1 2314 Vert. b.f.

4052 3ƒ" 7'-11" 1'-6" 1'-ƒ" 1'-1‚"9'-5"#5WE2 3935 Horiz. f.f.

2452 3„" 7'-11‚" 1'-6" 1'-ƒ" 1'-1"9'-5•"#4WE3 1524 Horiz. o.f.

873 3ƒ" 7'-8•" 10" 1‚" 10‚"8'-6•"#5WE4 715 Horiz. top

847 LBSSUBTOTAL

B

STR

TYPE 2

A G

B

B

C

D

OPTIONAL LEG

TYPE 17

A

G B

EC

D

TYPE T2

D

C

B

A

TYPE 52

TYPE 73

C

B

D

A

NOTES

All "E" bars are epoxy coated.

Dimensions in bending diagrams are out-to-out of bars

2.

1.

b.f. = Both faces o.f. = Other face f.f. = Fill face

ABBREVIATIONS:

REBAR LIST

11 K

S11

STATE

NE

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

N

N E

(1

B r id g e R

G C

A e s D

G N

F il e s r g r e b a r .d g

For all retroflectorized signs where W > 25' V may be reduced by 1 foot in rural districts for

6 ft

2 ft

5 ft

7 ft

NO SCALE

NOTE:

E d g e o f tr a v e le d w a y

Elevation at edge of traveled way

LC

E d g e o f s h o u ld e r

Rural Districts

Location

1.

2.

3.

a secondary sign mounted below another sign.

Business or

Residence Districts

SINGLE POST SIGNS

MINIMUM DISTANCE TO SIGN

SIGN INSTALLATION ANGLE

TYPICAL MOUNTING FOR

Direction of traffic flow from curb

Lateral

Offset (W)

Mounting

Height (V)

H

Z is the height from ground line to mid-height of sign at the longest post.

For the purpose of post selection X and Y are as follows:

- Single sign, or back to back signs: X and Y are the overall dimensions of the signs.

- Multiple sign installations: X and Y are the dimensions of a rectangle enclosing all the signs.

4.

633-A

See table for hole size post, parallel to sign face.

Field drill holes through

Bottom of sign

Backfill material post

Finish ground line

" lock nut16

" outside dia.) 4 1(1 oversized washer

" nonmetallic16

" oversized washer16

" bolt16

" bolt thru the post8

X=5 ft maximum

3" minimum all around (typ.)

Long side of post

W

Y V

Z

.5

Y

T1

Black stripes

Yellow stripes retroreflective

12"

OM3-ROM3-L

OBJECT MARKER

TYPE 3

0.093" Min

Optional

AA

See Detail A

METAL POST DETAIL

Metal post to be as shown except that minor variations in design and dimensions will be permitted to meet manufacturer's standards.

SECTION A-A

DETAIL A

32" holes

16" 2 716"

1 116"

16"

16"

16"3 116"

16"

16"

16"

WOOD POST DETAIL

m in a b o v e g r a d e

Bridge floor

MARKER INSTALLATION

SIGN AND OBJECT

OBJECT MARKER DETAIL

SIGNS

indicates overall post length. Select post lengths to fit field conditions.

Furnish posts conforming to Section 718.04.

H m in

STATE PROJECT

A

M N N

E R o a d w a y C

A D

D S h e e ts T S

P A .d

U.S. DEPARTMENT OF TRANSPORTATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

SPECIAL

U.S. CUSTOMARY SPECIAL

U s e r t h o m a s .m c c r a r y

_ NUMBER

SHEET

NE

.7

.0

.0

.7

.0

X1 Montrose Bridge Repair

NE FLAP 7136(1)

NE

PROJECTSTATE

N

N E

\7

(1

R o a d w a y

\C A

D D

S h e e ts

\X -M

L

X s e c \X

S S

(7 d g n

:2

:5

A

M

/1

/2

U s e r th o m a s .m c c r a r y

_ NUMBER

SHEET

Sl op e_ St ak e_

Cu t_L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Sl op e_ St ak e_

Cu t_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

C L

S ta

.7

R

D e s

G r a d e

.0

S u b g r a d e

.8

O r ig

G r n d

.0

.4

.7

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Sl op e_ St ak e_

Cu t_L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Sl op e_ St ak e_

Cu t_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

C L

S ta

.0

R

D e s

G r a d e

.6

S u b g r a d e

.3

O r ig

G r n d

.6

.7

.2

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Sl op e_ St ak e_

Cu t_L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Sl op e_ St ak e_

Cu t_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

C L

S ta

.0

R

D e s

G r a d e

.7

S u b g r a d e

.4

O r ig

G r n d

.7

.0

.1

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Sl op e_ St ak e_

Cu t_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Sl op e_ St ak e_

Cu t_L

C L

S ta

.7

R

D e s

G r a d e

.2

S u b g r a d e

.9

O r ig

G r n d

.2

.7

.2

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Sl op e_ St ak e_

Cu t_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Slo pe

_S tak e_ Fil l_L

C L

S ta

.0

R

D e s

G r a d e

.7

S u b g r a d e

.5

O r ig

G r n d

.7

.4

.3

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

.0

.0

.0

.7

X2 Montrose Bridge Repair

NE FLAP 7136(1)

N E

\7

(1

R o a d w a y

\C A

D D

S h e e ts

\X -M

L

X s e c \X

S S

(7 d g n

:2

:5

A

M

/1

/2

U s e r th o m a s .m c c r a r y

_ NUMBER

SHEET

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Slo pe

_S tak e_ Fi ll_ L

Slo pe

_S tak e_ Fil l_R

C L

S ta

.0

R

D e s

G r a d e

.9

S u b g r a d e

.6

O r ig

G r n d

.9

.4

.2

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Slo pe

_S tak e_ Fi ll_ L

Slo pe

_S tak e_ Fil l_R

C L

S ta

.0

R

D e s

G r a d e

.2

S u b g r a d e

.9

O r ig

G r n d

.2

.5

.6

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Sl op e_ St ak e_

Fi ll_

L

Slo pe

_S tak e_ Fil l_R

C L

S ta

.0

R

D e s

G r a d e

.3

S u b g r a d e

.1

O r ig

G r n d

.3

.3

.2

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Sl op e_ St ak e_

Fi ll_

L

Slo pe

_S tak e_ Fil l_R

C L

S ta

.7

R

D e s

G r a d e

.5

S u b g r a d e

.2

O r ig

G r n d

.5

.3

.2

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

.0

.0

.7

X3 Montrose Bridge Repair

NE FLAP 7136(1)

N E

\7

(1

R o a d w a y

\C A

D D

S h e e ts

\X -M

L

X s e c \X

S S

(7 d g n

:2

:5

A

M

/1

/2

U s e r th o m a s .m c c r a r y

_ NUMBER

SHEET

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Slo pe

_S tak e_ Fi ll_ L

Slo pe

_S tak e_ Fil l_R

C L

S ta

.0

R

D e s

G r a d e

.2

S u b g r a d e

.0

O r ig

G r n d

.2

.5

.9

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R

Ex _P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Slo pe

_S tak e_ Fil l_L

Slo pe

_S tak e_ Fil l_R

C L

S ta

.0

R

D e s

G r a d e

.5

S u b g r a d e

.3

O r ig

G r n d

.5

.3

.6

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

To ps oil _L

Pv mt

_E

TW

_L ay erT op

_L

Pv mt

_E

OP

_L ay er1 _R

Ex _P vm t_L

Pv mt

_E

TW

_L ay er1 _L

To ps oil _R

Pv mt

_E

TW

_L ay erT op

_R Ex

_P vm t_R

Pv mt

_E

TW

_L ay er1 _R

Pv mt

_C L_

La ye rT op

Ex _P vm t_C

L

Pv mt

_C L_

La ye r1

Pv mt

_E

OP

_L ay er1 _L

Ex ter ior B ou nd ary

Ex ter ior B ou nd ary

Sl op e_ St ak e_

Cu t_L

Sl op e_ St ak e_

Cu t_R

C L

S ta

.7

R

D e s

G r a d e

.0

S u b g r a d e

.8

O r ig

G r n d

.0

.9

.4

<---- Edge of Exist Pavement

<---- Edge of Exist Pavement

A001.pdf
A002.pdf
A003.pdf
A004.pdf
A005.pdf
A006.pdf
B-sheets.pdf
B-sheets.pdf
A001.pdf
A002.pdf
A003.pdf
rg3029 100% 3-8-16 pdf.pdf
rg3029 pe
rg3029 gn
rg3029 foundation
rg3029 borings
rg3029 riprap
rg3029 existing abutment
rg3029 existing abutment
rg3029 abutment
rg3029 wing
rg3029 typical
rg3029 rebar
X-sheets.pdf
A001.pdf
A002.pdf
A003.pdf
A004.pdf
A005.pdf
A006.pdf