N62473-15-R-2218, convert mezzanine to administration building 2061 (C07-12), marine corps air ground combat center, twentynine palms, CA
Award Notice Posted
- Solicitation number
- N6247315R2218
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Awarded
- to DBR Investments Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- N6247315C2218 Federal contract award
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
1. Demolition: Saw cut and selective demolish as required to locate sewer line from first deck restroom floor. See Sheet A-101.
2. Demolition: Provide necessary coring for water, sewer and electric utilities. See Sheet A-102
3. Demolition: Saw cut roof as required for new mechanical equipment. See Sheet A-103.
4. Demolition: Remove existing lighting from new administration area. See Sheet A-105.
5. Demolition: Modify existing fire sprinkler system to “T†Bar drop ceiling. See Sheet MP-6.
6. Connect sewer from first deck restroom through mezzanine floor. See Sheet A-106.
7. Connect water supply. See Sheet MP-11.
8. Install a new partition wall for administrative area and ADA restroom. Install light gauge framing along existing concrete walls.
Insulate and cover with gypsum. Install double doors (see note #10 below) and closet space to enclose wall mounted electrical panels on South wall. Enclose existing ducting on North wall and overhead with new partition wall and soffit. See Sheet A-107.
9. Install (30) new 2’ x 4’ fluorescent ceiling light fixtures per AE Design Manual page 40 and UFC 3-530-01.
10. Provide restroom exhaust fans, heating/cooling, lighting, doors, sealed flooring, and bathroom fixtures. See Sheet A-401.
11. Install new roof top mechanical units. See Sheet A-108.
12. Administration space shall include dual electrical outlets and communication ports (spaced 10’-0†OC).
13. Install two new doors. Install a cylindrical privacy type lock base compatible in each door.
Reference attached A and E Guide for the locks.
14. Reattach existing fire extinguisher per applicable fire codes. See Sheet A-403.
15. Paint the all gypsum covered walls and ceilings. See Sheet A-601 for Room Finish Schedule.
16. Replace outlets, mechanical switches and cover plates. (NOT THE COM).