Notice text

1. Demolition: Saw cut and selective demolish as required to locate sewer line from first deck restroom floor. See Sheet A-101.

2. Demolition: Provide necessary coring for water, sewer and electric utilities. See Sheet A-102

3. Demolition: Saw cut roof as required for new mechanical equipment. See Sheet A-103.

4. Demolition: Remove existing lighting from new administration area. See Sheet A-105.

5. Demolition: Modify existing fire sprinkler system to “T†Bar drop ceiling. See Sheet MP-6.

6. Connect sewer from first deck restroom through mezzanine floor. See Sheet A-106.

7. Connect water supply. See Sheet MP-11.

8. Install a new partition wall for administrative area and ADA restroom. Install light gauge framing along existing concrete walls.

Insulate and cover with gypsum. Install double doors (see note #10 below) and closet space to enclose wall mounted electrical panels on South wall. Enclose existing ducting on North wall and overhead with new partition wall and soffit. See Sheet A-107.

9. Install (30) new 2’ x 4’ fluorescent ceiling light fixtures per AE Design Manual page 40 and UFC 3-530-01.

10. Provide restroom exhaust fans, heating/cooling, lighting, doors, sealed flooring, and bathroom fixtures. See Sheet A-401.

11. Install new roof top mechanical units. See Sheet A-108.

12. Administration space shall include dual electrical outlets and communication ports (spaced 10’-0†OC).

13. Install two new doors. Install a cylindrical privacy type lock base compatible in each door.

Reference attached A and E Guide for the locks.

14. Reattach existing fire extinguisher per applicable fire codes. See Sheet A-403.

15. Paint the all gypsum covered walls and ceilings. See Sheet A-601 for Room Finish Schedule.

16. Replace outlets, mechanical switches and cover plates. (NOT THE COM).