Mud Mountain Dam Lower Cascade Creek Water Control Facility

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912DW24B0008
Agency
ENDIST Seattle US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237 Heavy and Civil Engineering Construction
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Enumclaw, Washington 98022, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

Paragraph 1:

The U.S. Army Corps of Engineers Seattle District is seeking interested contractors for the Mud Mountain Dam Lower Cascade Creek Water Control Facility construction project. The purpose of this project is to replace an outdated and inefficient water control structure incapable of containing high water volumes from Lower Cascade Creek. The proposed contract will be a firm-fixed price construction contract, and the Government anticipates using a Low Price, Technically Acceptable (LPTA) evaluation approach. Interested firms are requested to submit a capabilities package by May 22, 2024, providing details on their qualifications, past experience, and interest in bidding on the solicitation.

Paragraph 2:

This opportunity is not set aside for any specific business classification. The relevant NAICS code is 237990 - Other Heavy and Civil Engineering Construction, and the PSC code is Y1PZ - Construction of Other Non-Building Facilities. The magnitude of construction is estimated to be between $10,000,000 and $25,000,000. The Government is seeking qualified Small Business, 8(a), Woman Owned Small Business, Service-Disabled Veteran Owned Small Business, and HUBZone contractor sources to potentially set aside the solicitation, or issue it as unrestricted if suitable small business responses are not received.

Notice text

This SOURCES SOUGHT ANNOUNCEMENT for IFB W912DW24B0008 is for informational and market research purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. The proposed action will be a construction project with a firm-fixed price contract. The type of solicitation to be issued will depend upon information received in response to this sources sought announcement. No reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information.  We anticipate this to be evaluated as Low Price, Technically Acceptable (LPTA).

Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. NO SOLICITATION IS CURRENTLY AVAILABLE. This is not a request to be placed on a solicitation mailing list and is not to be construed as a commitment by the Government. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. The purpose of this sources sought announcement is to gain knowledge of potentially qualified Small Business, 8(a), Woman Owned Small Business, Service-Disabled Veteran Owned Small Business, and HUBZone contractor sources; as well as their size classifications relative to the NAICS code 237990 – Other Heavy and Civil Engineering Construction, PSC code Y1PZ-Construction of Other Non-Building Facilities, and Small Business Size Standard $45 Million. Depending upon the responses associated with the business categories listed above, the solicitation will either be set aside in one of those categories or be issued as unrestricted and open to both small and large businesses. After review of the responses to this announcement and if the Government still plans to proceed with this project; a separate solicitation announcement will be published on SAM.gov (www.SAM.gov). Responses to this announcement are not an adequate response to any future solicitation announcement.

BACKGROUND:

Mud Mountain Dam is a zoned earth and rockfill structure with an 810-foot-long crest and a maximum height of 432 feet above bedrock. The structural height of 427 feet is measured from the bottom of a structural depression located approximately 170 feet upstream of the cutoff wall to the new top of dam at 1,257 feet NGVD29. The dam is 1,600 feet wide at the base, 25.5 feet wide at the crest, with a design crest elevation of 1,257 feet NGVD29. A concrete seepage cutoff wall extends from the crest into bedrock in the core of the dam. Mud Mountain Dam is constructed in a narrow canyon where rock walls on both sides of the gorge rise almost vertically to a height of nearly 275 feet above the White River channel. The upstream hillside slope at the left abutment is steep (approximately1:1). Lower Cascade Creek (LCC) drains into an existing Water Control System (WCS) consisting of debris screens, a concrete lined catch basin and pipes which convey flow along the upstream left groin to the pool. The upstream groin is armored with shotcrete to approximate EL 1167.8 feet (NAVD88). The catch basin and embankment abutment tie-in are separated by roughly 51 feet of sandy-gravel fill between EL 1,267.8 feet (NAVD88) (basin) and 1,264.3 feet (NAVD88) (crest). The current WCS was not designed to a handle a specific flow or event with a defined return interval, because there is very little available hydrologic data on flow-frequency for LCC. Rather, the existing inlet basin was constructed to address recurring erosion caused by flows from past events along the upstream groin. This lack of a specific design event or flow has led to failure to control flows at the inlet even without debris accumulation. The LCC watershed is approximately 0.4 square miles or 0.1 percent of the Mud Mountain Dam watershed. Additionally, the watershed for LCC is immediately adjacent to the dam making it very likely that a large precipitation event would load both watersheds as it moves across the region. Due to the size and nature of the watershed, peak flows on LCC occur sooner and have a shorter duration than those observed on the White River. Consequently, high flows occur on LCC before much of the precipitation in the White River basin concentrates and begins to raise the reservoir.

CONSTRUCTION REQUIRED:

The purpose of this project is to replace an outdated and inefficient water control structure incapable of containing high water volumes from LCC. In 2009, a flood event overtopped the water control structure, and uncontrolled creek flows eroded both the upstream and downstream left groin of the dam causing extended disruption to project operations.

MAGNITUDE OF CONSTRUCATION:

In accordance with DFARS 236.204(ii) “Disclosure of the Magnitude of Construction Projects,”

Magnitude of Construction is estimated to be between $10,000,000 and $25,000,000.

REQUIREMENTS:
Interested firms should submit a capabilities package, to include the following:
1. Firm's name, address, point of contact, phone number, and email address.
2. CAGE code and Unique Entity ID (UEI) number[HNELC(3] [PJK(CUC(4] .
3. Firm's interest in bidding on the solicitation if issued.
4. Business classification: Small Business (SB), Small Disadvantaged Business (SDB), Woman Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone Small Business (HUBZone), 8(a) Program, Other Than Small Business (Large Business).
5. Firm's joint venture information (if applicable).

All interested parties who believe they can meet the requirements are invited to submit, in writing, complete information describing their interest and ability to meet all requirements stated above. Prior Government contract work is not required for submitting a response to this announcement.

Submit responses via email to: Jeannette K. Patton, Contract Specialist, jeannette.k.patton@usace.army.mil AND Enshane Hill-Nomoto, enshane.nomoto@usace.army.mil.. Responses should be sent as soon as possible, but no later than 10:00 AM PST, 22 May 2024.  Subject Line:  MMD Lower Cascade Creek Water Control Facility Vendor Source

All interested firms must be registered in the System for Award Management (www.SAM.gov) by time of award and remain active for the duration of the contract to be eligible for Government contracts.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Mud Mountain Dam Lower Cascade Creek Water Control Facility Award Award Notice
Mud Mountain Dam Lower Cascade Creek Water Control Facility Latest solicitation Solicitation
Site Visit -Mud Mountain Dam Lower Cascade Creek Water Control Facility Special Notice
Mud Mountain Dam Lower Cascade Creek Water Control Facility Pre-Solicitation
Mud Mountain Dam Lower Cascade Creek Water Control Facility This notice · Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity