Mt. St. Helens Sediment Retention Structure Crest Raise
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W9127N25BA007
- Agency
-
ENDIST Portland
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Toutle, Washington 98649, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Portland District is seeking contractors for the Mt. St. Helens Sediment Retention Structure Crest Raise project on the North Fork Toutle River in Cowlitz County, Washington. The work involves constructing an increased level of sediment retention structure to provide additional storage capacity while allowing existing river flows, including mobilization/demobilization, river diversion, rock excavation, foundation preparation with dental concrete placement, roller-compacted concrete placement, outlet works sealing, and related incidental work. This will be a competitive firm-fixed price contract awarded through an Invitation for Bid process using FAR Part 14 procedures. The apparent low bidder must submit a Project Labor Agreement within seven days after bid opening, as required for large-scale construction projects under FAR 22.503. The government anticipates releasing the solicitation in July 2025, with the closing date for proposals approximately 60 days later, and the pre-solicitation notice response deadline is July 14, 2025.
This procurement is conducted under full and open competition with no set-aside designations, falling under NAICS code 237990 "Other Heavy and Civil Engineering Construction" with a size standard of $45 million. No current contractors or incumbents are identified in the notice. The estimated project cost ranges from $25 million to $100 million, representing a significant infrastructure investment. The contract period of performance extends from Notice to Proceed through May 7, 2028, providing nearly three years for completion. Contractors must be registered in the System for Award Management (SAM) prior to bid submission and award, and all work will be conducted at the existing sediment retention structure accessible via gravel access roads and paved roadways at the dam site.
Notice text
SYNOPSIS
The U.S. Army Corps of Engineers (USACE) Portland District is soliciting a Contract for the Mt. St. Helens Sediment Retention Structure Crest Raise on the North Fork Toutle River in Cowlitz County, Washington. The proposed project will be a competitive, firm-fixed price (FFP) contract.
Description of Requirement: The U.S. Army Corps of Engineers, Portland District, has a requirement to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package.
Purpose: The project purpose is to construct an increased level of sediment retention structure providing additional storage and allowing existing river flows. The work includes mobilization/demobilization, river diversion, rock excavation, rock foundation preparation including placement of dental concrete, placement of roller-compacted concrete, outlet works sealing, and incidental related work. This effort is to include all associated works required and described within this Contract package.
The work will be located at the Sediment Retention Structure on the North Fork Toutle River in Cowlitz County, Washington, off of Highway 504. Contractor access to the work site will be from gravel access roads on the dam site, the gravel roadway on top of the embankment dam, the top of the concrete outlet works structure, and a paved roadway on the spillway approach pier west of the existing spillway crest.
Contract Period of Performance: The estimated Period of Performance for this contract is Notice to Proceed through 07-MAY-2028
Magnitude of Construction: The estimated cost of the project is $25,000,000 to $100,000,000.
Set Asides and Codes: Full and Open Competition - Unrestricted. The North American Industrial Classification Code (NAICS) for this potential requirement would be 237990, “Other Heavy and Civil Engineering Construction”. The related size standard is $45M. The Product Service Code (PSC) is Y1QA - Construction of Restoration of Real Property (public Or Private).
Selection Process: Competitive acquisition using Invitation for Bid (IFB) using FAR Part 14 procedures.
Project Labor Agreement: Within seven (7) days after bid opening, the apparent low bidder must submit a Project Labor Agreement (PLA) as required for large-scale construction projects in accordance with FAR 22.503 and FAR Clause 52.222-33 Alternate I. The Government is not a party to the PLA. Per 52.222-33 Alt I subparagraph (b)(2), subcontractors are a party to the PLA. However, it is not necessary for all subcontractors sign the PLA, but they must agree to the terms of the PLA negotiated by the prime contractor and labor organization. The prime contractor can meet the requirements of subparagraph (b)(2) by either: 1) inserting language into the subcontract requiring the subcontractor to acknowledge and abide by the terms of the PLA; 2) having each subcontractor sign a Letter of Assent or an Affidavit of PLA Participation.
At a minimum, the proposed PLA must address the requirements in FAR 22.504(b), which states a project labor agreement shall –
(1) Bind all contractors and subcontractors engaged in construction on the construction project to comply with the project labor agreement;
(2) Allow all contractors and subcontractors to compete for contracts and subcontracts without regard to whether they are otherwise parties to collective bargaining agreements;
(3) Contain guarantees against strikes, lockouts, and similar job disruptions;
(4) Set forth effective, prompt, and mutually binding procedures for resolving labor disputes arising during the term of the project labor agreement;
(5) Provide other mechanisms for labor-management cooperation on matters of mutual interest and concern, including productivity, quality of work, safety, and health; and
(6) Include any additional requirements as the agency deems necessary to satisfy its needs.
If the apparent low bidder does not submit an acceptable PLA, they may be ineligible for award and the contracting officer may move on the second low bidder. Any PLA reached does not change the terms of this contract, or provide for any price adjustment by the Government.
Anticipated Solicitation Release Date: The government anticipates releasing the solicitation in July 2025. The closing date for proposals will be approximately 60 days later. Actual dates and times will be identified in the solicitation. Responses to this synopsis are not required. Additional details may be found in the solicitation when it is posted.
System for Award Management (SAM): Offerors must register in the SAM at https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.
Point of Contact: The USACE-NWP points of contact for this action are Andrew Sprys at andrew.j.sprys@usace.army.mil and Cory Pfenning at cory.r.pfenning@usace.army.mil. Email is the only method for receiving responses to this pre-solicitation notice.
Point of Contact for small business questions or assistance is the Portland District Deputy for Small Business, Maura Timmerman at (402) 370-0095 or maura.j.timmermann@usace.army.mil.
THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM ON OR ABOUT 14 JULY 2025. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.
THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mount saint helens sediment retention structure crest raise | Solicitation | |
| This notice | Pre-Solicitation | |
| Mt. St. Helens Sediment Retention Structure 2nd Crest Raise | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| FY26 Willapa Harbor Maintenance Dredging | ENDIST Seattle | No set-aside | |
| Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement | ENDIST Portland | Total Small Business | |
| John day DAM unit 10 packing box replacement | ENDIST Portland | No set-aside | |
| Camp wooten/starbuck levee rehab | ENDIST Walla Walla | No set-aside | |
| Mississippi River, Baton Rouge to the Gulf, Saltwater Barrier Sill, Cutterhead Dredge Contract No. 1-2025. Specification No. OM25135 | ENDIST New Orleans | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity