Monitoring of Dissolved Gas Bureau of Reclamation
Award Notice Posted
- Solicitation number
- 140R1018Q0024
- Agency
-
Bureau of Reclamation
Department of the Interior
- Awarded
- to John W Lemons
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 140R1018P0033 Federal contract award
- NAICS code
- 811219 Other Electronic and Precision Equipment Repair and Maintenance
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
2 versions
Update #2 · Latest ·
The purpose of this amendment is to update information that was not included in the original pre-solicitation notice posted on February 10, 2018.
Contract No. 140R1018P0033
Award Total amount: $385,650.00 (Base Year $70,500.00)
Place of Performance: Fruitland, WA
Duration of Contract Period: 04/01/2018 thru 03/31/2023
12-month Base Award with four (4) - 12-month option periods
Base Year PoP 04/01/2018 - 03/31/2019, Option Year 1 PoP 04/01/2019 - 03/31/2020, Option Year 2 PoP 04/01/2020 - 03/31/2021, Option Year 3 PoP 04/01/2021 - 03/31/2022, Option Year 4 PoP 04/01/2022 - 03/31/2023 for long-term, continuous daily monitoring of total dissolved gas, temperature, and barometric pressure at each of Reclamation's three sites on the mid-Columbia River and seasonal monitoring at a fourth site at Hungry Horse Dam.
Award Date: 03/29/2018
These items will be purchased in accordance with FAR part 13.5, acquisition of certain commercial item procedures apply. This requirement is a small business set aside.
*******************************************************************
Reclamation has an established the need for long-term, continuous daily monitoring of total dissolved gas, temperature, barometric pressure at each of its three sites on the mid-Columbia River and seasonal monitoring at a fourth site (tailrace at Hungry Horse Dam), with potential for year-round monitoring when forced winter spill is required. The provisional monitoring mandate has existed since 1997 and has only been invoked recently (2001). The northern-most fixed monitoring station on the Columbia River is located on the east bank, four miles south of the US-Canadian Border and eight miles north of Northport WA, and is called the Reclamation Boundary site (as opposed to sites operated by the USGS and USACE on the Boundary Dam pool on the PendOreille). The Grand Coulee forebay site is located on the face of Grand Coulee Dam near the Third Powerhouse. The tailrace / downstream location from Grand Coulee Dam is called the Barry monitoring site, and is approximately six miles southeast of Grand Coulee Dam on the east bank of the Columbia River. Reclamation must meet quality assurance and quality control standards developed by the USACE and USGS, and interagency Water Quality Team (created under a previous FCRPS Biological Opinion andmediated by NMFS and EPA). This is a sources sought notice for continuous monitoring of dissolved gas for Reclamation locations. The solicitation will be posted in the next few weeks with an award made by April 2018. Detailed specifications will be issued with the solicitation. If you are interested in this requirement, email Rachel Dyer at rdyer@usbr.gov..
Update #1 ·
Reclamation has an established the need for long-term, continuous daily monitoring of total dissolved gas, temperature, barometric pressure at each of its three sites on the mid-Columbia River and seasonal monitoring at a fourth site (tailrace at Hungry Horse Dam), with potential for year-round monitoring when forced winter spill is required. The provisional monitoring mandate has existed since 1997 and has only been invoked recently (2001). The northern-most fixed monitoring station on the Columbia River is located on the east bank, four miles south of the US-Canadian Border and eight miles north of Northport WA, and is called the Reclamation Boundary site (as opposed to sites operated by the USGS and USACE on the Boundary Dam pool on the PendOreille). The Grand Coulee forebay site is located on the face of Grand Coulee Dam near the Third Powerhouse. The tailrace / downstream location from Grand Coulee Dam is called the Barry monitoring site, and is approximately six miles southeast of Grand Coulee Dam on the east bank of the Columbia River. Reclamation must meet quality assurance and quality control standards developed by the USACE and USGS, and interagency Water Quality Team (created under a previous FCRPS Biological Opinion andmediated by NMFS and EPA).
This is a sources sought notice for continuous monitoring of dissolved gas for Reclamation locations. The solicitation will be posted in the next few weeks with an award made by April 2018. Detailed specifications will be issued with the solicitation. If you are interested in this requirement, email Rachel Dyer at rdyer@usbr.gov..
Notice history
| Notice | Type | Posted |
|---|---|---|
| TDG fixed monitoring stations CAL & main | Award Notice | |
| This notice | Award Notice |