Monitor well installation and sampling, marine corp recruit depot (MCRD), parris island, SC.
Award Notice Posted
- Solicitation number
- N6945010Q0013
- Agency
-
Naval Facilities Engineering Command
Department of the Navy, Department of Defense
- Awarded
- to Terraine, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- N69450-10-P-0013 Federal contract award
- NAICS code
- 562910 Remediation Services
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
OBJECTIVES
The Contractor shall furnish all labor, management, supervision, tools, materials, equipment, engineering, and transportation necessary to install, maintain, operate, repair, modify, and test well monitoring environmental systems and contaminated sites at Marine Corp Recruit Depot (MCRD) Parris Island, SC.
The work described below is at Parris Island Marine Corp Recruit Depot (MCRD) gas station that is currently being closed. The objective of this project is the following:
Install two (2) new monitor wells according to DHEC letter dated December 31, 2009.
Test newly installed wells and compliance wells CW-1, CW-2, CW-3, and CW-4 for the following: BTEX, Naphthalene, MTBE, Eight Oxygenates (TAME, TAA, TBA, ETBA, TBF, DIPE. ethanol, & ETBE by EPA Method), PAHs.
Receptor Survey within 1000-foot radius of site.
Assessment Report according to the DHEC Assessment Directive letter dated December 31, 2009.
All site rehabilitation activities must be performed and submitted by a South Carolina Certified Underground Storage Tank Site Rehabilitation Contractor.
All work shall be in accordance with the DHEC Assessment Directive letter dated December 31, 2009.
DHEC issued a Monitoring Well Approval for two well installations and two soil borings. Also, two wells that were damaged during the tank removal will have to be properly closed per DHEC standards. The contractor will be responsible for procuring any additional approvals from DHEC.
A report to DHEC shall be submitted for approval or work. Two hard copies and one CD disk of the report shall be sent to MCRD and NAVFAC contacts below. All correspondence concerning this site must reference UST Permit #01063, release #9.
The Contractor shall provide all equipment, labor, materials, and other incidentals necessary to accomplish the objectives.