Modernize fish houses #55 and #59-auburn, AL.

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
12405B21R0028
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Auburn, Alabama 36832, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation requests proposals for construction services to demolish and replace two fish houses with pre-engineered buildings at the USDA Agricultural Research Service Aquatic Animal Health Research Lab in Auburn, Alabama. The scope of work includes demolishing existing structures and foundations and constructing two pre-engineered fiberglass buildings along with associated electrical, water, and sewer connections. Proposals are due by August 18, 2021 and will be evaluated based on technical qualifications, past performance, and price. A non-mandatory site visit will be held on October 26, 2021.

This requirement has a total small business set-aside designation. The NAICS code is 236220 for Commercial and Institutional Building Construction with a size standard of $39.5 million. The estimated price range for the work is between $500,000 and $1,000,000 and must be completed within 240 calendar days of award. Davis-Bacon wage rates apply. The place of performance is the USDA facility located at 36832 Franklinton Road in Auburn, AL.

Notice text

This is a Request for Proposal (RFP) for construction services.  The USDA, Agricultural Research Service (ARS) Southeast Area (SEA) Aquatic Animal Health Research Unit in Auburn, AL., has a requirement to demolish and replace (2) fish houses with pre-engineered buildings.  The solicitation number is 12405B21R0028 and is issued as a request for proposal (RFP).  The NAICS code is 236220 with a size standard of $39.5M.  Contractors shall not directly contact the facility to discuss this requirement.  During the solicitation phase, contractors will be provided the opportunity for a site visit and to ask any relevant questions.

The work includes but is not limited to:   Provide all labor and materials required and demolish existing structures and foundations to provide (2) pre-engineered structures consisting of foundation and pre-engineered fiberglass buildings.  Provide electrical service and outlets as indicated. Provide water and sewer as indicated; at the Aquatic Animal Health Research Lab at Auburn, AL..  The work to be done consists of furnishing all necessary labor, materials, and equipment and performing all work in strict accordance with the Specifications and Drawings.

Contractors are required to be actively registered in the System for Award Management, (SAM)  prior to submitting a proposal.  You can register on- line at www.sam.gov.  If you are already registered and your registration has expired, you will need to go the SAM website and update your information.

Please refer to Section L.7 (b) of the attached Clauses and Provisions for site visit information.

Files

Show all 12

Notice history

Notice Type Posted
Modernize fish houses #55 and #59-auburn, AL. Award Award Notice
This notice Latest solicitation Solicitation
Modernize fish houses #55 and #59-auburn, AL. Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors