Modernization of the Gillespie Field (SEE) Air Traffic Control Tower (ATCT)
Closed Pre-Solicitation Posted
- Solicitation number
- 697DCK-27-R-SEE01
- Agency
-
Southwestern Region
Federal Aviation Administration, Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- California 92020, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The FAA Southwestern Region is conducting a market survey to identify sources capable of modernizing the Gillespie Field (SEE) Air Traffic Control Tower in El Cajon, California, with capability submittals due by 5:00 p.m. ET on October 14, 2026. The estimated project value ranges from $2,500,000 to $5,000,000; no set-aside applies. Work will be performed at the SEE facility in El Cajon, California, with construction restricted to 7:00 a.m. to 4:00 p.m. Monday through Friday, and special hours (10:30 p.m. to 5:00 a.m.) authorized for cab, electronics equipment room, and telco room work. Work blackout moratorium dates include September 10–12, Thanksgiving week, and December/January holiday periods.
The scope includes installation of new electrical panelboards, replacement of branch circuit wiring, correction of neutral and ground wiring, installation of additional outlets and GFI outlets, replacement of interior lighting, replacement of air handling units and cooling units, boiler replacement, installation of split-system units for administrative areas, and associated architectural and structural work. A non-availability waiver has been issued for mini-split units by Mitsubishi Electric/TRANE under the Buy American Act. Contractor personnel must obtain FAA identification media badges and comply with airport security protocols. The contractor is responsible for all utility service charges, permits, and fees.
Respondents must demonstrate relevant experience on tower or vertical construction projects valued at a minimum of $1,000,000 performed at critical facilities (FAA facilities, hospitals, data centers) within the past ten years. Capability submittals, limited to ten pages on company letterhead, must include company name, address, point of contact, business size status, UEI number, years in business, and current available bonding information. Written questions close at 5:00 p.m. ET on October 7, 2026. NAICS code 236220 applies.
Notice text
The FAA has a potential upcoming requirement for the modernization of the SEE ATCT, in El Cajon, CA. The FAA is seeking interested sources that are capable of completing this requirement. The disclosure of magnitude for this project is between $2,500,000 - $5,000,000, see attached Specifications and Drawings for full description of the work.
This market survey is being conducted in accordance with FAA Acquisition Management System (AMS) Policy section 3.2.1.2.1 Market Analysis. See attached market survey document to submit capability submittal/statement.
Please provide all capability submittals no later than 5:00pm ET, October 14, 2026.
Files
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale- Hollywood International Airport | Southwestern Region | No set-aside |