SEE ATCT TFIP Drawings - Full Size (03.28.2025).pdf
PDF 29 MB Posted
- Solicitation number
- 697DCK-27-R-SEE01
About this file
This file contains full-size technical drawings for the modernization project of the Gillespie Field (SEE) Air Traffic Control Tower in El Cajon, California. The drawings provide detailed architectural and engineering specifications necessary for contractors to understand the scope of work required for the ATCT modernization effort. These visual documents serve as critical reference materials for the pre-solicitation phase, enabling potential sources to assess their capability to execute the project and submit informed capability statements by the October 14, 2026 deadline.
The drawings support the FAA's market survey for this modernization initiative, which carries an estimated project value between $2,500,000 and $5,000,000. Contractors reviewing these documents can evaluate the technical complexity, construction sequencing, facility modifications, and infrastructure requirements associated with upgrading the air traffic control tower operations. The drawings work in conjunction with the specifications and market survey documentation to allow interested firms to determine their qualifications and submit comprehensive responses to the Department of Transportation Federal Aviation Administration Southwestern Region before the 5:00pm ET submission deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SEE ATCT TFIP Draft Specifications (03.28.2025).pdf | ||
| Market Survey_SEE ATCT Mod 10.02.2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .