Moakley Courthouse Elevator QEI

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
47PB0022Q0024
Agency
Region 1 Public Buildings Service, General Services Administration
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
541350 Building Inspection Services
PSC
H999 Other Qc/Test/Inspect- Miscellaneous
Place of performance
Boston, Massachusetts 02222, United States

Notice details come from SAM.gov. Updated .

Notice text

The General Services Administration (GSA) is issuing this solicitation (SEE ATTACHED DOCUMENTS) titled “RFQ 47PB0022Q0024 Moakley Elevator QEI”. Quotations are due on May 13th, 2022 3:00PM ET. The Solicitation is set-aside for small businesses. The NAICS code for this solicitation is 541350 - Building Inspection Services.

The U.S. General Services Administration (GSA), Public Buildings Service (PBS Office of Design and Construction (1PCM) is seeking to procure elevator construction inspection services from an Qualified Elevator Inspector (QEI), to perform all elevator construction inspection duties as noted in the Performance Work Statement for the upgraded public elevators located at the Moakley Federal Courthouse, Boston MA.  The construction inspection will include the following elevators and main components:

  • Elevators No. 13, 14, 15 and 16
  • 6 stops each
  • Work will only be allowed to be performed simultaneously for two (2) elevators at a time, and therefore inspections will only occur for two elevators at a time.

GSA’s objective is to hire a QEI to accomplish the following tasks:

  1. Perform on-site inspections of elevator construction items, in place or
    underway, to determine whether or not construction contractor and
    subcontractors are complying with contract documents. In general, observations
    shall include construction contractor’s and subcontractors’ adherence to
    specifications, drawings, amendments, contract modifications and codes, and
    determination as to whether the construction contractor and subcontractors are
    employing sound construction practices in the execution of the work.
  2. Participate to no more than four (4) 1-hr coordination meetings prior to the
    onsite modernization period. Refer to Item 3.
  3. Bi-weekly in-process inspections should be performed during the modernization
    period.
  4. One (1) half-day visit should be scheduled during the modernization period for
    each car, to occur approximately 2-3 weeks prior to the final acceptance
    inspection of that car. The CO and/or the COTR should be contacted at least
    one (1) week and no more than two (2) weeks prior to each inspection to
    ensure that adequate progress has occurred.
    If adequate progress is not anticipated, the inspection shall be rescheduled at no
    additional cost to the Government.
  5. Final acceptance inspections of each elevator as it is completed shall be included
    (hours not included in part “b” above).
  6. Complete GSA Form 220, “Inspection Report for Work Under Contract” at the
    conclusion of each inspection (alternate forms may be used with prior approval).
    The inspection report is to be complete, to the extent that all required information
    is to be included as may be applicable. The report is to be furnished in a typed
    format. Furnish a minimum of two (2) copies of each report (one if sent
    electronically) to the COTR not later than seven (7) days after performance of the
    inspection.
  7. Inform the CO and/or the COTR and the construction contractor of any work not
    in compliance with applicable contract documents; or of any failure to follow
    sound construction practices.
  8. Report all construction work and/or materials delivered, or in storage that are not
    in compliance with contract requirements to the CO and the COTR. The report
    shall outline the reasons for rejection.
  9. Perform follow up observations on each reported failure or non-compliance
    2 and advise the CO and the COTR of any instances wherein the construction
    contractor fails to remove, correct or replace rejected construction work or
    materials, etc., promptly. Maintain, on an ongoing basis, a record of observed
    items which remain at variance with contract requirements.
  10. Inform the CO, the COTR, and the construction contractor, in writing, of any
    means/methods whenever there is believed to be a violation of applicable
    provisions of relevant laws, ordinances or regulations.
  11. Appraise the construction contractor of any safety requirements stipulated in
    GSA Handbooks and/or criteria not being followed or implemented. Advise the
    CO and the COTR of any failure on the part of the construction contractor to
    comply with these requirements.
  12. Assist the CO and the COTR in the processing of changes in the work and/or
    construction related claims made against the Government by the construction
    contractor.

The Contracting Officer and main point of contact for this solicitation is Huy Le. E-mail: huy.le@gsa.gov. The Contract Specialist and secondary point of contact for this solicitation is Erica Payne. Email: erica.payne@gsa.gov.

If you have any questions please email the point of contacts listed above.

Attachments

Files attached to this notice, newest first
File Type Posted
Moaklely Public Elevators QEI SOW - 2022.04.13 (1).pdf PDF
RFQ 47PB0022Q0024 Attachment 1 - Offeror Representation and Certifications.docx DOCX document
RFQ 47PB0022Q0024 Moakley QEI Services 2022 04 27.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Moakley Courthouse Elevator QEI Latest solicitation Solicitation
Moakley Courthouse Elevator QEI This notice Pre-Solicitation
Moakley Courthouse Elevator QEI Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity