Midwest City Water Tower
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912BV26SS003
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Midwest City, Oklahoma, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers - Tulsa District is seeking to procure construction services for a new water tower in Midwest City, Oklahoma, as part of a project to develop a high-pressure zone and improve low pressures within the southeastern portion of the water distribution system. This sources sought announcement is a market survey for preliminary planning purposes only and is not a solicitation for proposals or a commitment to award a contract. The procurement will be conducted as a competitive, firm-fixed price contract under FAR 15 using the Lowest Price Technically Acceptable approach, with no tradeoffs permitted. Contractors will be evaluated based on technical acceptability and price, with the lowest price technically acceptable proposal receiving award consideration. Interested parties must respond to this sources sought announcement by February 17, 2026, though this is a pre-solicitation notice and no cost reimbursement will be provided for responses.
No set-aside designation has been predetermined for this contract; however, the government has indicated that the final set-aside decision will depend upon the capabilities demonstrated in responses to this sources sought announcement. While no incumbent contractor or current contractor information is identified in this pre-solicitation notice, the government encourages participation from small businesses, Section 8(a) firms, HUBZone-certified businesses, Service-Disabled Veteran-Owned Small Businesses, and Women-Owned Small Businesses to ensure adequate competition among the potential contractor pool. The announcement does not specify an award value or budget range for the project, nor does it provide detailed information regarding the project timeline or specific quantities of work to be performed. Respondents will be notified of evaluation results upon request, and more detailed requirements are expected to be published when the formal solicitation is issued.
Notice text
SOURCES SOUGHT SYNOPSIS
For
MIDWEST CITY WATER TOWER
Midwest City, Oklahoma County, Oklahoma
This is a SOURCES SOUGHT announcement; a market survey for information only, to be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED
FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. Respondents will be notified of the results of the evaluation upon request.
The U.S. Army Corps of Engineers – Tulsa has been tasked to solicit for and award a contract to construct a new water tower for Midwest City, Oklahoma. The proposed design-bid-build project will be procured as a competitive, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach, tradeoffs will not be permitted. The type of set-aside decision to be issued will depend upon the capabilities of the responses to this synopsis.
The purpose of this synopsis is to gain knowledge of interest, capabilities and qualifications of various members of industry, to include the Small Business Community: Small Business, Section 8(a), Historically Underutilized Business Zones (HUB-Zone), Service-Disabled Veteran-Owned Small Business (SDVOSB), and Women-Owned Small Business (WOSB). The Government must ensure there is adequate competition among the potential pool of responsible contractors. Small businesses, Section 8(a), HUBZone, SDVOSB, and WOSB businesses are highly encouraged to participate.
Project Scope:
Midwest City (MWC)is developing a high-pressure zone to improve the low pressures within the southeastern portion of the water distribution system (WDS) and proposed improvements that include the following, and incidental related work. The Contractor must determine the sequence for the base bid and approved options in the Work Plan. The work requirements are summarized as follows:
- Construction of a new 500,000-gallon elevated storage tank (EST), including associated piping, electrical, controls, and site improvements.
- Construction of a new high service pump station (HSPS), including associated piping, electrical, controls, and site improvements. Work includes shoring and dewatering practices as required, and as indicated in the Contract Documents.
- Construction of approximately 650 linear feet of new 12-inch ductile iron pipe from the new EST access road to the existing pipe connection on Timber Ridge Blvd. Work includes all pipe fittings, valves, restraints, traffic control, and site repairs.
- Work to complete the piping reconfiguration at the existing Titan Tower Tank site, including approximately 100 linear feet of 18-inch ductile iron pipe, 80 linear feet of 16-inch ductile iron pipe, pipe appurtenances, and pipe reconnections.
- Reconfiguration of distribution system piping at the corner of 15th Street and Westminster Road, including a new connection from the 24-inch water main on the west side of Westminster Road to the 12-inch water main on the north side of 15th Street.
- All erosion and sediment control devices, device maintenance, construction stormwater permitting, and stormwater management throughout construction.
- Close required isolation valves to isolate the Timber Ridge Zone while coordinating the valve work with the Owner.
Specialized Experience.
- Special Inspections will need to be performed as required.
- Electrical work to be performed in accordance with state requirements for qualified electricians.
- Tank manufacturer and installer must demonstrate a minimum of 10 years of experience in manufacturing and constructing elevated steel water storage tanks. Tank welding must be performed in accordance with AWWA D100 or AWWA D103 and AWS D1.1 and AWS D1.3.
- Tank foundation design shall be authorized by a licensed structural engineer in the State of Oklahoma.
- Tank cathodic protection system must be installed in accordance with AWWA D106-10 by qualified persons with experience in cathodic protection of water storage tanks.
- Tank coating must be installed by the tank manufacturer and all interior wetted components in contact with potable water shall be NSF 61 compliant.
- Tank mixer shall be NSF 61 compliant and provided and installed by a single manufacturer experienced in the municipal industry.
- A representative of the geotechnical engineer shall evaluate soil bearing conditions prior to pouring foundations.
- Proof rolling must be performed in accordance with requirements.
- Site welders’ performance qualifications are required in accordance with ASME B31.1.
- Engine-generator manufacturer shall furnish a qualified representative to confirm proper installation and witness startup services.
- HSPS vertical turbine pumps shall be supplied by a single manufacturer responsible for the pumping system. A manufacturer’s field service representative experienced in vertical turbine pump installation shall verify installation and assist in startup and performance testing. Pumps shall ne NSF 61 compliant.
In accordance with FAR 36 and DFARS 236, the estimated construction price range for this project is between $10,000,000 and $25,000,000.
Estimated construction duration of the project is 450 calendar days.
The North American Industry Classification System code for this procurement 237110 (Water and Sewer Line and Related Structures Construction) which has a small business size standard of $45M.
The Product Service Code is: Y1NE (Construction of Water Supply Facilities)
Small businesses are reminded of FAR 52.219-14, Limitations on Subcontracting. Firm will not pay more than 85% of the amount paid by the Government for contract performance, excluding the cost of materials, to subcontractors that are not similarly situated entities. Any work that a similarly situated entity further subcontracts will count toward the 85% subcontract amount that cannot be exceeded. Large Businesses must comply with the FAR 52.219-9 by submitting a small business subcontracting plan should this action be solicited as full and open competition and an award is made to a large business firm.
Prior Government contract work is not required for submitting a response to this sources sought synopsis. All construction performance must be in compliance with the USACE Safety and Health Requirements Manual (EM 385- 1-1), and must also comply with all Federal, State and local laws, ordinances, codes and/or regulations.
Anticipated solicitation issuance date is on or about 9 March 2026, and the estimated proposal due date will be on or about 9 April 2026, The official synopsis citing the solicitation number will be issued on http://sam.gov, inviting firms to register electronically to receive a copy of the solicitation when it is issued.
Firm’s response to this Synopsis shall be limited to 5 pages and shall include the following information:
- Firm’s name, address, point of contact, phone number, and e-mail address.
- Firm’s interest in bidding on the solicitation when it is issued.
- Firm’s capability to perform the magnitude and complexity outlined in the Scope of Work above (include firm’s capability to execute construction- comparable work performed within the past 5 years):
Brief description of the project, customer name, timeliness of performance, and dollar value of the project) – provide at least 3 examples.
- Firm’s Business Size – LB, SB, 8(a), HUBZone, SDVOSB, or WOSB.
- Firm’s Joint Ventures (existing), including Mentor Protégés and teaming arrangement information is acceptable.
- Firm’s Bonding Capability (construction bonding level per contract and aggregate construction bonding level, both expressed in dollars) via letter from bonding company.
Interested Firm’s shall respond to this Sources Sought Synopsis no later than 2:00PM CST, 17 February 2026 All interested firms must be registered in SAM to be eligible for award of Government contracts. Mail, fax or email your response to Tyler Godwin, U.S. Army Corps of Engineers, Tulsa District (CECT-SWT), 2488 East 81st Street, Tulsa, OK 74137-4290. Email: Tyler.L.Godwin@usace.army.mil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Midwest City Water Tower | Award Notice | |
| Midwest City Water Tower | Solicitation | |
| Midwest City Water Tower | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Repair and Maintain Water Towers at FCI Terre Haute | BOP Field Acquisition Office | Total Small Business | |
| Arcadia Wet Well Rehabilitation | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity