Midwest City Water Tower
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912BV26RA027
- Agency
-
ENDIST Tulsa
US Army Corps of Engineers, Department of Defense
- Responses due
- Not on record
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- Midwest City, Oklahoma, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Tulsa District, is preparing to solicit a firm-fixed-price design-bid-build contract for construction of a water tower and associated infrastructure in Midwest City, Oklahoma, with no anticipated set-aside. The procurement will use negotiated procurement under FAR 15 with a Lowest Price Technically Acceptable evaluation approach; tradeoffs will not be permitted.
The scope includes construction of a new 500,000-gallon elevated storage tank with associated piping, electrical, controls, and site improvements; a new high service pump station with related systems; approximately 650 linear feet of new 12-inch ductile iron pipe connecting the tank access road to existing infrastructure on Timber Ridge Boulevard; and piping reconfiguration at the existing Titan Tower Tank site involving approximately 100 linear feet of 18-inch ductile iron pipe and 80 linear feet of 16-inch ductile iron pipe with appurtenances and reconnections. Work includes shoring, dewatering, pipe fittings, valves, restraints, traffic control, and site repairs as required.
Place of performance is Midwest City, Oklahoma County, Oklahoma. The project is classified under NAICS 237110 (Water and Sewer Line and Related Structures Construction) and PSC Y1NE (Construction of Water Supply Facilities). This is a pre-solicitation notice; no solicitation has been released and no contract will be awarded from this posting. No reimbursement will be provided for information submitted in response to this notice.
Notice text
Pre-solicitation Notice
For
MIDWEST CITY WATER TOWER
Midwest City, Oklahoma County, Oklahoma
This is a PRE-SOLICITATION NOTICE for the construction of a Water Tower and associated infrastructure for Midwest City, Oklahoma. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT WILL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this pre-solicitation notice or any follow up postings.
The U.S. Army Corps of Engineers – Tulsa District has been tasked to solicit for and award a contract to construct a new water tower for Midwest City, Oklahoma. The proposed design-bid-build project will be procured as an unrestricted, firm-fixed price contract in accordance with FAR 15, Negotiated Procurement, using the Lowest Price Technically Acceptable approach. Tradeoffs will not be permitted.
Project Description:
Midwest City (MWC)is developing a high-pressure zone to improve the low pressures within the southeastern portion of the water distribution system (WDS) and proposed improvements that include the following, and incidental related work:
- Construction of a new 500,000-gallon elevated storage tank (EST), including associated piping, electrical, controls, and site improvements.
- Construction of a new high service pump station (HSPS), including associated piping, electrical, controls, and site improvements. Work includes shoring and dewatering practices as required, and as indicated in the Contract Documents.
- Construction of approximately 650 linear feet of new 12-inch ductile iron pipe from the new EST access road to the existing pipe connection on Timber Ridge Blvd. Work includes all pipe fittings, valves, restraints, traffic control, and site repairs.
- Work to complete the piping reconfiguration at the existing Titan Tower Tank site, including approximately 100 linear feet of 18-inch ductile iron pipe, 80 linear feet of 16-inch ductile iron pipe, pipe appurtenances, and pipe reconnections.
- Reconfiguration of distribution system piping at the corner of 15th Street and Westminster Road, including a new connection from the 24-inch water main on the west side of Westminster Road to the 12-inch water main on the north side of 15th Street.
- All erosion and sediment control devices, device maintenance, construction stormwater permitting, and stormwater management throughout construction.
- Close required isolation valves to isolate the Timber Ridge Zone while coordinating the valve work with the Owner.
The estimated magnitude of construction for this project is between $10,000,000 and $25,000,000.
The North American Industry Classification System code for this procurement 237110 (Water and Sewer Line and Related Structures Construction) which has a small business size standard of $45M.
The Product Service Code is: Y1NE (Construction of Water Supply Facilities)
Estimated duration of construction of this project is 450 calendar days.
Anticipated solicitation issuance date is on or about 23 June 2026, and the estimated proposal due date will be on or about 23 July 2026.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Midwest City Water Tower | Award Notice | |
| Midwest City Water Tower | Solicitation | |
| This notice | Pre-Solicitation | |
| Midwest City Water Tower | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Repair and Maintain Water Towers at FCI Terre Haute | BOP Field Acquisition Office | Total Small Business | |
| Arcadia Wet Well Rehabilitation | ENDIST Tulsa | No set-aside | |
| Sewage Ejector and Line Assessment | ENDIST Tulsa | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity