2 versions

Update #2 · Latest ·

The “Centro Integrado - CEIN” or Integrated Center from the Forensic Medicine Directorate and Public Ministry, includes offices for administrative, prosecutors, investigators and forensic personnel in Choluteca, Honduras. In plans the CEIN includes: and Electrical Room with I-Line and Electric Panels; Module A1, A2, A3, D; and an Electric Backup Room where an electric generator will be installed in the future.

As of now, the CEIN has four existing panels and one I-Line of 800A. They can be found in the plans as panel CC1, CC2, CC3 found in the electrical room; and panel CC4 found in Module D.

There is electric transformer bank  (3x50KVA) located on the South-West Side of the Building at street level, at approximately 69 LM from the Electrical Room with I-Line and Electric Panels. The Electric Backup Room will be located at approximately 48LM from the Electrical Room.

The Medium Tension Electric Equipment will support the load for the IT equipment, illumination, interior output circuits, air conditioning, allowing the personnel to move into the facilities, and the CEIN to start operating.  Once in full capacity the total Electric Charge will be 289,036W.

Site visits will be conducted on 19 December 2022 from 1 pm to 3 pm at the following location: 

Juzgados Unificados de Choluteca

Centro Integrado del Ministerio Publico y Medicina Forense

Choluteca, Choluteca, Honduras

All interested parites wishing to participate in the site visit should submit the following information: the name of the company, and copy of the ID of the person attending to Ana Carcamo at carcamoag@state.gov by 12:00 pm on 16 December 2022. 

All questions regarding the site visit or the solicitation should be sent to the Contracting Offier, Kelly Byers at byerskl@state.gov no later than 12:00 pm on 20 December 2022.

Update #1 ·

The “Centro Integrado - CEIN” or Integrated Center from the Forensic Medicine Directorate and Public Ministry, includes offices for administrative, prosecutors, investigators and forensic personnel in Choluteca, Honduras. In plans the CEIN includes: and Electrical Room with I-Line and Electric Panels; Module A1, A2, A3, D; and an Electric Backup Room where an electric generator will be installed in the future.

As of now, the CEIN has four existing panels and one I-Line of 800A. They can be found in the plans as panel CC1, CC2, CC3 found in the electrical room; and panel CC4 found in Module D.

There is electric transformer bank  (3x50KVA) located on the South-West Side of the Building at street level, at approximately 69 LM from the Electrical Room with I-Line and Electric Panels. The Electric Backup Room will be located at approximately 48LM from the Electrical Room.

The Medium Tension Electric Equipment will support the load for the IT equipment, illumination, interior output circuits, air conditioning, allowing the personnel to move into the facilities, and the CEIN to start operating.  Once in full capacity the total Electric Charge will be 289,036W.

Files

File Type Posted
SOW (Medium Tension Electric Equipment and Installation).pdf PDF
191NLE23Q0001.pdf PDF

Notice history

Notice Type Posted
Medium Tension Equip & installation CEIN Choluteca Latest solicitation Solicitation
This notice Original Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors