Maroon Creek Trail Bridge

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1282X920R0001
Agency
Region 2 - Rocky Mountain Region Forest Service, Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Y1LB Construction Of Highways, Roads, Streets, Bridges, And Railways
Place of performance
Aspen CO 81611 USA

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

Amendment posted June 17, 2020 includes answers to questions asked during the pre-bid meeting held on June 16, 2020.  A revised SOW date June 17, 2020 is also posted.  The propsoal due date is extended to July 2, 2020.  All proposal material must be submitted via email to Michael.Ku@USDA.GOV.  Maximum email size allowed is 100MB.  Please do not mail any hard copy proposal materials as they will be discarded.

**************************************************************************************************************

DESCRIPTION OF WORK
The work shall consist of what is shown on the plans, stated in the specifications, and summarized below:
• Order, fabricate, and deliver to the sites all the Prefabricated Steel Trail Bridge materials
• Install traffic control signs and close the Maroon Scenic Trail and West Maroon Trail.
• Install erosion control measures including any stream-flow diversion system.
• Remove the existing bridges abutments as shown in the plans.
• Excavate for riprap streambanks and foundation protection.
• Install the geocell pads.
• Install the grade beams.
• Remove the stream-flow diversion system.
• Place the bridges.
• Place trail surface aggregate on Maroon Scenic Bridge #1 Replacement.
• Remove signs and re-open Maroon Scenic and West Maroon Trails.
• Final site work and cleanup.

PRICE RANGE

The Government's estimate is: Between $100,000 and $240,000

PRE-BID MEETING

Date: Tuesday, June 16, 2020

Time: 9:00 AM-12:00 PM

Location:

White River National Forest

Maroon Bells Welcome Station, Maroon Creek Road

Pitkin County, CO 81611

Meeting Details:

*The meeting will be held outdoors.  *Please maintain 6 foot social distancing at the meeting.  *Cellular phone coverage is not available at the meeting location.  We will meet at the welcome station and drive to the west maroon portal link trail parking lot at 9:00 a.m.  Forest service representative Bret Conant will conduct a project overview in the parking lot.  Next we will visit the two trail bridge replacement project sites and hold Q and A sessions at each site.  Meeting ending at 12:00 p.m., depart project area.

NOTICE TO OFFEROR
Proposals from this solicitation MUST and questions pertaining to this solicitation must be marked: 1282X920R0001 and submitted via email to Michael Ku, Contracting Officer, at Michael.Ku@usda.gov.  No phone calls will be accepted.

Update #1 ·

DESCRIPTION OF WORK
The work shall consist of what is shown on the plans, stated in the specifications, and summarized below:
• Order, fabricate, and deliver to the sites all the Prefabricated Steel Trail Bridge materials
• Install traffic control signs and close the Maroon Scenic Trail and West Maroon Trail.
• Install erosion control measures including any stream-flow diversion system.
• Remove the existing bridges abutments as shown in the plans.
• Excavate for riprap streambanks and foundation protection.
• Install the geocell pads.
• Install the grade beams.
• Remove the stream-flow diversion system.
• Place the bridges.
• Place trail surface aggregate on Maroon Scenic Bridge #1 Replacement.
• Remove signs and re-open Maroon Scenic and West Maroon Trails.
• Final site work and cleanup.

PRICE RANGE

The Government's estimate is: Between $100,000 and $240,000

PRE-BID MEETING

Date: Tuesday, June 16, 2020

Time: 9:00 AM-12:00 PM

Location:

White River National Forest

Maroon Bells Welcome Station, Maroon Creek Road

Pitkin County, CO 81611

Meeting Details:

*The meeting will be held outdoors.  *Please maintain 6 foot social distancing at the meeting.  *Cellular phone coverage is not available at the meeting location.  We will meet at the welcome station and drive to the west maroon portal link trail parking lot at 9:00 a.m.  Forest service representative Bret Conant will conduct a project overview in the parking lot.  Next we will visit the two trail bridge replacement project sites and hold Q and A sessions at each site.  Meeting ending at 12:00 p.m., depart project area.

NOTICE TO OFFEROR
Proposals from this solicitation MUST and questions pertaining to this solicitation must be marked: 1282X920R0001 and submitted via email to Michael Ku, Contracting Officer, at Michael.Ku@usda.gov.  No phone calls will be accepted.

Attachments

Files attached to this notice, newest first
File Type Posted
Maroon_Creek_TBR-SOW 6-17-2020.docx DOCX document
20200616MaroonBellsPreBidQA.DOCX DOCX document
20190710MaroonCrTBR-SpecList.xls XLS spreadsheet
Bid_Bond_SF24.pdf PDF
DirectionsToMaroonBellsWelcomeStation.pdf PDF
wage decision CO20200013.pdf PDF
SF 1442 5-27-2020.pdf PDF
20190720MaroonScenicPlansSIGNED (1).pdf PDF
20190710MaroonCrTBR-FirePlanWRNF (1).docx DOCX document
20190718WMPLTBplansSIGNED (2).pdf PDF
Experience_Questionnaire (1).doc DOC document
20190710MaroonCrTBR-Specs (1).doc DOC document
Maroon_Creek_TBR-SOW 5-27-2020.docx DOCX document
Payment_Bond_SF25A-16a.pdf PDF
Performance_Bond_SF25-16a.pdf PDF
Show all 15

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Maroon Creek Trail Bridges Award Award Notice
Maroon Creek Trail Bridge This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity