Marine Reserve Boat Storage and Maintenance Facility, Memphis, Tennessee

Award Notice Posted

Solicitation number
N4008314R3212
Agency
Awarded
to Accel Pacific JV
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
N4008314D3232-WE01 Federal contract award
NAICS code
236220 Commercial and Institutional Building Construction
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

This project consists of construction of a Boat Maintenance Facility which also includes an Organic Storage Warehouse, Martial Arts Pit, and a Bridge Component Storage Area. The Boat Maintenance Facility design and construction consists of a one story 6,500 SF concrete framed structure with concrete foundation, concrete floor, masonry walls, insulated metal panels and standing seam metal roof. Boat storage building will primarily be used for storage and maintenance of MKIII Bridge Erection Boats (BEB), Combat Rubber Raiding/Reconnaissance Craft (CRRC) and associated trailer for each boat. The building may be occupied by as many as (25) Marines on drill weekends. The boat storage building shall house (4) boat BAYS, Zodiac storage and workshop, and Mechanical/Electrical room.





This Organic Storage Warehouse will include the design and construction of a 4,000 SF Pre-Engineered metal building with concrete foundation, concrete floor, insulated metal panels and standing seam metal roof. Organic storage building shall be an open space to house organic storage items.



The Bridge Component Storage Area is an offsite area for the bridge component storage. The location for this Storage Area is a grass field located northwest of the Marine Reserve Center on the west side of Kearsarge Avenue. The offsite area was previously developed with buildings and storage areas. The Storage Area will require approximately 56,000 square feet of land and will include; gravel previous surface and a perimeter chain link security fence with two access gates.



The Martial Arts Pit is a 24 foot by 24 foot by 24 foot curbed and covered area without exterior walls.

The Pit construction includes a non-continuous foundation, under pit drainage system (per soil conditions), playcurb, padded steel columns, and a standing metal seam roof. The pit will be filled with six inches of rubber mulch with Judo Mats on top, provided by the Contractor.

Notice history

Notice Type Posted
This notice Latest Award Notice
Design Build Multiple Award Construction Contract and Seed Project Task Order Award Notice
DB MACC NAVFAC midwest Award Notice
Design/Build Multiple Award Construction Contract Original Award Notice