Maintenance Dredging of the Federal Navigation Project (FNP) at the Portsmouth Harbor and Piscataqua River in Newington, New Hampshire and Elliot, Maine

Closed Solicitation Posted

Solicitation number
W912WJ23B0017
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, New England District is seeking bids for maintenance dredging of the Federal Navigation Project at Portsmouth Harbor and Piscataqua River in Newington, New Hampshire and Elliot, Maine. The solicitation requires a hydraulic hopper dredge to remove approximately 40,000 cubic yards of sand and gravel from areas in the authorized 35 foot deep by 400 foot wide main ship channel. Bids are due by September 18, 2023 and award will be made based on lowest price technically acceptable. The work must be completed between December 1, 2023 and March 15, 2024.

There is no set-aside designation. The NAICS code is 237990 with a size standard of $37 million. The estimated construction cost ranges from $1 to $5 million to dredge approximately 40,000 cubic yards from the channel. The dredged material will be placed at a designated in-river site downstream from the dredging areas. The work is expected to take 4 to 6 weeks to complete and will be performed in Newington, New Hampshire and Elliot, Maine.

Notice text

The U.S. Army Corps of Engineers, New England District will be issuing an Invitation for Bids (IFB) for dredging of the Federal Navigation Project (FNP) at the Portsmouth Harbor and Piscataqua River in Newington, New Hampshire and Elliot, Maine. This will be an unrestricted invitation for bid (IFB) requiring a hydraulic hopper dredge to perform the dredging work. The NAICS code for this procurement is 237990 with a size standard of $37M. The estimated construction cost is expected to range from $1,000,000 - $5,000,000. This project has a hopper dredge only requirement and consists of maintenance dredging and advance maintenance dredging to remove approximately 40,000 cubic yards (cy) of clean sand and gravel from areas in the authorized, 35 foot deep by 400 foot wide, main-ship channel in the Newington Reach of the Portsmouth Harbor and Piscataqua River FNP. Dredging in the channel will be to a maximum elevation of -40? Mean Lower Low Water (MLLW) and remove approximately 40,000 cubic yards of sand and gravel. The dredged material will be hauled and placed at the previously used in-river placement site, just downstream from the dredging areas. The dredging and dredged material placement work is expected to take 4-6 weeks to complete. The available work window for the dredging and placement of dredged material is from 1 December 2023 to 15 March 2024.

Files

File Type Posted
W912WJ23B0017 Bid Abstract.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Maintenance Dredging of the Federal Navigation Project (FNP) at the Portsmouth Harbor and Piscataqua River in Newington, New Hampshire and Elliot, Maine Original Pre-Solicitation

Similar open opportunities

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors