Maintenance Dredging of Red Hook Flats Anchorage, New York Harbor FNP

Award Notice Posted

Solicitation number
W912DS23C0017
Agency
Awarded
to The Dutra Group
Set-aside
No set-aside

Opportunity facts

Contract number
W912DS23C0017 Federal contract award
Place of performance
San Rafael, California 94901, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, New York District awarded a contract valued at $9,639,000 to THE DUTRA GROUP on August 18, 2023 to perform maintenance dredging of Red Hook Flats Anchorage in New York Harbor. The scope of work includes removing approximately 500,000 cubic yards of primarily silt and clay from the anchorage using a mechanical clamshell dredge with an environmental bucket and ocean-going, bottom-dumping barges, then placing the material at the Historic Area Remediation Site.

Notice text

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform maintenance dredging of Red Hook Flats Anchorage, New York Harbor, Federal Navigation Project to depths of -35 feet Mean Lower Low Water (MLLW) plus 2 feet of allowable overdepth, -40 feet MLLW plus 2 feet of allowable overdepth and -45 feet MLLW plus 2 feet of allowable overdepth.  The proposed maintenance dredging would remove approximately 500,000 cubic yards (CY) of material from the critical shoal area, located within the Red Hook Flats Anchorage. The dredged material would be dredged and subsequently placed at the Historic Area Remediation Site (HARS), approximately 4 miles east of Sandy Hook, New Jersey.  The dredged material is expected to consist primarily of silt and clay.

Based on the past dredging projects within the New York Harbor, and restrictions found in the New York State Department of Environmental Conservation Water Quality Certificate, the proposed work can only be performed by utilizing a mechanical clamshell dredge with environmental bucket.  Additionally, multiple ocean-going, bottom-dumping barges, tugboats and survey vessels will be needed to perform the work during the dredging and placement activities.  The dredging and placement at the HARS would be required to meet all federal, state, and approved local criteria required by the government agencies having jurisdiction where the dredging and placement sites are located.

Once the contract is awarded, the contractor will be required to commence work within five (5) calendar days after the date of receipt of the Notice to Proceed, and maintain an integrated production rate of at least 8,000 cubic yards per calendar day for the dredging and placement of the dredged material.  The presence of the dredging equipment in the channel will impact ship traffic, and it is necessary to maintain this production rate while minimizing the duration of this impact.

This is an unrestricted procurement.

Awarded contract W912DS23C0017 to THE DUTRA GROUP for 9639000.00 on 2023-08-18.

Notice history

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors