Maintenance Dredging, Fairless Turning Basin, Delaware River, Philadelphia to Trenton
Closed Pre-Solicitation Posted
- Solicitation number
- W912BU-19-B-0011
- Agency
-
ENDIST Philadelphia
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
- Place of performance
- US Corps of Engineers Philadelphia District Wamanaker Bldg, 100 Penn Square East Philadelphia, Pennsylvania 19107, United States
Notice details come from SAM.gov. Updated .
Notice text
11 versions
Update #11 · Latest ·
**************THERE ARE FIVE AMENDMENTS: (1) DRAWINGS, (2) BID DATE CORRECTION, (3) BID DATE EXTENSION, (4) CORRECTION TO 52.211-10 DAYS, AND (5) BID TIME CORRECTION/CHANGE
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #10 ·
*************THERE ARE FOUR AMENDMENTS: (1) DRAWINGS, (2) BID DATE CORRECTION, (3) BID DATE EXTENSION (4) CORRECTION TO 52.211-10 DAYS****
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #9 ·
*************THERE ARE ONLY THREE AMENDMENTS: (1) DRAWINGS, (2) BID DATE CORRECTION, (3) BID DATE EXTENSION****
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #8 ·
*************THE DRAWINGS ARE SHOWING AS AMENDMENT#2, BUT THEY ARE INCLUDED IN AMENDMENT #1*************
******THERE ARE ONLY TWO AMENDMENTS AND NOT THREE : AMDN#1 - DRAWINGS UPDATED....AMDN#2 BID DATE CORRECTION TO DOCUMENTS****
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #7 ·
*************THE DRAWINGS ARE SHOWING AS AMENDMENT#2, BUT THEY ARE INCLUDED IN AMENDMENT #1*************
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #6 ·
******THE AMENDMENT 0001 DRAWINGS ARE UNABLE TO BE UPLOADED TO SOLICITATION. PLEASE EMAIL ZAQUETTE EVERETT OR GREGORY KEATON FOR DRAWINGS*******
********THERE IS ONLY ONE AMENDMENT. AMENDMENT TWO IS A DUPLICATE************
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #5 ·
******THE AMENDMENT 0001 DRAWINGS ARE UNABLE TO BE UPLOADED TO SOLICITATION. PLEASE EMAIL ZAQUETTE EVERETT OR GREGORY KEATON FOR DRAWINGS*******
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #4 ·
******THE AMENDMENT 0001 DRAWINGS ARE UNABLE TO BE UPLOADED TO SOLICITATION. PLEASE EMAIL ZAQUETTE EVERETT OR GREGORY KEATON*******
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #3 ·
******THE DRAWINGS ARE NOW UPLOADED TO SOLICITATION*******
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #2 ·
******PLEASE CONTACT ZAQUETTE EVERETT OR GREGORY KEATON FOR DRAWINGS*******
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Update #1 ·
The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed price contract that consists of maintenance dredging within the Fairless Terminal Turning Basin on Delaware River, Philadelphia, Pennsylvania to Trenton, New Jersey.
Contract work consists of maintenance dredging of approximately 100,000 cubic yards of sediment within the federal channel portion of the Fairless Turning Basin, adjacent to the Delaware River. Work includes hydraulic dredging with placement of the dredged material into cell A-East of the Money Island Disposal Area in Falls Township, Pennsylvania. Dredging will be required to a depth of 41' MLLW (Datum) plus 1' allowable overdepth from station -0+245 to station 0+800. The contractor will also be required to construct an approximately 900 foot long, twelve foot high baffle dike within the Money Island Disposal Area. Sufficient borrow material for the baffle dike construction is available within the overall limits of the disposal area. The period of performance is 60 calendar days. Estimated cost range of the project is $1,000,000.00 to $5,000,000.
NAICS Code for this project is 237990 Other Heavy and Civil Engineering Construction and the size standard is $27.5 Million. [NOTE: Dredging: To be considered small for purposes of Government procurement, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern.]
This is procurement is being solicited as unresticted.
.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Pre-Solicitation | |
| Market Survey, Maintenance Dredging, Fairless Turning Basin, Delaware River, Philadelphia to Trenton | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity