Maintenance Dredging, Bigfoot Slough and Manteo Interior Channel, Hyde and Dare Counties, North Carolina
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- W912PM22B0027
- Agency
-
ENDIST Wilmington
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Z1KF Maintenance Of Dredging Facilities
- Place of performance
- Manteo, North Carolina 27954, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is seeking maintenance dredging services for Bigfoot Slough and Manteo Interior Channel in Hyde and Dare Counties, North Carolina. The U.S. Army Corps of Engineers Wilmington District will procure the removal of approximately 975,000 cubic yards of sediment from the waterways, to be placed on disposal islands, between September 2022 and March 2023. Interested firms must demonstrate ownership of hydraulic pipeline dredging equipment, bonding capacity of at least $10 million, and experience on similar past dredging projects of which at least 40% of the dredging volume was performed using the firm's owned equipment. Responses are due by May 31, 2022 and should include the requested capability information for consideration on the future solicitation expected to be issued with an estimated value between $10-25 million under NAICS code 237990.
No set-aside designation will be used for this procurement. The primary NAICS code is 237990 for dredging and surface cleanup activities, with an expected budget range of $10-25 million. Incumbent contractors on relevant past projects in the area may be considered for award. The scope of work involves removing approximately 975,000 cubic yards of sediment from Bigfoot Slough and Manteo Interior Channel to be placed on disposal islands from September 2022 through March 2023.
Notice text
2 versions
Update #2 · Latest ·
The work shall consist of approximately 300,000 cubic yards of material removed from Bigfoot Slough. The placement of dredged material will be on Bigfoot Slough Island. This dredging shall be performed by hydraulic pipeline dredge. Method of placement of dredged material will be by control of effluent. There is an environmental window for placement of dredged material on Bigfoot Slough Island from September 1 to March 31 for the protection of nesting waterbirds. This work also consists of maintenance dredging, Manteo Interior Channels, Dare County, North Carolina. Approximately 675,000 cubic yards of material is to be removed from Ranges 14, 14a, 14b, 15, 16, 17, 17 Extension, and Old House Channel Ranges 1 and 2. Dredging in Range 14a, Range 14b and a portion of Range 14 (Sta. 28+00 to 35+00) will be contract options. Disposal of dredged material will be on existing disposal islands. Disposal of dredged material for optional work will be on Island H. The dredging shall be performed by hydraulic pipeline dredge. Method of disposal of dredged material will be by control of effluent on all disposal islands except Island H. Island H is a confined disposal area with a containment dike and 2 spillway structures. There is an environmental window for placement of dredged material on disposal islands from September 1 to March 31 for the protection of nesting waterbirds.
Update #1 ·
Approximately 200,000 – 300,000 cubic yards of material is to be removed from Bigfoot Slough. Placement of dredged material will be on Bigfoot Slough Island. This dredging shall be performed by hydraulic pipeline dredge. Method of placement of dredged material will be by control of effluent. There is an environmental window for placement of dredged material on Bigfoot Slough Island from September 1 to March 31 for the protection of nesting waterbirds. This contract action also includes, maintenance dredging of Stumpy Point Harbor channel, Dare County, North Carolina. Approximately 300,000 cubic yards of material is to be removed from the Federal Channel. Placement of dredged material will be on an upland placement area adjacent to the channel. The dredging shall be performed by hydraulic pipeline dredge. Method of placement of dredged material will be by control of effluent. There is an environmental window for the dredging of Stumpy Point from November 1 to February 28.
Files
| File | Type | Posted |
|---|---|---|
| A7 - Sources Sought Notice - Bigfoot Slough and Manteo.pdf | ||
| A7 - Sources Sought Notice - Bigfoot Slough and Stumpy Point.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Silver Lake/Manteo Interior Channel Maintenance Dredging | Award Notice | |
| Silver Lake/Manteo Interior Channel Maintenance Dredging | Solicitation | |
| Silver Lake/Manteo Interior Channel Maintenance Dredging | Special Notice | |
| Silver Lake/Manteo Interior Channel Maintenance Dredging | Pre-Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity