Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest McKean and Warren Counties, Pennsylvania

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W911WN23B8007
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Pittsburgh District, is undertaking a project to rehabilitate Longhouse Scenic Drive (FR 262) within the Allegheny National Forest, Pennsylvania, on behalf of the USDA Forest Service. The project, divided into a Base Contract and three Options, involves tasks such as landslide repair, culvert removal and replacement, guide rail and delineator work, pavement work, roadside ditch re-establishment, roadside brushing and tree trimming, pavement marking, and sign and post system work. The bid opening is scheduled for October 5, 2023, and a site visit was held on August 18, 2023.

List of products and services:

  1. Landslide repair
  2. Culvert removal and replacement
  3. Aquatic Organism Passage structure and stream simulation
  4. Guide rail and delineator work
  5. Asphalt pavement mill and overlay
  6. Full width full depth pavement replacement
  7. Known and/or miscellaneous pavement spot repairs
  8. Roadside ditch re-establishment
  9. Roadside brushing and tree trimming
  10. Pavement marking
  11. Sign and post system work
  12. Protection and maintenance of traffic during construction
  13. Construction of proposed Vehicular Pull-Off Areas.

Notice text

3 versions

Update #3 · Latest ·

Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest, McKean and Warren Counties, Pennsylvania. - The U.S. Army Corps of Engineers, Pittsburgh District, has a project on behalf of the USDA Forest Service, Allegheny National Forest, Bradford Ranger District, to rehabilitate Longhouse Scenic Drive (FR 262) within the Allegheny National Forest, in accordance with the scope of work contained in the Interagency Agreement (IA) originally executed in July 2021.This requirement has been divided into a Base Contract and three (3) Options. The Base Contract work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 130+96 to Station 447+00, including but not limited to the following tasks: a. Complete work to repair the landslide. b. Remove and dispose the existing culvert conveying Dutchman Run and provide an Aquatic Organism Passage structure and stream simulation. c. Remove and dispose the existing culvert conveying Dewdrop Run and provide an Aquatic Organism Passage structure and stream simulation. d. Remove and dispose the existing culvert conveying Elijah Run and provide the proposed culvert. e. Remove and dispose the existing culvert conveying Trib 56529 to Dewdrop Run and provide the proposed culvert. f. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, and 36 inch culverts. g. Remove and dispose existing culvert headwalls and provide culvert headwalls for 24 inch and 30 inch culverts. h. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. i. Address defective guide rail elements. j. Remove and dispose existing guide rail delineators and provide new delineators. k. Execute asphalt pavement 1.5 inch mill and overlay. l. Execute full width full depth pavement replacement. m. Execute known and/or miscellaneous pavement spot repairs. n. Re-establish roadside ditches. o. Perform roadside brushing and tree trimming. p. Provide pavement markings. q. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s).r. Protection and maintenance of traffic during construction. The Option 1 work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 0+00 to Station 130+96 and from Station 447+00 to Station 597+86.04, and rehabilitating Jakes Rocks Road (FR 492) from Station 0+00 to Station 0+50, including but not limited to the following tasks: a. Remove and dispose the existing culvert conveying Mead Eddy Run and provide the proposed culvert and culvert outlet protection. b. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, 36 inch, and 48 inch culverts. c. Remove and dispose existing culverts and provide 65 inch x 40 inch Arch RCP Type B culverts. d. Remove and dispose existing culvert and provide 36.25 inch x 22.5 inch Arch RCP Type B culvert. e. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. f. Address defective guide rail elements. g. Remove and dispose existing guide rail delineators and provide new delineators. h. Execute asphalt pavement 1.5 inch mill and overlay. i. Execute full width full depth pavement replacement .j. Execute known and/or miscellaneous pavement spot repairs. k. Execute shoulder treatments. l. Re-establish roadside ditches. m. Perform roadside brushing and tree trimming. n. Provide pavement markings. o. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s). p. Protection and maintenance of traffic during construction. The Option 2 work consists of removing and disposing existing sign and post systems and/or providing new sign and post systems along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. The Option 3 work consists of completing all work to construct proposed Vehicular Pull-Off Areas 1, 3, 6, 10, and 11 along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. *** NOTICE *** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

5 October 2023 Bid Opening held. 

Update #2 ·

Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest, McKean and Warren Counties, Pennsylvania. - The U.S. Army Corps of Engineers, Pittsburgh District, has a project on behalf of the USDA Forest Service, Allegheny National Forest, Bradford Ranger District, to rehabilitate Longhouse Scenic Drive (FR 262) within the Allegheny National Forest, in accordance with the scope of work contained in the Interagency Agreement (IA) originally executed in July 2021.This requirement has been divided into a Base Contract and three (3) Options. The Base Contract work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 130+96 to Station 447+00, including but not limited to the following tasks: a. Complete work to repair the landslide. b. Remove and dispose the existing culvert conveying Dutchman Run and provide an Aquatic Organism Passage structure and stream simulation. c. Remove and dispose the existing culvert conveying Dewdrop Run and provide an Aquatic Organism Passage structure and stream simulation. d. Remove and dispose the existing culvert conveying Elijah Run and provide the proposed culvert. e. Remove and dispose the existing culvert conveying Trib 56529 to Dewdrop Run and provide the proposed culvert. f. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, and 36 inch culverts. g. Remove and dispose existing culvert headwalls and provide culvert headwalls for 24 inch and 30 inch culverts. h. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. i. Address defective guide rail elements. j. Remove and dispose existing guide rail delineators and provide new delineators. k. Execute asphalt pavement 1.5 inch mill and overlay. l. Execute full width full depth pavement replacement. m. Execute known and/or miscellaneous pavement spot repairs. n. Re-establish roadside ditches. o. Perform roadside brushing and tree trimming. p. Provide pavement markings. q. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s).r. Protection and maintenance of traffic during construction. The Option 1 work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 0+00 to Station 130+96 and from Station 447+00 to Station 597+86.04, and rehabilitating Jakes Rocks Road (FR 492) from Station 0+00 to Station 0+50, including but not limited to the following tasks: a. Remove and dispose the existing culvert conveying Mead Eddy Run and provide the proposed culvert and culvert outlet protection. b. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, 36 inch, and 48 inch culverts. c. Remove and dispose existing culverts and provide 65 inch x 40 inch Arch RCP Type B culverts. d. Remove and dispose existing culvert and provide 36.25 inch x 22.5 inch Arch RCP Type B culvert. e. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. f. Address defective guide rail elements. g. Remove and dispose existing guide rail delineators and provide new delineators. h. Execute asphalt pavement 1.5 inch mill and overlay. i. Execute full width full depth pavement replacement .j. Execute known and/or miscellaneous pavement spot repairs. k. Execute shoulder treatments. l. Re-establish roadside ditches. m. Perform roadside brushing and tree trimming. n. Provide pavement markings. o. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s). p. Protection and maintenance of traffic during construction. The Option 2 work consists of removing and disposing existing sign and post systems and/or providing new sign and post systems along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. The Option 3 work consists of completing all work to construct proposed Vehicular Pull-Off Areas 1, 3, 6, 10, and 11 along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. *** NOTICE *** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

Update #1 ·

Longhouse Scenic Drive Rehabilitation Project ? Allegheny National Forest, McKean and Warren Counties, Pennsylvania. - The U.S. Army Corps of Engineers, Pittsburgh District, has a project on behalf of the USDA Forest Service, Allegheny National Forest, Bradford Ranger District, to rehabilitate Longhouse Scenic Drive (FR 262) within the Allegheny National Forest, in accordance with the scope of work contained in the Interagency Agreement (IA) originally executed in July 2021.This requirement has been divided into a Base Contract and three (3) Options. The Base Contract work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 130+96 to Station 447+00, including but not limited to the following tasks: a. Complete work to repair the landslide. b. Remove and dispose the existing culvert conveying Dutchman Run and provide an Aquatic Organism Passage structure and stream simulation. c. Remove and dispose the existing culvert conveying Dewdrop Run and provide an Aquatic Organism Passage structure and stream simulation. d. Remove and dispose the existing culvert conveying Elijah Run and provide the proposed culvert. e. Remove and dispose the existing culvert conveying Trib 56529 to Dewdrop Run and provide the proposed culvert. f. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, and 36 inch culverts. g. Remove and dispose existing culvert headwalls and provide culvert headwalls for 24 inch and 30 inch culverts. h. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. i. Address defective guide rail elements. j. Remove and dispose existing guide rail delineators and provide new delineators. k. Execute asphalt pavement 1.5 inch mill and overlay. l. Execute full width full depth pavement replacement. m. Execute known and/or miscellaneous pavement spot repairs. n. Re-establish roadside ditches. o. Perform roadside brushing and tree trimming. p. Provide pavement markings. q. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s).r. Protection and maintenance of traffic during construction. The Option 1 work consists of rehabilitating Longhouse Scenic Drive (FR 262) from Station 0+00 to Station 130+96 and from Station 447+00 to Station 597+86.04, and rehabilitating Jakes Rocks Road (FR 492) from Station 0+00 to Station 0+50, including but not limited to the following tasks: a. Remove and dispose the existing culvert conveying Mead Eddy Run and provide the proposed culvert and culvert outlet protection. b. Remove and dispose existing culverts and provide 18 inch, 24 inch, 30 inch, 36 inch, and 48 inch culverts. c. Remove and dispose existing culverts and provide 65 inch x 40 inch Arch RCP Type B culverts. d. Remove and dispose existing culvert and provide 36.25 inch x 22.5 inch Arch RCP Type B culvert. e. Remove and dispose existing CMP half-pipes and/or provide culvert outlet protection. f. Address defective guide rail elements. g. Remove and dispose existing guide rail delineators and provide new delineators. h. Execute asphalt pavement 1.5 inch mill and overlay. i. Execute full width full depth pavement replacement .j. Execute known and/or miscellaneous pavement spot repairs. k. Execute shoulder treatments. l. Re-establish roadside ditches. m. Perform roadside brushing and tree trimming. n. Provide pavement markings. o. Remove and dispose existing sign and post systems and/or provide new sign and post systems, pertaining to trail crossing(s). p. Protection and maintenance of traffic during construction. The Option 2 work consists of removing and disposing existing sign and post systems and/or providing new sign and post systems along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. The Option 3 work consists of completing all work to construct proposed Vehicular Pull-Off Areas 1, 3, 6, 10, and 11 along Longhouse Scenic Drive (FR 262), and associated protection and maintenance of traffic during construction. *** NOTICE *** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on ?View FFP Contract Changes Playbook Here?.

SITE VISIT HELD 8/18/2023.

Files

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Jake Rocks Road Reconstruction Warren, Pennsylvania 16365, United States · NAICS 237310 Forest Service Total Small Business
Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation Borough of Millvale, City of Pittsburgh, Allegheny County, Pennsylvania 15223 · NAICS 237990 ENDIST Pittsburgh Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors