Long lead time material and detail design and construction of LPD 33-35 amphibious transport dock ship
Closed Pre-Solicitation Posted
- Solicitation number
- N00024-23-R-2473
- Agency
-
Naval Sea Systems Command
Department of the Navy, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 336611 Ship Building and Repairing
- PSC
- 1905 Combat Ships And Landing Vessels
- Place of performance
- Pascagoula, Mississippi 39567, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Naval Sea Systems Command plans to contract Huntington Ingalls Incorporated for the provision of Long Lead Time Material (LLTM) and Detail Design and Construction (DD&C) of the LPD 33-35 Amphibious Transport Dock Ships. The contract is intended to replace retiring LSD 41/49 Class amphibious ships with a SAN ANTONIO Class Flight II, with LPD 30 as the lead ship and LPD 33-35 as follow-on Flight II ships. The notice also aims to enhance competition by identifying subcontracting opportunities, and while the Government intends to negotiate with only one source, other responsible sources may submit a capability statement, proposal, or quotation within fifteen days after the publication of this synopsis.
Products and Services to be provided:
- Long Lead Time Material (LLTM)
- Detail Design and Construction (DD&C) of LPD 33-35 Amphibious Transport Dock Ships
- Life cycle engineering and support for the SAN ANTONIO Class Flight I and the lead Flight II ship
- Design, planning, construction, testing, and delivery of current and future amphibious ships
- Subcontracting opportunities for small businesses.
Notice text
The Naval Sea Systems Command intends to issue solicitation to Huntington Ingalls Incorporated, acting through its Ingalls Shipbuilding division (HII), 1000 Access Road, Pascagoula, MS 39567 for Long Lead Time Material (LLTM) and Detail Design and Construction (DD&C) of the LPD 33-35 Amphibious Transport Dock Ships. The LX(R) requirement that was developed to replace the retiring LSD 41/49 Class amphibious ships will be fulfilled with a SAN ANTONIO Class Flight II. LPD 30 is designated as the lead ship and LPD 33-35 are follow-on Flight II ships. As the designer, builder, and life cycle engineering and support provider of the entire SAN ANTONIO Class Flight I and the lead Flight II ship, HII is the only source with the requisite knowledge and experience required to construct LPD 33-35. Pursuing an alternate source through competition would result in significant duplication of costs and unacceptable delays due to the loss of design expertise and production efficiencies achieved on the previous 16 ships that cannot be recovered on LPD 33-35. No other vendor possesses the requisite facilities and qualified cadre of engineers, designers, and a construction workforce that can design, plan, construct, test, and deliver current and future amphibious ships. The primary purposes of the notice are to improve small business access to acquisition information and enhance competition by identifying subcontracting opportunities.
The proposed contract action is for supplies or services for which the Government intends to solicit and negotiate with only one source under authority of FAR 6.302-1. This notice of intent is not a request for competitive proposals. However, all responsible sources may submit a capability statement, proposal, or quotation within fifteen days after date of publication of this synopsis, which shall be considered by the Government. The Government will not reimburse respondents for any questions submitted or information provided because of this notice. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government. Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement.
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USS MAKIN ISLAND (LHD 8) FY28 Docking Selected Restricted Availability (DSRA) Request for Proposal(s) | Naval Sea Systems Command | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity