Lock and Dam Tow Rail Design and Replacement

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912ES18R0007
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

4 versions

Update #4 · Latest ·

Site Visits have been scheduled for the following dates and times. Everyone will meet at the relevant Lock's parking lot at the stated date and time.

28 AUGUST:
Lock and Dam 5 10:30 hours
Lock and Dam 5A 13:00 hours
Lock and Dam 4 1500 hours

29 AUGUST:
Lock and Dam 7 10:00 hours
Lock and Dam 8 13:00 hours
Lock and Dam 9 1500 hours

Update #3 ·

The St. Paul District is soliciting for the design and construction of new tow rail systems for six (6) of our lock and dam sites on the Mississippi River. It is the District's intent to select the contractor via a two-step design build process where the Corps will first post a Request for Qualifications (RFQ) and then select a small group (3-5) firms from those who responded to compete for the final contract award.

The current scope of the project includes but is not limited to:
1. Design of the new tow rail system
2. Removal of the existing tow rail system
3. Repair/replacement of concrete to support the new contractor designed tow rail system
4. Fabrication and installation of the new tow rail system
5. Testing and inspection to verify that the new system meets the required performance requirements.

Most of the work will be required to be completed during the non-navigation season to minimize the level of interference with river traffic. This will require the work, including removal and replacement of the concrete, to be completed in sub-freezing conditions.
The sites covered by this procurement are lock and dam 4, 5, 5A, 7, 8 & 9.

This Request for Qualifications (RFQ) is issued as unrestricted. The estimated price range for the base period is between $10 million and $25 million. The appropriate NAICS code for this procurement is 237990 with a small business size standard of $36,500,000

Update #2 ·

The St. Paul District is planning to solicit for the design and construction of new tow rail systems for up to six (6) of our lock and dam sites on the Mississippi River. It is the District's intent to select the contractor via a two-step design build process where the Corps will first post a Request for Qualifications (RFQ) and then select a small group (3-5) firms from those who responded to compete for the final contract award.

The current scope of the project includes but is not limited to:
1. Design of the new tow rail system
2. Removal of the existing tow rail system
3. Repair/replacement of concrete to support the new contractor designed tow rail system
4. Fabrication and installation of the new tow rail system
5. Testing and inspection to verify that the new system meets the required performance requirements.

Most of the work will be required to be completed during the non-navigation season to minimize the level of interference with river traffic. This will require the work, including removal and replacement of the concrete, to be completed in sub-freezing conditions.
The sites currently under consideration for this procurement are lock and dam 4, 5, 5A, 7, 8 & 9.

Update #1 ·

The St. Paul District is planning to solicit for the design and construction of new tow rail systems for up to six (6) of our lock and dam sites on the Mississippi River. It is the District's intent to select the contractor via a two-step design build process where the Corps will first post a Request for Qualifications (RFQ) and then select a small group (3-5) firms from those who responded to compete for the final contract award.

The current scope of the project includes but is not limited to:
1. Design of the new tow rail system
2. Removal of the existing tow rail system
3. Repair/replacement of concrete to support the new contractor designed tow rail system
4. Fabrication and installation of the new tow rail system
5. Testing and inspection to verify that the new system meets the required performance requirements.

Most of the work will be required to be completed during the non-navigation season to minimize the level of interference with river traffic. This will require the work, including removal and replacement of the concrete, to be completed in sub-freezing conditions.
The sites currently under consideration for this procurement are lock and dam 4, 5, 5A, 7, 8 & 9. These plans are still being finalized and are subject to revision before posting of the RFQ.

The anticipated posting date for the RFQ is approximately June 20, 2018.
It is the District's intent to issue the solicitation as full and open. The NAICS code for the proposed project is 237990 with a small business size standard of $36.5 million.

Files

Notice history

Notice Type Posted
Lock and Dam Tow Rail Design and Replacement Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors