Tow_Rail_W912ES18R0007_Amend_0002.pdf
PDF 85 KB Posted
- Attached to
- Lock and Dam Tow Rail Design and Replacement
- Solicitation number
- W912ES18R0007
About this file
W912ES18R0007 Amendment 0002 - Change in Contracting Personnel
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Travelling Mooring Bitt System Rehabilitation Solicitation 18R0007 Amendment 0002
The purpose of Amendment 0002 to RFQ 18R0007 is to change Paragraph 9 RFQ Submittal information to the following:
• 9 RFQ SUBMITTALS
The Offeror shall submit with its qualifications package all requested information specified in this solicitation. There will be no public opening of the qualifications packages received as a result o fthis solicitation. Offerors may submit their qualifications package via email in PDF format. Offerors submitting its qualification package via email should email the package to BOTH toni.w.wasgatt@usace.army.mil AND kevin.p.henricks @usace.army.mil.
Offerors who are hand-delivering their qualification package shall contact Toni Wasgatt, 651- 290-5409 to ensure receipt by the date and time listed below. Official time will be evaluated by the clock located in the area where qualifications are received. Offers determined to be late shall be rejected.
Qualifications will be received until 2:00 p.m. (local time) on 13 September 2018, at:
U.S. Army Corps of Engineers, St Paul District Attn: Toni Wasgatt 180 5th Street East, Suite 700 St Paul, MN 55101-1678
The Packaging shall be marked:
“Qualifications for Solicitation Number: W912ES18R0007, DO NOT OPEN”
• Note Toni Wasgatt has replaced Jesse Onkka as USACE Contracting POC for this requirement.
All other terms and conditions within this RFQ, including the date and time for qualification submissions remain unchanged and in effect.
mailto:toni.w.wasgatt@usace.army.mil
File details come from the government source that posted it.