Lindberg Field ATCT Heat Pump and AHU Replacement

Closed Solicitation Posted

Solicitation number
697DCK-23-R-00269
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
San Diego, California, United States

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks replacement of the heating, ventilation, and air conditioning system at the Lindbergh Field Air Traffic Control Tower in San Diego, California. The Federal Aviation Administration Southwestern Region requires demolition and replacement of two existing heat pumps, two air handling units, refrigerant lines, controls, wiring and associated equipment. Additional work includes installing disconnects, replacing thermostats and sensors, removing and reinstalling louvers, and demolishing and replacing dampers and actuators. Ductwork must be added or reused according to industry standards. Proposals are due by April 7, 2023 and the agency will evaluate cost, technical approach, and past performance.

The set-aside is for total small businesses. The primary NAICS code is 238220 and PSC code R499 covers facility heating, cooling, and air distribution equipment. The incumbent contractor is unknown and the estimated value is between $300,000 to $500,000. Work must be completed by December 31, 2023 at the air traffic control tower location in San Diego, California. Evaluation will consider cost, technical approach, and past performance records.

Notice text

5 versions

Update #5 · Latest ·

4/4/23: Amendment 02 posted.

4/4/23: Clarification on Due date and time. Proposals are due on April 7 at 1400 PST.

3/31/2023: Amendment 01 posted.

3/16/2023 Clarification on site visit time. he correct time should be 10am, not 9am.

The following is a summary of the work, but is not inclusive of all project elements:

1. Demolish and replace the two existing heat pumps and two existing air handling units with similar, updated units of the same capacity. New units shall utilize R-410a refrigerant. Demolish and replace refrigerant lines, disconnects, obsolete controls, and associated wiring.

2. Install disconnects to the new condensing units on the eight floor.

3. Replace one cab thermostat and provide one remote temperature sensor on the cab ceiling.

4. All other Work indicated in the Contract Documents.

5. Remove two louvers and re-install them

6. Demolish and replace few motorized dampers and actuator with similar.

7. Add new ducts or re-use existing ducts, all ducts (new and existing) bracing and
installation per SMACNA requirement.

Update #4 ·

4/4/23: Clarification on Due date and time. Proposals are due on April 7 at 1400 PST.

3/31/2023: Amendment 01 posted.

3/16/2023 Clarification on site visit time. he correct time should be 10am, not 9am.

The following is a summary of the work, but is not inclusive of all project elements:

1. Demolish and replace the two existing heat pumps and two existing air handling units with similar, updated units of the same capacity. New units shall utilize R-410a refrigerant. Demolish and replace refrigerant lines, disconnects, obsolete controls, and associated wiring.

2. Install disconnects to the new condensing units on the eight floor.

3. Replace one cab thermostat and provide one remote temperature sensor on the cab ceiling.

4. All other Work indicated in the Contract Documents.

5. Remove two louvers and re-install them

6. Demolish and replace few motorized dampers and actuator with similar.

7. Add new ducts or re-use existing ducts, all ducts (new and existing) bracing and
installation per SMACNA requirement.

Update #3 ·

3/31/2023: Amendment 01 posted.

3/16/2023 Clarification on site visit time. he correct time should be 10am, not 9am.

The following is a summary of the work, but is not inclusive of all project elements:

1. Demolish and replace the two existing heat pumps and two existing air handling units with similar, updated units of the same capacity. New units shall utilize R-410a refrigerant. Demolish and replace refrigerant lines, disconnects, obsolete controls, and associated wiring.

2. Install disconnects to the new condensing units on the eight floor.

3. Replace one cab thermostat and provide one remote temperature sensor on the cab ceiling.

4. All other Work indicated in the Contract Documents.

5. Remove two louvers and re-install them

6. Demolish and replace few motorized dampers and actuator with similar.

7. Add new ducts or re-use existing ducts, all ducts (new and existing) bracing and
installation per SMACNA requirement.

Update #2 ·

3/16/2023 Clarification on site visit time. he correct time should be 10am, not 9am.

The following is a summary of the work, but is not inclusive of all project elements:

1. Demolish and replace the two existing heat pumps and two existing air handling units with similar, updated units of the same capacity. New units shall utilize R-410a refrigerant. Demolish and replace refrigerant lines, disconnects, obsolete controls, and associated wiring.

2. Install disconnects to the new condensing units on the eight floor.

3. Replace one cab thermostat and provide one remote temperature sensor on the cab ceiling.

4. All other Work indicated in the Contract Documents.

5. Remove two louvers and re-install them

6. Demolish and replace few motorized dampers and actuator with similar.

7. Add new ducts or re-use existing ducts, all ducts (new and existing) bracing and
installation per SMACNA requirement.

Update #1 ·

The following is a summary of the work, but is not inclusive of all project elements:

1. Demolish and replace the two existing heat pumps and two existing air handling units with similar, updated units of the same capacity. New units shall utilize R-410a refrigerant. Demolish and replace refrigerant lines, disconnects, obsolete controls, and associated wiring.

2. Install disconnects to the new condensing units on the eight floor.

3. Replace one cab thermostat and provide one remote temperature sensor on the cab ceiling.

4. All other Work indicated in the Contract Documents.

5. Remove two louvers and re-install them

6. Demolish and replace few motorized dampers and actuator with similar.

7. Add new ducts or re-use existing ducts, all ducts (new and existing) bracing and
installation per SMACNA requirement.

Files

File Type Posted
Amendment 02.pdf PDF
Amendment 01.pdf PDF
SAN Specification.Rev 12.19.2022.pdf PDF
SAN ATCT Cab HVAC and Electrical set.pdf PDF
Past Performance Survey on 697DCK-23-R-00269.pdf PDF
DB.pdf PDF
697DCK-23-R-00269 (4).pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
Replace HVAC Rooftop Units at Building 2275 March Air Reserve Base, California 92518, United States · NAICS 238220 Army National Guard No set-aside
HVAC Unit Replacement NAICS 238220 National Oceanic and Atmospheric Administration Total Small Business
Replacement of 10 Ton HVAC Unit, Bldg. 11, PR ANG Carolina, Puerto Rico 00979, United States · NAICS 238220 Army National Guard Total Small Business
L7WC02_ B670 Paint Booth and HVAC Warner Robins, Georgia 31098, United States · NAICS 238220 Air Force Sustainment Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors