Lift Station Repair

Cancelled Solicitation Posted

Solicitation number
W912BV24Q0057
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Skiatook, Oklahoma 74070, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Corps of Engineers Engineering District Tulsa is seeking offers for the removal and installation of the Tall Chief lift station. The work includes removing the old tank and installing a new 1500-gallon tank, as well as replacing electrical components and pumps. The lift station serves a 2-unit waterborne restroom with an estimated peak daily flow of 600 gallons per day. Offerors must provide a complete pricing schedule, subcontractor information, and representations and certifications. A site visit is scheduled, and pre-award submissions are required, including an activity hazard analysis and work plan.

This contract opportunity is set aside for small business concerns. The period of performance is 60 days, and the lift station is located approximately 1 mile from the sewage lagoon with a vertical lift of 60 feet. The contract has an estimated value, but no specific budget range is provided. The place of performance is Skiatook, OK 74070, USA.

Notice text

2 versions

Update #2 · Latest ·

The Contractor shall be responsible for the mobilization of all personnel, materials, services, equipment and supplies necessary to complete the removal and installation of the Tall Chief lift station. Work includes removal of old tank and installation of a new tank, electrical components, and pumps. Contractor shall place new tank, electrical components and pumps to the specification provided. The general area shall be cleaned up by removing all materials from work site. After installation is completed, the area shall be finish graded to the desired contour to present a smooth appearance around the lift station. This lift station serves a 2-unit waterborne restroom each with a sink, toilet, and shower. Estimated peak daily flows are 600 gallons/day. The length of line from lift station to the sewage lagoon is approximately 1 mile and a vertical lift of 60 feet.

Update #1 ·

Complete the removal and installation of the Tall Chief liftstation. Work includes removal of old tank and installation of a new tank, electrical components, andpumps. Contractor shall place new tank, electrical components and pumps to the specificationprovided. The general area shall be cleaned up by removing all materials from work site. Afterinstallation is completed, the area shall be finish graded to the desired contour to present a smoothappearance around the lift station. This lift station serves a 2-unit waterborne restroom each with asink, toilet, and shower. Estimated peak daily flows are 600 gallons/day. The length of line from liftstation to the sewage lagoon is approximately 1 mile and a vertical lift of 60 feet.

Files

File Type Posted
Solicitation - W912BV24Q0057.pdf PDF
Lift Station Pictures.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Lift Station Repair Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Sewage Ejector and Line Assessment NAICS 237110 ENDIST Tulsa No set-aside
LAKE25-101-CC lift station pump repair NAICS 237110 Pacific West Region Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity