Libby Dam Intake Crane Replacement, Libby, MT.

Closed Pre-Solicitation Posted

A newer solicitation was posted. See the latest solicitation from .

Solicitation number
W912DW21X0FWU
Agency
ENDIST Seattle US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
333923 Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
PSC
Y1PZ Construction Of Other Non-Building Facilities
Place of performance
Libby MT 59923 USA

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks information to replace the intake crane at Libby Dam in Libby, Montana. The Department of the Army Corps of Engineers Engineering District Seattle intends to issue a firm-fixed price construction contract to design, fabricate, transport, install, and commission a new three-hoist intake gantry crane along with new lifting beams. Interested parties must submit information on their business classification, bonding, and ability to meet the requirements by March 16, 2021. The evaluation criteria will consider the respondent's experience and capacity.

There is no set-aside designated for this potential award. The NAICS code is 333923 and PSC code is Y1PZ with a small business size standard of 1,250 employees. The expected magnitude of construction is between $10 million and $25 million. The scope of work also includes removing the existing crane and rail system and installing new rail heaters and electrification. The changeover between cranes must be coordinated to minimize powerhouse outages at Libby Dam during replacement work.

Notice text

This is a SOURCES SOUGHT ANNOUNCEMENT and is for informational and market research purposes only. THIS IS NOT A REQUEST FOR PROPOSALS, QUOTATIONS, OR BIDS, NOR A SYNOPSIS OF A PROPOSED CONTRACT ACTION UNDER FAR SUBPART 5.2. The proposed action will be a construction project with a firm-fixed price contract. The type of solicitation to be issued will depend upon information received in response to this sources sought announcement. No reimbursement will be made for any costs associated with providing information in response to this sources sought announcement or any follow-up information.

Responses to this sources sought announcement will be used by the Government to make appropriate acquisition decisions. NO SOLICITATION IS CURRENTLY AVAILABLE. This is not a request to be placed on a solicitation mailing list and is not to be construed as a commitment by the Government. The results of this survey will be considered to be in effect for a period of one year from the date of this notice. The purpose of this sources sought announcement is to gain knowledge of potentially qualified Small Business, 8(a), Woman Owned Small Business, Service-Disabled Veteran Owned Small Business, and HUBZone contractor sources; as well as their size classifications relative to the NAICS code 333923, PSC code Y1PZ, and Small Business Size Standard 1,250 employees. Depending upon the responses associated with the business categories listed above, the solicitation will either be set aside in one of those categories or be issued as unrestricted and open to both small and large businesses. After review of the responses to this announcement and if the Government still plans to proceed with this project; a separate solicitation announcement will be published on Beta.Sam.Gov. Responses to this announcement are not an adequate response to any future solicitation announcement.

PROJECT DETAILS:
Libby Dam Intake Crane Replacement, Libby, MT.
 

Libby Dam is located on the Kootenai River, a tributary of the Columbia River and located near the town of Libby, Montana. The existing intake crane was designed and fabricated by Fulton Shipyard and installed in 1973. The crane has 3 hoists, each on independently operated trolleys, and performs the multiple functions described below.

  • Main Hoist – The 75 ton main hoist is used to deploy the penstock gates for emergency closure. The hoist has a permanently installed, 2 part lifting beam.  The main hoist of the crane is unique in that as the load is lowered in the slot, the lifting beam engages a ledge and splits in half.  This doubles the reeving from 8 to 16 parts and effectively doubles the load capacity.   A total load of 150 tons can be placed on the lifting beam without exceeding the rated load of the crane.
  • Auxiliary (Aux) Hoist – The 60 ton auxiliary hoist is used to deploy the sluice gate for emergency closure, place penstock bulkheads, and lift various hatch covers.
  • Trash Rack Hoist – The 10 ton trash rack hoist, is rated 10 tons, is used to remove the trash racks and lift various covers

Table 4, below summarizes the existing crane configuration:

Table 4. Existing Crane Configuration

Gantry

Span

30 feet

Rated Travel Speed

130 fpm

Main Hoist and Trolley

Rated Capacity

75 tons

Rated Hoisting Speed

16.2 fpm

Vertical Lift

271 feet

Hook Travel

24 feet

Trolley Span

30 feet

Trolley Travel Speed

15.3 fpm

Auxiliary Hoist and Trolley

Rated Capacity

60 tons

Rated Hoisting Speed

12 fpm

Vertical Lift

281 feet

Hook Travel

20 feet

Trolley Span

25 feet

Trolley Travel Speed

15 fpm

Trash Rack Hoist and Trolley

Rated Capacity

10 tons

Rated Hoisting Speed

20 fpm

Vertical Lift

255 feet

Hook Travel

38 feet

Trolley Span

25 feet

Trolley Travel Speed

24 fpm

Scope of work:

  • Design, fabricate, transport to site, install, and commission a new intake gantry crane.
    • The new crane will have 3 hoists, located on 2 trolleys at two different levels.  The main hoist trolley will support the 100-ton Main Hoist.  The Aux and Trash trolley will support the 70-ton Aux Hoist and 15-ton Trash Rack Hoist. Hoist functions are largely identical to existing.
    • The new crane will have an onboard emergency generator fueled by liquid propane.
  • Design, fabricate, transport to site, and test five new lifting beams for the new intake gantry crane
    • Main Hoist Lifting Beam
    • Sluiceway Emergency Closure Gate Lifting Beam
    • Penstock Bulkhead Lifting Beam
    • Penstock Trash Rack Lifting Beam
    • Selective Withdrawal Lifting Beam
  • Remove existing gantry crane and lifting devices from site.
  • Remove existing rail heaters and replace with new rail heaters, including removal and re-installation of asphalt in the rail pockets.
  • Remove existing crane electrification system and replace with new crane electrification system.

The existing intake crane provides critical powerhouse functions the loss of which loss of crane use or coverage negatively impacts powerhouse operations. The changeover between the old crane and new crane must be coordinated with Libby Dam to minimize outage.

The Dam Operations will carry on during work under this Contract.

Expected magnitude of construction is between $10 million and $25 million.


 

REQUIREMENTS:
Interested firms should submit a capabilities package, to include the following:
1. Firm's name, address, point of contact, phone number, and email address.
2. CAGE code and DUNS number.
3. Firm's interest in bidding on the solicitation if issued.
4. Business classification: Small Business (SB), Small Disadvantaged Business (SDB), Woman Owned Small Business (WOSB), Veteran Owned Small Business (VOSB), Service Disabled Veteran Owned Small Business (SDVOSB), Historically Underutilized Business Zone Small Business (HUBZone), 8(a) Program, Other Than Small Business (Large Business).
5. Firm's joint venture information (if applicable).
6. Bonding information:
    a. Single bond
    b. Aggregate
   
All interested parties who believe they can meet the requirements are invited to submit, in writing, complete information describing their interest and ability to meet all requirements stated above. Prior Government contract work is not required for submitting a response to this announcement.

Submit responses to: Alex Marcinkiewicz, Contract Specialist, via email: alex.r.marcinkiewicz@usace.army.mil. Responses should be sent as soon as possible, but not later than 10:00 AM PT, 16 Mar 2021.

All interested firms must be registered in the System for Award Management (www.SAM.gov) and remain active for the duration of the contract to be eligible for Government contracts.

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Libby Dam Intake Crane Replacement, Libby, MT. Latest solicitation Solicitation
Libby Dam Intake Crane Replacement, Libby, MT. Pre-Solicitation
Libby Dam Intake Crane Replacement, Libby, MT. This notice · Original Pre-Solicitation