Laguna Water Distribution System

Award Notice Posted

Solicitation number
AG-9A40-S-15-0007
Agency
Awarded
to James C Cushman Inc.
Set-aside
Total Small Business

Opportunity facts

Contract number
AG9A40C150010 Federal contract award
NAICS code
237110 Water and Sewer Line and Related Structures Construction
PSC
Not on record
Place of performance
Project Site: is located in San Diego County within the Mt. Laguna Recreation area. From San Diego, California, travel east on Interstate 8 for approximately 60 miles to Sunrise Highway (S1). Thence turn left on Sunrise Highway and travel northeast 5 miles to the second gated dirt road named Old County Road., United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Mar 10, 2015 5:09 pm This project is located on the Descanso Ranger District of the Cleveland National Forest. Work consists of the design and installation of a water distribution system, as follows: Electrical service, water treatment, pumping and delivery system, electrical control and remote monitoring system and the installation of a potable water tank, waterlines, electrical lines, a control system, road construction, and any other work necessary for the installation of a functioning potable water system.

This Design-Build process will have two distinct phases. Phase 1 will be the pre-qualification process, where the Government will select up to three to four  contractors on the basis of their qualifications and preliminary proposal(s). Only the selected contractors will then qualify for the Phase 2 process. In Phase 2 of the procurement procedure, Offerors will be given the opportunity to offer their preliminary design and/or technical approach and cost proposals.

Final selection and basis for award of the Design-Build contract will be qualifications, past experience, technical quality, price, and other salient factors considered to be the best value to the Government. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest priced or the highest technically-ranked. If awarded the contract, the Offeror shall provide and complete all necessary and required design and contraction documents, and complete construction in compliance with these requirements.

Files

File Type Posted
3_WELLHEAD_SITE_LAYOUT_AND_SURVEY_CONTROL.dwg DWG drawing
DIST_LINE_SHEET_1_rev.dwg DWG drawing
6_NEW_RESERVOIR_AND_WELL_CONTROLS.dwg DWG drawing
1_TitleSheet.dwg DWG drawing
8_ROAD_CONTRUCTION.dwg DWG drawing
7__NEW_SUNRISE_RESERVOIR_SITE.dwg DWG drawing
DIST_LINE_SHEET__3_rev.dwg DWG drawing
5_PLUMBING_DETAILS.dwg DWG drawing
2_LAGUNA_WATER_SYSTEM_LAYOUT.dwg DWG drawing
3A_WELLHEAD_PUMPHOUSE_GENERAL_CONSTRUCTION.dwg DWG drawing
DIST_LINE_SHEET_4_rev.dwg DWG drawing
4_PLUMBING_DETAILS.dwg DWG drawing
DIST_LINE_SHEET_2_.dwg DWG drawing
Solicitation.pdf PDF
Show all 14

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity