Laguna Water Distribution System
Award Notice Posted
- Solicitation number
- AG-9A40-S-15-0007
- Agency
-
Region 5 - Pacific Southwest Region
Forest Service, Department of Agriculture
- Awarded
- to James C Cushman Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- AG9A40C150010 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Project Site: is located in San Diego County within the Mt. Laguna Recreation area. From San Diego, California, travel east on Interstate 8 for approximately 60 miles to Sunrise Highway (S1). Thence turn left on Sunrise Highway and travel northeast 5 miles to the second gated dirt road named Old County Road., United States
Notice details come from SAM.gov. Updated .
Notice text
Added: Mar 10, 2015 5:09 pm
This project is located on the Descanso Ranger District of the Cleveland National Forest. Work consists of the design and installation of a water distribution system, as follows: Electrical service, water treatment, pumping and delivery system, electrical control and remote monitoring system and the installation of a potable water tank, waterlines, electrical lines, a control system, road construction, and any other work necessary for the installation of a functioning potable water system.
This Design-Build process will have two distinct phases. Phase 1 will be the pre-qualification process, where the Government will select up to three to four contractors on the basis of their qualifications and preliminary proposal(s). Only the selected contractors will then qualify for the Phase 2 process. In Phase 2 of the procurement procedure, Offerors will be given the opportunity to offer their preliminary design and/or technical approach and cost proposals.
Final selection and basis for award of the Design-Build contract will be qualifications, past experience, technical quality, price, and other salient factors considered to be the best value to the Government. The best value approach provides the opportunity to select an offeror who is not necessarily the lowest priced or the highest technically-ranked. If awarded the contract, the Offeror shall provide and complete all necessary and required design and contraction documents, and complete construction in compliance with these requirements.
Files
| File | Type | Posted |
|---|---|---|
| 3_WELLHEAD_SITE_LAYOUT_AND_SURVEY_CONTROL.dwg | DWG drawing | |
| DIST_LINE_SHEET_1_rev.dwg | DWG drawing | |
| 6_NEW_RESERVOIR_AND_WELL_CONTROLS.dwg | DWG drawing | |
| 1_TitleSheet.dwg | DWG drawing | |
| 8_ROAD_CONTRUCTION.dwg | DWG drawing | |
| 7__NEW_SUNRISE_RESERVOIR_SITE.dwg | DWG drawing | |
| DIST_LINE_SHEET__3_rev.dwg | DWG drawing | |
| 5_PLUMBING_DETAILS.dwg | DWG drawing | |
| 2_LAGUNA_WATER_SYSTEM_LAYOUT.dwg | DWG drawing | |
| 3A_WELLHEAD_PUMPHOUSE_GENERAL_CONSTRUCTION.dwg | DWG drawing | |
| DIST_LINE_SHEET_4_rev.dwg | DWG drawing | |
| 4_PLUMBING_DETAILS.dwg | DWG drawing | |
| DIST_LINE_SHEET_2_.dwg | DWG drawing | |
| Solicitation.pdf |
Show all 14
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity