Kffo-KRC_fence reconstruction

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
140L4326Q0114
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Interior Bureau of Land Management Oregon-Washington Region seeks reconstruction of approximately 2.59 miles of barbed wire fence along the Klamath River Canyon Rim in Klamath County, Oregon, with quotations due September 11, 2026. The procurement is set aside for small business concerns and carries an estimated contract value between $100,000 and $250,000.

Place of performance is the California-Oregon state line on the western edge of Klamath County, accessible via Highway 66 near Keno, Oregon, with portions requiring foot access due to terrain. Work includes removal and disposal of old fence material (approximately 1.3 miles on private land), clearing brush and felling hazard trees across 3.14 acres, construction of approximately 13,675 linear feet of standard 4-wire fence with three barbed wires and one smooth bottom wire, and installation of five Type A wire gates with cheater bars and wooden stays. T-posts must be spaced no more than 20 feet apart; corners and H-braces must be constructed from 2.5-inch drill stem pipe with bolted connections, installed every quarter-mile minimum. Wire specifications require 16-18 inches for the bottom wire, 6 inches for the next two wires, and 12 inches for the top wire, not exceeding 42 inches total height. Fence materials must comply with federal specifications for galvanized steel T-posts, 12.5-gauge barbed wire, and barbless bottom strand wire.

Contractor must commence work within 10 calendar days of notice to proceed and complete all work within 180 calendar days. Performance period runs October 1, 2026 through March 31, 2027. The procurement is subject to Davis-Bacon Act prevailing wage requirements for Klamath County, Oregon, with rates ranging from approximately $20.52 to $60.98 per hour plus fringe benefits. Performance and payment bonds at 100 percent of contract price are required, along with liability insurance of $500,000 per occurrence. Evaluation is based on technical acceptability and lowest price. Award will be made to the responsible quoter whose quote is most advantageous to the Government. Amendment 0001, issued August 26, 2026, does not extend the deadline but requires contractors to acknowledge receipt prior to quotation submission.

Notice text

KFFO-KRC_FENCE RECONSTRUCTION

Files

File Type Posted
Sol_140L4326Q0114_Amd_0001.pdf PDF
Sol_140L4326Q0114.pdf PDF
A04_SOW_Klamath_River_Canyon_Fence_Reconstruction.pdf PDF
B03_WD_OR20260071.pdf PDF
A04_STD_FNC_DWGS.pdf PDF

Notice history

Notice Type Posted
Kffo-KRC_fence reconstruction Award Award Notice
This notice Latest solicitation Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Lowline Area Burned Fence Construction Project Gunnison, Colorado, United States · NAICS 238990 Forest Service Total Small Business
Corral G-Z Stewardship IRSC, Region 6, Fremont-Winema National Forest, Bly Ranger District, Bly , Oregon Bly, Oregon 97622, United States · NAICS 113310 Forest Service Total Small Business
Rehab Kiosk Restrooms, NPS-ORCA Cave Junction, Oregon, United States · NAICS 236220 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors