KC-46A Fuel Maintenance Hangar Construction
Closed Solicitation Posted
- Solicitation number
- W912BV18R0047
- Agency
- ENDIST Tulsa US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- PSC
- Not on record
- Place of performance
- Tinker Air Force Base Oklahoma City, Oklahoma 73145, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Amendment 0003 is issued to incorporate the CLIN schedule and updates the following FAR Clauses 52.211-10, Commencement, Prosecution and Completion of Work (APR 1984) and 52.211-12, Liquidated Damages - Construction (SEP 2008) for Phase II of the solicitation. The most current wage rate determinations are also incorporated.
Only those offerors determined to be in teh Phase I competitive range shall submit propsals.
Phase II proposals are due no later than 2:00PM CST on 6 March 2019.
.
Update #3 ·
Amendment 0002 addresses changes to Paragraph 5.1.1 in Section 00 22 00..
Update #2 ·
Amendment 0001 addresses changes made to Section 5.0, Tab B - Factor 1: Specialized Experience, as well as Attachments 2 and 3 in Section 00 22 00..
Update #1 ·
The U.S. Army Corps of Engineers - Tulsa has been tasked to solicit for and award a contract for the design-build construction project of the KC-46A Depot Fuel Maintenance Hangar at Tinker AFB.
Project Description:
This project will include the planning, design, contracting and construction necessary to construct the KC-46A Depot Fuel Maintenance Hanger, to include a two-bay aircraft fuel maintenance dock, plant equipment maintenance support facility and associated back shop, administrative and facility support spaces, including program management support offices. The size of the facility will be approximately 89,997 SF. This project also includes clearing and grading the site, storm damage, aircraft parking apron, aircraft hangar dock access ramps and movement area, utility infrastructure systems, electrical, water, sewer, industrial waste, aircraft fueling system, communications, roads, vehicle parking, curb and gutter, walks and other supporting facilities. Facilities will be designed as permanent construction in accordance with DoD unified facilities criteria UFC 1-200-01. This project will comply with DoD antiterrorism/force protection requirements per unified facilities criteria UFC 4-010-01.
In accordance with DFARS Subpart 236.2, the estimated construction price range for this project is between $25,000,000 to $100,000,000.
The North American Industry Classification System code for this procurement is 236220, which has a small business size standard of $36.5M. It will be solicited as an unrestricted acquisition.
Estimated duration of the construction phase of this project is 630 calendar days.
No reimbursement will be made for any costs associated with submitting a proposal.
.
Attachments
| File | Type | Posted |
|---|---|---|
| Site_Vist_Sign_In_-_15_FEB_2019.pdf | ||
| W912BV18R00470003_Phase_II_AM3.pdf | ||
| W912BV18R00470002.pdf | ||
| W912BV18R00470001.pdf | ||
| W912BV18R0047.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| KC-46A Fuel Maintenance Hangar Construction | Solicitation | |
| KC-46A Fuel Maintenance Hangar Construction | Pre-Solicitation | |
| KC-46A Fuel Maintenance Hangar Construction | Pre-Solicitation |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity