KC-46A ADAL Hangars 1, 4 and 5, MacDill AFB, FL

Closed Pre-Solicitation Posted

Not the latest version. See the latest special notice from .

Solicitation number
W9127824R0010
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Tampa, Florida 33608, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Mobile District is seeking contractors to alter and renovate three existing aircraft hangars at MacDill Air Force Base in Florida to accommodate the KC-46A aircraft. The project includes extending the hangars, modifying interiors, and installing various systems to support maintenance and operations of the KC-46A. Responses from interested contractors are due by November 17, 2023 and shall provide information on bonding capacity, past performance on similar projects, and anticipated impacts of a potential Project Labor Agreement.

There is no set-aside designated for this procurement. The NAICS code is 236220 for commercial and institutional building construction with a size standard of $45 million. Potential award value is estimated between $50-75 million and work must be completed within 24 months of the notice to proceed. Contractors shall have experience with projects over $35 million and are asked to provide input on schedule and cost impacts of a Project Labor Agreement, as well as willingness to bid if one is mandated.

Notice text

Market Research and Sources Sought Notice for information on capability and availability of contractors to perform new construction for USACE customer at MacDill Air Force Base (AFB), FL.

The purpose of this Market Research and Sources Sought Notice is to acquire information on the number and capability of qualified Small Business and Large Business firms interested in a prospective procurement of construction services at MacDill AFB, FL. This is a Sources Sought Notice, NOT a solicitation announcement. Accordingly, no contract award will result from this Sources Sought Notice, as it does not constitute a commitment by the Government. Responses to this Sources Sought Notice will be used by the government in making an appropriate acquisition decision.

The U.S. Army Corps of Engineers, Mobile District, has a need for a construction contract to alter/renovate three (3) existing aircraft hangars at MacDill AFB in Hillsborough County, Florida. The objective of this project is for the contractor to provide all labor, materials, and equipment necessary to provide the following:

NVZR244601 KC-46A ADAL Aircraft Corrosion Control Hangar #1. Add an extension to allow full-in capability for the KC-46A aircraft and alter within existing corrosion control hangar to enable corrosion control operations for the KC-46A. The addition will be located on the northwest (flightline) side of the hangar to enable installation of a tail door with an extension to accommodate KC-46A tail height and meet upward door clearance requirements. Construction of the hangar extension includes a reinforced foundation, concrete floor slab, structural steel frame with metal siding façade, hangar doors with windows, and a built-up roof. Alteration work includes interior renovations to accommodate corrosion control, composite, paint, and sheet metal shops and wash rack operations on the first floor. Also included is an alteration of the interior wall nearest to the aircraft nose to achieve minimum safety clearance, addition of a fire protection system to the hangar bay, reconfiguration of lighting, a fall restraint system to accommodate KC-46A aircraft, and replacement of existing Heating, Ventilation, and Air Conditioning chillers and antiquated interior electrical panels. The project includes site improvements, such as installation of underground piping from the fire suppression pump house to Hangar 1, relocation of a privatized 6” water main on the flightline side of the hangar, and all other work necessary to make a complete and usable facility.

NVZR244602 KC-46A ADAL Aircraft Maintenance Hangar #4. Alter and add an extension to the existing aircraft maintenance hangar to allow full-in aircraft maintenance (including brake/hydraulic repair) capability for the KC-46A aircraft. The addition will be located on the southwest (flightline) side of the hangar to enable installation of a tail door with an extension to accommodate KC-46A tail height and meet the upward door clearance requirements. Construction of the hangar extension includes a reinforced foundation, concrete floor slab, structural steel frame with metal siding façade, hangar doors with windows, and a built-up roof. Alteration work includes interior renovations to accommodate hydraulic/brake, Boom and Wing Air Refueling Pod maintenance, and administrative shops on the first floor. Maintenance area will be established on the northeast side of the aircraft nose while Wing Air Refueling Pod storage will be established on the northwest side. Work also includes the addition of a fire protection system to the hangar bay, reconfiguration of lighting, fall restraint system to accommodate KC-46A aircraft, and replacement of existing Heating Ventilation and Air Conditioning chillers and antiquated interior electrical panels. The project includes site improvements, such as installation of underground piping from the fire suppression pump house to Hangar 4 and relocation of a privatized 6” water main on the flightline side of the hangar, and all other work necessary to make a complete and usable facility.

NVZR244603 KC-46A ADAL Fuel System Maintenance Dock Hangar #5. Add an extension to allow full-in capability for the KC-46A aircraft and alter within existing fuel cell hangar to accommodate KC-46A body fuel tank maintenance and storage at MacDill AFB. The addition will be located on the southwest (flightline) side of the hangar to enable retrofit of the tail door with an extension to accommodate KC-46A tail height and meet upward door clearance requirements. Construction of the hangar extension includes a reinforced foundation, concrete floor slab, structural steel frame with metal siding facade, hangar doors with windows, and a built-up roof. Alteration work includes interior renovation to accommodate body fuel tank storage and maintenance area. Work also includes reconfiguration of fire suppression appurtenances, lighting and fall restraint system to accommodate KC-46A aircraft. The project includes site improvements, such as relocation of a privatized 6” water main on the flightline side of the hangar to move it out from under the proposed hangar extension, and all other work necessary to make a complete and usable facility.

The prospective procurement will involve awarding a construction contract in the range of $50 - $75 million. Additionally, the project must be completed within 24 months after the Notice-to-Proceed is issued.

Sources being sought are firms with a North American Industry Classification System (NAICS) Code of 236220 with a Small Business Size Standard of $45 million. Responses should include the following information and shall not exceed a total of ten (10) pages:

1. Offeror's name, address, points of contact with telephone numbers and e-mail addresses.

2. Business size/classification to include any designations as Small Business, HUBZone, Service Disabled Veteran Owned, 8(a), Women-Owned shall be indicated on first page of submission.

3. Bonding capability (construction bonding level per single contract/task order and aggregate construction bonding level, both expressed in dollars along with current available bonding capacity.

4. Past Performance Information that documents the respondents experience performing projects similar to that described above. The referenced projects should be of similar scope and magnitude and should have been completed within the last eight years. Information should be provided in the form of Contract Performance Assessment Reporting System (CPARS), Past Performance Questionnaires (PPQs) or by providing the following information: Project title, location, general description of the construction to demonstrate similarity to the project listed above, the Offeror's role (i.e., prime contractor, subcontractor, etc.), dollar value of contract, duration, and name of the company, agency or government entity for which the work was performed with contact information (reference name, phone number and e-mail address).

As this project is anticipated to exceed $35M, in accordance with the executive order on Project Labor Agreements please provide the following information:

  1. The anticipated impacts to schedule and cost as a result of a Project Labor Agreement being mandatory.
  2. If a Project Labor Agreement is mandated on this project, would your company submit an offer when the solicitation is issued?

NO HARDCOPY RESPONSES WILL BE ACCEPTED. ALL RESPONSES WILL BE ELECTRONIC and submitted in pdf format to the following email address: jillian.e.saffle@usace.army.mil and kenneth.p.harlan@usace.army.mil. The subject line of the email shall reference the Market Research number in the announcement and submittals are due no later than 17 November 2023. Electronic submittals will be retained for future reference; however, they are to be considered source sensitive and not subject to public disclosure.

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
KC-46A ADAL Apron and Hydrant Fueling Pits MacDill AFB, FL 33621 · NAICS 237990 ENDIST Mobile No set-aside
Tinker AFB 2026 Multiple Award Construction Contract (MACC) Tinker AFB, Oklahoma 73145, United States · NAICS 236210 Air Force Sustainment Center Partial Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity