Johnstown Sediment Removal and Concrete Repair
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W911WN21B8001
- Agency
-
ENDIST Pittsburgh
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238910 Site Preparation Contractors
- Place of performance
- Johnstown, Pennsylvania 15901, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Pittsburgh District, is seeking to award a firm fixed-price contract to complete sediment removal and concrete repair work along the Stonycreek River in Johnstown, Pennsylvania. The selected contractor will remove approximately 6,600 cubic yards of sediment deposited between two bridges and dispose of it properly, clean and repair around 1,200 weepholes in concrete slopes, and clean and reseal 9,000 linear feet of expansion joints along 7,600 linear feet of river channel. The work must be completed within 365 calendar days of the notice to proceed. Bids were due by July 9, 2021.
This requirement has a total small business set-aside designation. The NAICS code is 237990 and PSC code is C211. The government estimate for the work ranged from $1,000,000 to $5,000,000. Four contractors submitted bids from $1,807,567.06 to $4,383,900.00, with the apparent low bidder at $1,807,567.06. All work will be performed along the Stonycreek River between the Horner Street Bridge and the Roosevelt Boulevard Bridge in Johnstown, Pennsylvania.
Notice text
4 versions
Update #4 · Latest ·
The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement to complete channel maintenance work within the Stonycreek River in the Local Flood Protection Project, in Johnstown, Cambria County, Pennsylvania. More specifically, the work area is located between the Horner Street Bridge and the Roosevelt Boulevard Bridge near Sargent’s Stadium near the confluence of the Stonycreek and Little Conemaugh Rivers.
Major features of work for this contract will include removal of approximately 6,600 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations. Also work will include the cleaning/repairing of approximately 1,200 weepholes along the concrete slopes and cleaning/resealing of approximately 9,000 linear feet of concrete expansion joints. This work will occur over a length of approximately 7,600 linear feet of river channel between the Sandyvale Memorial Park and the S.R. 56 Bridge.
The work area can be accessed from three (3) existing ramp locations located at Horner Street, Baumer/Poplar Street, and near the incline plane adjacent to Roosevelt Boulevard.
The work shall be completed within 365 calendar days after written Notice to Proceed. The estimated cost of the proposed work is between $1,000,000.00 and $5,000,000.00.
_________________________________________
Posted Site Visit Sign-in Sheet.
__________________________________________
AMENDMENT 0001
The purpose of this Amendment is to:
1) Answer questions arising from the Solicitation and/or Site Visit.
2) Provide revised Specifications Sections 01 11 00; 01 22 00.00 08; 01 32 23.00 08; and 33 11 00.08.
3) Change Contracting Officer in 00 21 00 - 4 SUBMISSION OF BIDS to Carole M. Householder.
_____________________________________________
Bid Opening Results Posted.
Update #3 ·
The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement to complete channel maintenance work within the Stonycreek River in the Local Flood Protection Project, in Johnstown, Cambria County, Pennsylvania. More specifically, the work area is located between the Horner Street Bridge and the Roosevelt Boulevard Bridge near Sargent’s Stadium near the confluence of the Stonycreek and Little Conemaugh Rivers.
Major features of work for this contract will include removal of approximately 6,600 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations. Also work will include the cleaning/repairing of approximately 1,200 weepholes along the concrete slopes and cleaning/resealing of approximately 9,000 linear feet of concrete expansion joints. This work will occur over a length of approximately 7,600 linear feet of river channel between the Sandyvale Memorial Park and the S.R. 56 Bridge.
The work area can be accessed from three (3) existing ramp locations located at Horner Street, Baumer/Poplar Street, and near the incline plane adjacent to Roosevelt Boulevard.
The work shall be completed within 365 calendar days after written Notice to Proceed. The estimated cost of the proposed work is between $1,000,000.00 and $5,000,000.00.
_________________________________________
Posted Site Visit Sign-in Sheet.
__________________________________________
AMENDMENT 0001
The purpose of this Amendment is to:
1) Answer questions arising from the Solicitation and/or Site Visit.
2) Provide revised Specifications Sections 01 11 00; 01 22 00.00 08; 01 32 23.00 08; and 33 11 00.08.
3) Change Contracting Officer in 00 21 00 - 4 SUBMISSION OF BIDS to Carole M. Householder.
Update #2 ·
The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement to complete channel maintenance work within the Stonycreek River in the Local Flood Protection Project, in Johnstown, Cambria County, Pennsylvania. More specifically, the work area is located between the Horner Street Bridge and the Roosevelt Boulevard Bridge near Sargent’s Stadium near the confluence of the Stonycreek and Little Conemaugh Rivers.
Major features of work for this contract will include removal of approximately 6,600 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations. Also work will include the cleaning/repairing of approximately 1,200 weepholes along the concrete slopes and cleaning/resealing of approximately 9,000 linear feet of concrete expansion joints. This work will occur over a length of approximately 7,600 linear feet of river channel between the Sandyvale Memorial Park and the S.R. 56 Bridge.
The work area can be accessed from three (3) existing ramp locations located at Horner Street, Baumer/Poplar Street, and near the incline plane adjacent to Roosevelt Boulevard.
The work shall be completed within 365 calendar days after written Notice to Proceed. The estimated cost of the proposed work is between $1,000,000.00 and $5,000,000.00.
_________________________________________
Posted Site Visit Sign-in Sheet.
Update #1 ·
The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement to complete channel maintenance work within the Stonycreek River in the Local Flood Protection Project, in Johnstown, Cambria County, Pennsylvania. More specifically, the work area is located between the Horner Street Bridge and the Roosevelt Boulevard Bridge near Sargent’s Stadium near the confluence of the Stonycreek and Little Conemaugh Rivers.
Major features of work for this contract will include removal of approximately 6,600 cubic yards of sediment that will be disposed of at a properly permitted facility and to restore the channel to as-built conditions. These sediment deposits will be sampled, removed, and disposed of in accordance with current State and Federal regulations. Also work will include the cleaning/repairing of approximately 1,200 weepholes along the concrete slopes and cleaning/resealing of approximately 9,000 linear feet of concrete expansion joints. This work will occur over a length of approximately 7,600 linear feet of river channel between the Sandyvale Memorial Park and the S.R. 56 Bridge.
The work area can be accessed from three (3) existing ramp locations located at Horner Street, Baumer/Poplar Street, and near the incline plane adjacent to Roosevelt Boulevard.
The work shall be completed within 365 calendar days after written Notice to Proceed. The estimated cost of the proposed work is between $1,000,000.00 and $5,000,000.00.
Files
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| Johnstown Sediment Removal and Concrete Repair | Award Notice | |
| This notice | Solicitation | |
| Johnstown Sediment Removal and Concrete Repair | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Canonsburg-Houston, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| JP Murtha Float Mooring Bitts Retrofit | ENDIST Pittsburgh | No set-aside | |
| Borough of Millvale, Pennsylvania, Local Protection Project (LPP) PL84-99 Rehabilitation | ENDIST Pittsburgh | Total Small Business | |
| Pittsburgh facility 079 MEP parking lot erosion control | ENDIST Philadelphia | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity