John Day Dam Bearing Shoe Repair - Phase 2

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W9127N22R0023
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Goldendale, Washington 98620, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers Portland District intends to solicit construction firms for a firm-fixed-price contract to repair the bearing shoes on the downstream gate at the John Day Dam near Klickitat County, Washington. Major elements of the project include replacing approximately 72 feet of bearing shoes in the middle third and 90 feet in the optional top third of the gate. Proposals will be evaluated using a best value tradeoff process as detailed in the forthcoming RFP. The solicitation will be released on May 30th and proposals will be due June 30th.

This will be an unrestricted procurement classified under NAICS code 237990 for other heavy and civil engineering construction with a size standard of $36.5 million. The estimated value is between $1 million and $5 million. Repairs to the middle third are scheduled for March 2023 and the optional top third for March 2024 during planned lock outages. The primary point of contact is Mr. Clinton Jacobsen.

Notice text

SYNOPSIS:  The U.S. Army Corps of Engineers (USACE) Portland District intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price proposal for this project. This announcement is for John Day Dam Bearing Shoe Repair - Phase 2 near Klickitat County, Washington.

PROJECT DESCRIPTIONS: The existing downstream gate was installed in 2011. Recently, gate inspections have observed that the bearing shoes on the north and south sides of the gate have experienced lateral cracking through the bolt holes. An interim repair of a 38" section on the south side was performed in March 2017 following a failure of that section. Subsequent inspections have found bolts loose within their respective threaded locations, or, in at least one case, a bolt sheared and spinning freely. A construction contract replaced the 'Bottom 1/3' of the bearing shoes in March 2018 addressing a number of the problems noted in recent inspections. However, the remaining existing bearing shoes must be replaced to address the noted problems in the remaining portions of the existing bearing shoes.

Major elements of the project include replacement of approximately 72 ft of bearing shoes as base CLINs ('Middle Third') and 90 ft of bearing shoes as optional CLINs ('Top Third') for the north and south sides of the Navigation Lock Downstream Gate with government furnished bearing shoes and incidental related work.

Work will be performed during two planned navigation lock outages in March 2023 and March 2024. The construction start date for the first in-water work period on the Middle 1/3 Bearing Shoes is expected to begin on 12 March 2023 and end on 23 March 2023 which is the final construction physical completion date for that work activity. The construction start date for the second in-water work period on the Top 1/3 Bearing Shoes (Optional CLIN) is expected to begin on 10 March 2024 and end on 23 March 2024 which is the final construction physical completion date for that work activity. 

Acquisition Strategy: The solicitation will be a request for proposal (RFP). Best Value/Trade Off source selection process will be used in the evaluation of proposals. Evaluation criteria will be stated in the RFP. This aquisition will result in a single firm-fixed-price contract with option CLINS.

Magnitude of Construction: The estimated cost of the project is between $1,000,000 and $5,000,000.

Set Asides and Codes: This is an unrestricted (full and open) procurement. This effort is classified through the North American Industry Classification System (NAICS) under code 237990, Other Heavy and Civil Engineering Construction (Size Standard: $36.5M).The FSC is Z1KA - Maintenance to Dams.

Point of Contact: The USACE-NWP Contract Specialist will be the primary point of contact for this action. E-mail responses to the Primary Point of Contact, Mr. Clinton Jacobsen at Clinton.M.Jacobsen@usace.army.mil, SUBJECT: John Day Dam Bearing Shoe Repair - Phase 2

Proposal Period: The solicitation is scheduled for release on or about 30 May 2022. The tentative date for receipt of proposals is on or about 30 June 2022.

THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON FBO ON OR ABOUT 30 MAY 2022. THIS NOTICE IS NOT A REQUEST FOR PROPOSALS AND PROPOSALS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEBORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRE-SOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

Notice history

Notice Type Posted
John Day Dam Bearing Shoe Repair - Phase 2 Award Award Notice
John Day Dam Bearing Shoe Repair - Phase 2 Latest solicitation Solicitation
This notice Pre-Solicitation
John Day Dam Bearing Shoe Repair - Phase 2 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
John day DAM navigation lock tainter valve (TV) repairs TV3 and TV4 Location and Access Details. Oregon Side Physical Access, Near Rufus, OR 97050 accessible via I-84, Exit 109. Washington Side (Closest Town), Goldendale, WA 98620 approximately 20 miles north across the river. River Location, Mile 216.6 on the Columbia River, joining Sherman County, Oregon, and Klickitat County, Washington. 98628 · NAICS 237990 ENDIST Portland No set-aside
John day DAM unit 10 packing box replacement John Day Dam, Sherman County, Oregonthe John Day Dam On The Columbia River Between Sherman County, Oregon, And Klickitat County, Washington. Rufus, Oregon 97050, United States · NAICS 237990 ENDIST Portland No set-aside
Navigation lock tainter valve (TV) repair, TV1 The Dalles Dam (Washington side), Lyle, WA 98635. 98635 · NAICS 237990 ENDIST Portland No set-aside
John Day Dam Powerhouse HVAC Upgrades (W9127N27BA007) Near Rufus, Oregon 97050 · NAICS 238220 ENDIST Portland No set-aside
CHJ 480V _ SQ1_SQ3_ DSQ1_DSQ2_Rep Chief Joseph Dam, Bridgeport, WA 98813 · NAICS 237990 ENDIST Seattle Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors