About this opportunity
The Department of the Army Corps of Engineers Engineering District Alaska is soliciting proposals for a Design-Bid-Build project to construct Petroleum, Oil, and Lubricant (POL) infrastructure supporting F-22 fighter aircraft operations at Joint Base Elmendorf-Richardson (JBER), Alaska. The project involves constructing a new JP-8 Tank Farm #6 with major components including a jet-fuel pumphouse conforming to DOD Standard Pressurized Hydrant Fueling System Type III, two 5,000-barrel aboveground storage tanks, diesel standby generator, underground receipt pipeline, truck offload and fill stands with canopies, and an underground stainless steel hydrant loop. Additionally, the scope includes demolishing the existing Tank Farm #5 facility and all associated infrastructure. The project aims to enhance readiness for Global Strike Task Force operations and maintain air dominance capabilities by increasing F-22 fuel storage capacity from 150,000 gallons to 420,000 gallons. Contractors requiring CUI Brand Name JA for generators must request specifications via email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil with their CAGE Code. The solicitation has a proposal due date of August 25, 2025, and notably, Project Labor Agreement requirements were initially added via Amendment 0006 but subsequently removed through Amendment 0008, with the proposal due date extended by 30 days due to this change.
This opportunity operates under the NAICS code 237120 (Oil and Gas Pipeline and Related Structures Construction) and PSC category Y1NA (Construction Of Fuel Supply Facilities) with no set-aside designation, making it open to all qualified contractors. The solicitation does not identify any incumbent contractors or specific budget ranges, though the scope suggests a substantial construction project given the infrastructure complexity and strategic importance. Key project specifications include an underground receipt pipeline with 1,800 gallons per minute capacity, a 2-position truck offload stand, 4-position fuel truck fill stand, and hydrant hose truck checkout station, all designed to significantly enhance fuel handling capabilities. The work will be performed at Joint Base Elmendorf-Richardson, specifically at 10471 20th St, Anchorage, Alaska 99506, requiring contractors to have experience with military fuel systems and Alaska construction conditions. The project represents a critical infrastructure upgrade that will nearly triple the fuel storage capacity available for F-22 operations at this strategic northern base.
Notice text
6 versions
Update #6 · Latest ·
This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code. Project Labor Agreement requirements have been removed from this project via amendment 0008. Proposal due date has been extended 30 days due to this change.
Update #5 ·
Project Labor Agreement requirements have been removed from this project via amendment 0008. Proposal due date has been extended 30 days due to this change.
This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code.
Update #4 ·
This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code. Due to regulation changes, a Project Labor Agreement has been deemed a requirement on this project. Amendment 0006 includes this requirement and extends the proposal due date to 8 July to allow time to incorporate this change.
Update #3 ·
This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code.
Update #2 ·
This Design Bid Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code.
Update #1 ·
This Design Build project will provide Petroleum, Oil, and Lubricant (POL) infrastructure necessary to support the 5th generation F-22 fighter aircraft at Joint Base Elmendorf-Richardson (JBER), Alaska to ensure readiness to support Global Strike Task Force and project overall air dominance. The project includes design documentation for a new JP- 8 Tank Farm #6 that includes the following major components: Jet-fuel pumphouse generally conforming to AW 078-24-28 DOD Standard Pressurized Hydrant Fueling System Type III, including two 5,000-Barrel aboveground storage tanks and diesel standby generator. Underground receipt pipeline (1,800 gpm) from the existing transfer line to the new pumphouse, 2-position truck offload stand with canopy, 4-position fuel truck fill stand and hydrant hose truck checkout station with canopy, Underground stainless steel hydrant loop to supply fueling points at truck fill stand, Demolition of existing Tank Farm #5 facility, including existing underground storage tanks, canopies, fuel truck fill stands, etc. Overall, this project will increase fuel storage for the F-22 from 150,000 gallons to 420,000 gallons. The addition of Tank Farm #6 and demolition of Tank Farm #5 will increase system capabilities at JBER Alaska. CUI Brand Name JA for generators must be requested by email to Katherine.green@usace.army.mil and Theresa.m.afrank.usace.army.mil to include CAGE Code.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| F-22 Fuel Dispensing System, JBER, ALASKA (JBE081) | Pre-Solicitation | |
| JBE081 F-22 Fuel Dispensing Systems_PLA | Special Notice | |
| JBE081 F-22 Fuel Dispensing System | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Market Intelligence Questionnaire JBR041 – Pallet Processing Facility/JBR044 – Rapid Deployment Facility | Department of Defense | No set-aside | |
| DESC2103C - Bulk Fuel Storage Tanks Phase II, Yokota Air Base, Japan | ENDIST Japan | No set-aside | |
| Market Intelligence for EIE483 and EIE484 | ENDIST Alaska | No set-aside |