James River Reserve Fleet_Drydocking PF-204 patrol boat

Closed Solicitation Posted

Solicitation number
6933A224Q000014
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
336611 Ship Building and Repairing
Place of performance
Norfolk, Virginia, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Department of Transportation Maritime Administration (MARAD) is seeking a contractor to provide all labor and materials required to perform a dry docking of the PF-204 Patrol Boat. The contractor will be required to deliver the vessel to their facility in the Hampton Roads area of Virginia within 3 working days of notice to proceed, and complete the 45-day period of performance. MARAD intends to have a representative on-site during most production days. The contract will be awarded to the responsible vendor with the lowest technically acceptable quote, evaluated on their approach, delivery schedule, and past performance.

This procurement is designated as a 100% Small Business Set-Aside under NAICS code 336611 (Ship Building and Repairing). The solicitation does not mention any incumbent contractors. The total contract value is not specified, but the Statement of Work includes optional additional labor hours and materials. The place of performance is the contractor's facility located in the Hampton Roads area, which includes the James River, Elizabeth River, York River, Mobjack Bay and tributaries.

Notice text

The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD). Contractor is to provide all labor and material required to perform a dry docking of PF-204 Patrol Boat according to the referenced Statement of Work. Barring any weather related or unforeseeable delays, MARAD intends for the patrol boat to be delivered and tendered to the contractor facility within three working days of notice to proceed. MARAD will deliver the PF-204 to the contractor’s facility which shall be located in the Hampton Roads area, such area to include the James River, all branches of the Elizabeth River, York River, Mobjack Bay and tributaries. The dry-docking POP will be 45 days upon completion of delivery and tender. MARAD will assume custody and take re-delivery of the craft at the same contractor’s facility after all work is performed and accepted. MARAD intends to have a representative on site during most production days while the craft is at the contractor’s facility. The contractor will provide the following services to support this project:

Files

File Type Posted
JRRF PF-204 Drydocking Solicitation.docx DOCX document
JRRF PF-4 Drydocking Solicitation.docx DOCX document
7.pdf PDF
13.pdf PDF
3.pdf PDF
4.pdf PDF
14.pdf PDF
41_FOOT UTB PLANS.pdf PDF
JRRF PF-4 Drydocking Solicitation.docx DOCX document
PF 204 SOWv2.docx DOCX document

Similar open opportunities

Opportunity Agency Set-aside Responses due
Drydock repairs for the CGC anvil NAICS 336611 — Total Small Business
USCGC hammer (wlic 75302) USCG 68A barge (68014) drydock repairs FY2027 Jacksonville, Florida 32226, United States · NAICS 336611 — Total Small Business
Drydock repairs for the CGC pamlico NAICS 336611 — Total Small Business
Dry-Dock: USCG STA CAPE MAY (45665) FY27 UWB NAICS 336611 Coast Guard Total Small Business
Drydock Repairs USCGC HATCHET (WLIC-75309) NAICS 33661 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity