J041--Chiller 7 & Pumps Replacement RFQ

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24926Q0155
Agency
Veterans Integrated Service Network 9 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
238220 Plumbing, Heating, and Air-Conditioning Contractors
PSC
J041 Maint/Repair/Rebuild Of Equipment- Refrigeration, Air Conditioning, And Air Circulating Equipment
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs Veterans Integrated Service Network 9 is soliciting quotes for the replacement of Chiller #7 and associated pumps at the Tennessee Valley Healthcare System Nashville facility. The procurement requires contractors to provide all labor, materials, equipment, and supervision necessary to demolish the existing chiller, install a new York Air Cooled Screw Chiller (Model YVAA0213 rated at 212.1 tons), install two new Tiger Flow CD65-1/1 vertical multi-stage pumps, perform structural steel modifications, upgrade electrical service from 400 amps to 500 amps, and install new isolation piping and insulation. Contractors must be certified Service-Disabled Veteran-Owned Small Business (SDVOSB) firms listed in the SBA certification database and must comply with subcontracting limitations not exceeding 75 percent to non-certified SDVOSB firms. Evaluation will be conducted using best value comparative analysis based on price, contractor experience, and past performance. Critical deadlines include March 24, 2026 at 12:00 p.m. EST for questions, March 30, 2026 at 5:00 p.m. EDT for quote submissions, and a mandatory site visit on March 30, 2026 at 1:00 p.m. CT.

This is a 100 percent SDVOSB set-aside acquisition with an estimated contract value of $19 million and no incumbent contractor as this is a new, standalone requirement. The period of performance runs from May 4, 2026 through October 31, 2026, with a completion deadline of October 31, 2026. The work will take place at the Tennessee Valley Healthcare System Nashville facility located at 1310 24th Avenue South, Nashville, Tennessee 37212, with the chiller located on the roof of the ACRE Building. Operating conditions require an entering water temperature of 54 degrees Fahrenheit, leaving water temperature of 44 degrees Fahrenheit, and a GPM flow rate of 510-520 at 460 volts with a 400-450 amp disconnect. Contractors must obtain VA-issued identification badges, present a professional appearance, comply with VA facility security and conduct requirements, and maintain proof of general liability insurance ($500,000 per occurrence), automobile liability coverage ($200,000 per person/$500,000 per occurrence), and workers' compensation insurance.

Notice text

2 versions

Update #2 · Latest ·

Contractor Questions and Government Answers

Government Answers provided to the best of our knowledge, Contractor is responsible for field verification of all existing conditions to confirm accuracy. A site visit is highly recommended.

Is this a brand-new contract OR is (was) there an incumbent performing these services? This is a new, stand alone requirement for the replacement of Chiller #7.

If not brand-new, can you please provide the current/previous contract number? N/A as this is a brand new contract.

The following questions (4-15) are for some clarification on the SOW:

Provide new Chiller: York Chiller Air Cooled Screw Chiller - Model: YVAA0213.

Is this a Sole Source requirement or are or equal chillers acceptable? LIKE FOR LIKE

What is the specific tonnage required for the chiller? 212.1

What is the operating conditions for the chiller: Entering/Leaving water temperature, GPM flow rate, voltage, amperage and disconnect size? EWT 54 Degrees and LWT 44 Degrees, GPM 510-520,460 V and 400-450A Disconnect.

Where is the disconnecting means for the chiller? Beside the chiller on the ACRE building roof.

Provide labor and equipment, on a Saturday, to demolish existing chiller #7 and with the use of a crane, remove from roof and haul chiller off site.

Where on the roof is the chiller located? Roof of the ACRE Building

Where is the crane to be set up? In between the VA Hospital and Vanderbilt Hospital

Where is access for crane to be located on site? North end of the VA Hospital

Is there any time frame for the crane to be on site? Coordinate with COR

Set structural steel additional pieces, piping, and accessories on roof.

What is the steel that is required?

Is it to be galvanized?

What is the size of the steel members?

Are they beams, angle, tube, etc?

Existing Steel is galvanized I-beam 16 main and 8 crossbeam. Contractor responsible for appropriate new steel required for safe and complete chiller installation in adherence with all applicable codes and regulations.

Provide labor, material, and tools to fabricate and reconfigure existing structural steel due to the fact the new chiller is wider than the existing.

What reconfiguration is required? Same location

New isolation springs will be provided and installed prior to setting up the chiller.

Are isolators to be provided by VA or Contractor? Contractor

What are specifications for the isolators and how many to be installed? Specifications (load rating, deflection, quantity) shall match chiller manufacturer recommendations for this model and meet all applicable codes, regulations, and industry standards.

Crane will also fly new pumps up to roof to transport to mechanical room.

How many pumps? 2

Are they end suction, double suction or inline type? The existing pumps are inline

What is the flow rate in GPM, HD of pump, voltage, amperage and disconnect? New pumps should be approx. 500 gpm at 70 ft head, to be adjusted by Contractor appropriately if there is a significant change in pressure drop resulting from the installation of this new chiller. VFDs should be provided for each pump to allow for modulation to desired flow conditions.

Where is the Mechanical Room Located, what is the access, how far from crane lift to the Mechanical Room? F10, 80FT

Are these the Tiger Flow Pumps referenced below or two additional pumps? These pumps correspond to the Tiger Flow pumps referenced in the SOW

Provide material and labor to pipe up new chiller as directed.

Who will provide the direction and what direction will be offered? COR will provide direction, where to set up the crane and access to the current chiller.

Material: New isolation valves, flex connections, piping, and fittings. Labor: To weld new piping, fittings, and flanges to install piping to chiller.

What is the size of Valves, FLex, Piping, and fittings. Are fittings and piping Schd 40 black steel, A53 type? Piping and fittings shall match existing system diameter and material.

Upgrade the existing 400amp feed to 500A.

Where is the feed coming from, a panel or MCC? Main switch gear both emergency and normal power. Contractor responsible to field verify existing feed locations and any required routing.

Provide manufacturer data to be able to price the new feed. See Photos listed below.

Supply/install 1 600A disconnect fused to 500A.

What is the specification for the disconnect, Nema Type and Material? Disconnect shall be NEMA 3R for outdoor installation with corrosion resistant construction.

Install 120V power to butterfly valve actuators.

Are any BAS/AUTOMATION Controls to be included with the project? Is this provided by VA or Contractor? Contractor

If contractor who is the VA Control Contractor Name and Contact Info? Controls contractor contact information will be provided after award

What size and where is the control valve located? Control valve location and size will be confirmed during the site visit.

Provide labor and material to insulate new chiller piping and pump piping (New chiller piping to include metal jacketing and sealed for outdoor application).

What type of insulation, Fiberglass, Foamglas, Poly, etc, and thickness to be used? Fiberglass insulation with aluminum jacketing is required for all exterior piping; thickness shall meet VA standard detail requirements and/or industry standards.

Could you provide a set of drawings to delineate the installation requirements, or asbuilts of the installation or sufficient photos and data? N/A

Can a site visit be arranged? If so, please provide dates and times available. A site visit can be arranged and highly recommended. Site Visits will occur on 03/30/2026 at 1pm Central Time Zone (CT). Meeting place will be the Boiler Plant, which is located at the loading dock of the VA Hospital. Please contact Clint Roberts at 629-401-7413 when you arrive or if you need assistance finding the location.

If a Site Visit is allowed, will there be an extension allowed for the quotes deadline? Yes, the quote deadline is extended until 04/13/2026 and the question deadline is extended until 04/07/2026.

END OF SOLICITATION AMENDMENT

Update #1 ·

END OF SOLICITATION

Attachments

Files attached to this notice, newest first
File Type Posted
36C24926Q0155 0001.docx DOCX document
36C24926Q0155_1.docx DOCX document

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
J041--Chiller 7 & Pumps Replacement Award Award Notice
J041--Chiller 7 & Pumps Replacement RFQ This notice · Latest solicitation Solicitation
J041--Chiller 7 & Pumps Replacement RFQ Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity