Iowa River Basin, Cedar River, Cedar Rapids, IA; Cedar Rapids Flood Risk Management Project 1st Avenue E Roller Gate Closure Structure

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W912EK21B0003
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Cedar Rapids Ia Usa

Notice details come from SAM.gov. Updated .

About this opportunity

This solicitation seeks construction services for the Iowa River Basin, Cedar River, Cedar Rapids Flood Risk Management Project 1st Avenue E Roller Gate Closure Structure. The Department of the Army Corps of Engineers Engineering District Rock Island will procure construction of a manually operated steel roller gate, reinforced concrete closure structures, floodwalls, and improvements to roadways and trails adjacent to 1st Avenue in Cedar Rapids, Iowa. Offerors must be capable of work including sheet pile installation, concrete work, gate fabrication and installation, utility relocations, and road/sidewalk reconstruction. The evaluation will consider technical qualifications, past performance, and price. The question deadline is April 15th and proposals are due April 22nd.

The set-aside is for total small business concerns. Relevant NAICS codes include 237110 and 237310. The current incumbent is unknown. The budget is unstated but includes site demolition, traffic control, concrete work, gate components, road/utility reconstruction, and construction oversight. The estimated performance period is one year at the project site in Cedar Rapids, Iowa.

Notice text

5 versions

Update #5 · Latest ·

Updated to attach Bid Summary Sheet/

The Prebid Meeting attendees have been added under the attachments of this announcement.

Amendment 0002 - The reason for this amendment is to make changes to the Specifications. See amendment narrative in the attached amendment for more details.

Amendment 0001 - The reason for this amendment is to extend the Question and Answer period under clause MVR.02 from 07 April 2021 to 15 April 2021 and to incorporate a Pre-Bid Meeting scheduled for 13 April 2021 at 10:00 AM CST.

The project includes, but is not limited to, the construction of a manually operated steel roller gate, reinforced concrete closure/storage monoliths, reinforced concrete tie-in floodwalls, and roadway/pedestrian trail reconfiguration and improvements. The project goal is to provide a closure across 1st Avenute (immediately adjacent to the tree of 5 season park and city hall in downtown Cedar Rapids).

Update #4 ·

The Prebid Meeting attendees have been added under the attachments of this announcement.

Amendment 0002 - The reason for this amendment is to make changes to the Specifications. See amendment narrative in the attached amendment for more details.

Amendment 0001 - The reason for this amendment is to extend the Question and Answer period under clause MVR.02 from 07 April 2021 to 15 April 2021 and to incorporate a Pre-Bid Meeting scheduled for 13 April 2021 at 10:00 AM CST.

The project includes, but is not limited to, the construction of a manually operated steel roller gate, reinforced concrete closure/storage monoliths, reinforced concrete tie-in floodwalls, and roadway/pedestrian trail reconfiguration and improvements. The project goal is to provide a closure across 1st Avenute (immediately adjacent to the tree of 5 season park and city hall in downtown Cedar Rapids).

Update #3 ·

Amendment 0002 - The reason for this amendment is to make changes to the Specifications. See amendment narrative in the attached amendment for more details.

Amendment 0001 - The reason for this amendment is to extend the Question and Answer period under clause MVR.02 from 07 April 2021 to 15 April 2021 and to incorporate a Pre-Bid Meeting scheduled for 13 April 2021 at 10:00 AM CST.

The project includes, but is not limited to, the construction of a manually operated steel roller gate, reinforced concrete closure/storage monoliths, reinforced concrete tie-in floodwalls, and roadway/pedestrian trail reconfiguration and improvements. The project goal is to provide a closure across 1st Avenute (immediately adjacent to the tree of 5 season park and city hall in downtown Cedar Rapids).

Update #2 ·

Amendment 0001 - The reason for this amendment is to extend the Question and Answer period under clause MVR.02 from 07 April 2021 to 15 April 2021 and to incorporate a Pre-Bid Meeting scheduled for 13 April 2021 at 10:00 AM CST.

The project includes, but is not limited to, the construction of a manually operated steel roller gate, reinforced concrete closure/storage monoliths, reinforced concrete tie-in floodwalls, and roadway/pedestrian trail reconfiguration and improvements. The project goal is to provide a closure across 1st Avenute (immediately adjacent to the tree of 5 season park and city hall in downtown Cedar Rapids).

Update #1 ·

The project includes, but is not limited to, the construction of a manually operated steel roller gate, reinforced concrete closure/storage monoliths, reinforced concrete tie-in floodwalls, and roadway/pedestrian trail reconfiguration and improvements. The project goal is to provide a closure across 1st Avenute (immediately adjacent to the tree of 5 season park and city hall in downtown Cedar Rapids).

Files

File Type Posted
W912EK21B0003 - Bid Summary.pdf PDF
W912EK21B0003 - PreBid Meeting Attendees.pdf PDF
W912EK21B0003-0002.pdf PDF
W912EK21B0003 - PLAN_SET_AMND0002.pdf PDF
W912EK21B00030001.pdf PDF
W912EK21B0003-Plan_Set.pdf PDF
W912EK21B0003.pdf PDF

Notice history

Similar open opportunities

Opportunity Agency Set-aside Responses due
Temporary Perimeter Flood Barriers 61299 · NAICS 314910 ENDIST Rock Island No set-aside
Illinois River Basin, Brandon Road L and D, Joliet, Illinois, Flushing Lock and Dam Gates Fabrication NAICS 326199 ENDIST Rock Island Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity