Interior Painting for Schools, Osan AB (MATOC ONLY)

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
W90VN619R0018
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Osan Ab Kor

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

1. SCOPE OF WORK: The work to be performed under the terms of this contract for completion of this project shall be as described below.

1.1. The contractor shall be responsible for furnishing all personnel, supervision, materials, tools, equipment, supplies, vehicles, and any other resources necessary to accomplish the requirements of this contract contained herein and as included in the contract specifications (STANDARD TECHNICAL SPECIFICATIONS FOR O&MA PROJECTS, KOREA, 2014) and drawings which form a part of this contract. The contractor shall paint the interior of middle & high schools, building multi.

1.2. The contractor shall apply MPI 47 (Interior alkyd semi-gloss, MPI gloss level 5) and MPI 54 (Interior latex semi-gloss, MPI gloss level 5, IAW O&MA standard technical specifications Section 09 90 00) paint for the interior of the buildings. The local MPI 47 products manufactured by KCC, KCI, NOROO and local MPI 54 products manufactured by KCC, KCI were approved by the Government.

- MPI 47, Color No: FSC 595C 26293 for metal, ferrous and non-ferrous surface
- MPI 54, Color No: FSC 595C 25630 for walls
- MPI 54, Color No: FSC 595C 27880 for restroom ceiling

2. PRINCIPLE WORK FEATURES (REMOVAL): N/A

3. PRINCIPLE WORK FEATURES (INSTALLATION): This project includes, but is not limited to, the following principles features of installation. (See attached floor plan)

(a) General
- All doors, windows, flooring and office workstation shall be covered by plastic covering. Yellow colored area does not need painting.
- Apply primer, intermediate and topcoat on CMU, concrete wall, gypsum board wall and ceiling area.
- Conduct thorough surface preparation on walls for damaged areas.
- Steel door frames and doors shall be painted not including mechanical rooms.
- HVAC duct and ceiling structure shall be painted after deteriorated surface removal.
- Wooden doors shall not be painted.

1) B-470 (Auditorium)
Height 19', need scaffolding or scissor lift
Wall + Ceiling: All area shall be painted
Wall: Hallways, RM# C102-C111. 8 EA

2) B-471 (Admin)
Wall + Ceiling: Stairways
Wall: B106-B210, C201, 16 EA

3) B-472 (HS classrooms and cougar café)
Open below Height 42', need scaffolding or scissor lift. Wall + Ceiling: Stairways
HVAC duct shall be repainted, interior SSMR surface shall not be painted.
Handrails and window frame

4) B-473 (Gym)
Height 34', need scaffolding or scissor lift.
Wall + Ceiling: Gym, locker room, existing steel structure not include inside of roof panel
Wall: Hallways

5) B-492 (Gym)
Height 34', need scaffolding or scissor lift.
Wall + Ceiling: Gym, stairways, locker room, truss not including inside of roof surface.
Wall: Office area, classrooms, hallways.

6) B-493 (Music facility)
Height 24', 21' and 18', need scaffolding or scissor lift. Wall + Ceiling: Classrooms, stairways
Wall: Office area, hallways, 5100-5107, 7 EA

7) B-494
Wall + Ceiling: Stairways
Wall: Office area, hallways, classrooms, 300-408 15 EA, S1011 1 EA

(b) Contractor must complete all type of paperworks for this project before summer break.

Contractor is responsible for move of wall and furniture, then place those items back on the walls and all cleaning work area after paint work.

 

Update #1 ·

PRINCIPLE WORK FEATURES (INSTALLATION): This project includes, but is not limited to, the
Following principles features of installation. (See attached floor plan)

(a) General - All Doors, windows, flooring and office desk station shall be covered by plastic covering. Yellow coloring area don't need paint area.

1) B-470
Height 19', need scaffolding or scissor lift.
Wall + Ceiling: Apply 2 coat Latex paint auditorium, rest rooms, and Locker room.
Wall: Connected hallway, Paint Steel door frames (exclude doors) from brown to blue paint, match the existing middle school.

2) B-471
Wall + Ceiling: Stairways, restrooms
Wall: Office area, Blue paint Steel door frames

3) B-472
Open below Height 42', need scaffolding or scissor lift.
Wall + Ceiling: Open below, Stairways, restrooms
Wall: Office area, classrooms, Blue paint Steel door frames and HVAC duct connected rooftop.

4) B-473
Gym Height 34', need scaffolding or scissor lift.
Wall + Ceiling: Gym, restrooms, Locker room, Blue paint existing steel truss.
Wall: Hallways, Blue paint Steel door frames.


5) B-492
Gym Height 34', need scaffolding or scissor lift.
Wall + Ceiling: Gym, stairways, restrooms, Locker room.
Wall: Office area, Classrooms, hallways.


6) B-493
Height 24', 21' and 18', need scaffolding or scissor lift.
Wall + Ceiling: Classrooms, stairways, restrooms.
Wall: Office area, hallways.

7) B-494
Wall + Ceiling: Stairways, restrooms.
Wall: Office area, hallways, Classrooms


(b) Color shall be decided by using agency using AMS Standard 595A. .

(c) After Contract award, Contractor must complete actual paint work between 17 June and 9 Aug 2019, during summer break. School needs time to have the floors cleaned.

Contractor is responsible for move of wall and furniture, then place those items back on the walls, all cleaning work area after paint wor

Files

File Type Posted
Room_Lists.xlsx XLSX spreadsheet
Amendment.pdf PDF
Osan_MHS_Drawings.pdf PDF
Bldg#492 3rd Floor.pdf PDF
Bldg#470-473(1).pdf PDF
Bldg#492 2nd Floor.pdf PDF
Bldg#470-473(2).pdf PDF
Bldg#494(1,2).pdf PDF
SF1442.pdf PDF
Bldg#493 1st Floor.pdf PDF
Bldg#492 1st Floor.pdf PDF
Floor_Plan.pdf PDF
Show all 12

Notice history

Notice Type Posted
Interior Painting for Schools, Osan AB (MATOC ONLY) Award Award Notice
This notice Latest solicitation Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors