Amendment.pdf
PDF 165 KB Posted
- Solicitation number
- W90VN619R0018
About this file
Amendment
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Room_Lists.xlsx | XLSX spreadsheet | |
| Osan_MHS_Drawings.pdf | ||
| Bldg#494(1,2).pdf | ||
| Bldg#492 1st Floor.pdf | ||
| Floor_Plan.pdf | ||
| Bldg#492 2nd Floor.pdf | ||
| Bldg#492 3rd Floor.pdf | ||
| Bldg#470-473(2).pdf | ||
| Bldg#470-473(1).pdf | ||
| SF1442.pdf | ||
| Bldg#493 1st Floor.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
411TH CSB, KOREA - RCO OSAN
POC: MR. YI, CHAE YONG
0503-357-6018
CHAEYONG.YI5.LN@MAIL.MIL
APO AP 96278-2039
KOREA, SOUTH
F3J3CE9029A001 85808
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to change the terms and conditions of the solicitation like below .
A) The closing date is extended to 19 Apr 2019 1400 Hrs.
B) The eligible contractors w ho can propose for this solicitation are changed due to exercise of the first option year.
Removed contract numbers: W91QVN-18-D-0055, -0068, -0078, -0093 Added contract number: W91QVN-18-D-0060
C) The updated SOW and draw ings are provided to specify and clarify the requirements in detail.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Apr-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W90VN619R0018
X 9B. DATED (SEE ITEM 11)
20-Mar-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Apr-2019
CODE
411TH CONTRACTING SUPPORT BRIGADE, KOREA
RCO OSAN, UNIT #2039
APO AP 96278-2039
UNITED STATES
W90VN6 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W90VN6
FACILITY CODECODE
EMAIL:TEL:
W90VN619R0018
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 12-Apr-2019 02:00 PM to 19-Apr-2019 02:00 PM.
The required performance has changed from THIS IS MATOC NON-WORK PLAN RFP FOR THE FOLLOWING CONTRACTORS ONLY:CONTRACT NO.: W91QVN-18-D-0053, -0054, -0055, -0056, -0057, - 0058, -0059, -0062, -0064, -0065, -0066, -0068, -0069, -0070, -0071, -0072, -0073, -0074, -0076, -0077, -0078, - 0093, -0163.OFFERORS MUST COMPLY WITH THE FOLLOWING:A. Site Visit: Offerors who intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause, FAR 52.236-7 in Section L for the schedule.B. Submission of Proposals (1) Proposal packet: It shall be submitted by 1400 Hrs on the closing date of RFP through FBO (https://www.fbo.gov) a. Pricing Proposal b. Offer Breakdown c.
Completion of Section K (5152.204-4032, Representations and Certifications)C. If the contractor is unable to submit the proposal in response to the RFP, the contractor shall submit a "No-Offer Letter" by the date and time specified in this solicitation. to THIS IS MATOC NON-WORK PLAN RFP FOR THE FOLLOWING CONTRACTORS ONLY:CONTRACT NO.: W91QVN-18-D-0053, -0054, -0056, -0057, -0058, -0059, -0060, -0062, -0064, -0065, - 0066, -0069, -0070, -0071, -0072, -0073, -0074, -0076, -0077, -0163.OFFERORS MUST COMPLY WITH THE FOLLOWING:A. Site Visit: Offerors who intend to propose on this solicitation are strongly encouraged to attend the site visit. See site visit clause, FAR 52.236-7 in Section L for the schedule.B. Submission of Proposals (1) Proposal packet: It shall be submitted by 1400 Hrs on the closing date of RFP through FBO (https://www.fbo.gov)
a. Pricing Proposal b. Offer Breakdown c. Completion of Section K (5152.204-4032, Representations and Certifications)C. If the contractor is unable to submit the proposal in response to the RFP, the contractor shall submit a "No-Offer Letter" by the date and time specified in this solicitation..
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
STATEMENT OF WORK (ver. 1)
INTERIOR PAINT MIDDLE & HIGH SCHOOL, BLDG MULTI
OSAN AB, KOREA
WORK ORDER 85808
1. SCOPE OF WORK: The work to be performed under the terms of this contract for completion of this project shall be as described below.
1.1. The contractor shall be responsible for furnishing all personnel, supervision, materials, tools, equipment, supplies, vehicles, and any other resources necessary to accomplish the requirements of this contract contained herein and as included in the contract specifications (STANDARD TECHNICAL SPECIFICATIONS FOR O&MA PROJECTS, KOREA, 2014) and drawings which form a part of this contract. The contractor shall paint the interior of middle & high schools, building multi.
1.2. The contractor shall apply MPI 47 (Interior alkyd semi-gloss, MPI gloss level 5) and MPI 54
(Interior latex semi-gloss, MPI gloss level 5, IAW O&MA standard technical specifications Section 09 90 00) paint for the interior of the buildings. The local MPI 47 products manufactured by KCC, KCI, NOROO and local MPI 54 products manufactured by KCC, KCI were approved by the Government.
- MPI 47, Color No: FSC 595C 26293 for metal, ferrous and non-ferrous surface
- MPI 54, Color No: FSC 595C 25630 for walls
- MPI 54, Color No: FSC 595C 27880 for restroom ceiling
2. PRINCIPLE WORK FEATURES (REMOVAL): N/A
3. PRINCIPLE WORK FEATURES (INSTALLATION): This project includes, but is not limited to, the following principles features of installation. (See attached floor plan)
(a) General
- All doors, windows, flooring and office workstation shall be covered by plastic covering. Yellow colored area does not need painting.
- Apply primer, intermediate and topcoat on CMU, concrete wall, gypsum board wall and ceiling area.
- Conduct thorough surface preparation on walls for damaged areas.
- Steel door frames and doors shall be painted not including mechanical rooms.
- HVAC duct and ceiling structure shall be painted after deteriorated surface removal.
- Wooden doors shall not be painted.
1) B-470 (Auditorium)
Height 19’, need scaffolding or scissor lift Wall + Ceiling: All area shall be painted Wall: Hallways, RM# C102-C111. 8 EA
2) B-471 (Admin)
Wall + Ceiling: Stairways Wall: B106-B210, C201, 16 EA
3) B-472 (HS classrooms and cougar café)
Open below Height 42’, need scaffolding or scissor lift. Wall + Ceiling: Stairways HVAC duct shall be repainted, interior SSMR surface shall not be painted.
Handrails and window frame
4) B-473 (Gym)
Height 34’, need scaffolding or scissor lift.
Wall + Ceiling: Gym, locker room, existing steel structure not include inside of roof panel Wall: Hallways
5) B-492 (Gym)
Height 34’, need scaffolding or scissor lift.
Wall + Ceiling: Gym, stairways, locker room, truss not including inside of roof surface.
Wall: Office area, classrooms, hallways.
6) B-493 (Music facility)
Height 24’, 21’ and 18’, need scaffolding or scissor lift. Wall + Ceiling: Classrooms, stairways Wall: Office area, hallways, 5100-5107, 7 EA
7) B-494
Wall + Ceiling: Stairways Wall: Office area, hallways, classrooms, 300-408 15 EA, S1011 1 EA
(b) Contractor must complete all type of paperworks for this project before summer break.
(c) Contractor is responsible for move of wall and furniture, then place those items back on the walls and all cleaning work area after paint work.
4. Damage: Any damage created as a result of the contractor's actions shall be repaired by him at no cost to the Government.
5. Contractor's responsibilities: It is the contractor's responsibility to verify the measurements provided in these documents and comply with items stated as any local regulations concerning this type of work.
(a) Contractor shall be responsible for cleaning and disposal of all work related debris.
6. Warranty: All material and workmanship shall be warranted against defects for a period of 1 year.
7. Work period: The contractor shall complete all type of work for this project in its entirety during summer break (17 Jun 2019 – 9 Aug 2019, 0730 -1930 Hrs, Mondays – Saturdays) after NTP.
CONTRACT SUBMITTALS REQUIREMENT
1. GENERAL: This project shall comply with the “Standard Technical Specifications and Standard Detail Drawings for OMA Projects, Korea” dated 30 October 2015 issued by the Department of the Army, Installation Management Agency, Korea Region Office. The most current specifications (OMA Specification 2015, Revision
1) and standard drawings are available at the CEOER, Operations Flight, 51st Civil Engineer Squadron, Osan AB, Unit 2129, APO AP 96278-2129 and are located on the Web Page http://www.usfk.mil/Resources/ContractingwithUSFK.aspx.
2. MATERIAL APPROVAL SUBMITTALS: Contractor shall have an approved AF Form 3000 for all material that is to be used on this contract. Contractor shall submit 4 copies of AF Form 3000 to the COR for approvals at least 15 days prior to ordering or using material for this project. Materials listed below require additional submittals as specified (i.e. sample, certificates of compliance, test data, catalog cuts, brochures, etc.)
ITEM NO. DESCRIPTION TYPE SUBMITTAL
1 Paint MSDS
(End of Summary of Changes)