Interior and Exterior Painting of Vault Restrooms
Closed Solicitation Posted
- Solicitation number
- 140R4025Q0006
- Agency
-
Bureau of Reclamation
Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238320 Painting and Wall Covering Contractors
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Interior Bureau of Reclamation is seeking a contractor to provide interior and exterior painting services for seven vault toilet buildings along the Middle Provo River near Heber City, Utah, as part of the Provo River Restoration Project. The work encompasses cleaning and painting graffiti, patching interior cracks, and painting all interior surfaces, exterior surfaces, and metal components of three single-unit and four double-unit Cascadian Model CXT Vault Toilet Buildings installed between the early 2000s and 2008. The contractor must provide all necessary manpower, tools, and expertise to complete comprehensive painting services, including exterior painting in a two-tone brown color scheme, interior painting with white walls and chemical-resistant urethane floors, and painting of 11 metal doors in complementary colors. The project requires compliance with Construction Wage Rate Requirements for Wasatch County, Utah, with painters earning $13.50 per hour under the prevailing wage determination. The solicitation was issued on July 15, 2025, with offers due by August 15, 2025, at 0900 local time, and the contract performance period will run from September 16, 2025, to January 13, 2026.
This procurement is designated as a total small business set-aside with an estimated construction value between $10,000 and $25,000, to be awarded as a firm-fixed price contract. The work involves painting approximately 6,076 square feet across 14 buildings, with single units measuring approximately 486 square feet exterior and 280 square feet interior, and double units measuring 620 square feet exterior and 293 square feet interior. The contractor will have 120 days after receiving the Notice to Proceed to complete all work, with operations restricted to Monday through Friday between 7:30 AM and 5 PM MST. The place of performance is the Utah Reclamation Mitigation and Conservation Commission's Provo River Restoration Project facilities in Midway, Utah. Approximately 90% of the restrooms currently have graffiti that must be addressed, and the project will conclude with a final walk-through inspection to ensure quality standards are met.
Notice text
Provo River Restoration Project Vault Restroom Interior and Exterior Painting
Files
| File | Type | Posted |
|---|---|---|
| Attachment_C___Schedule_B_Pricing.xlsx | XLSX spreadsheet | |
| Attachment_A___Performance_Work_Statement.pdf | ||
| Attachment_B_-_Wage_Determination.pdf | ||
| SF1442_Solicitation_7_15_2025.pdf | ||
| Sol_140R4025Q0006.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Provo River Restoration Project, Vault Restroom Interior and Exterior Painting | Pre-Solicitation | |
| Interior and Exterior Painting of Vault Restrooms at Provo River | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity