Industry day - port everglades deepening project, dredging environmental updates and coral nursery needs
Closed Special Notice Posted
- Solicitation number
- W912EP24Z0026
- Agency
-
ENDIST Jacksonville
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- Place of performance
- Fort Lauderdale, Florida 33316, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers Jacksonville District has issued a Special Notice for an Industry Day event regarding the Port Everglades Deepening project. The event will be held on July 23-24, 2024 in Fort Lauderdale, Florida and is focused on obtaining feedback from the dredging industry and supporting environmental contractors on the environmental updates and coral nursery needs for the upcoming dredging project.
The purpose of the event is for the government to gather information on topics such as artificial reef and boulder reef creation, coral nursery capabilities, relocation of corals/sponges/octocorals, and outplanting of benthic organisms. The government is seeking detailed responses to specific questions across these areas to inform the project's environmental mitigation planning. Interested firms must register by July 16, 2024 to request a one-hour breakout session, with a limit of 5 representatives per firm. The government is not seeking written responses prior to the event, but rather requests firms come prepared to discuss their relevant expertise during the breakout sessions. No reimbursement will be provided for costs associated with attending or providing information.
Notice text
5 versions
Update #5 · Latest ·
The virtual option for the Industry Day Presentation may be accessed at the following link: https://usace1.webex.com/usace1/j.php?MTID=mf59a6b428bdb7e52282cab8ddde9c0b4
Meeting number (access code): 2820 270 5826
Meeting password: YEpvDq6Z$28
INDUSTRY DAY: PORT EVERGLADES DEEPENING PROJECT – ENVIRONMENTAL UPDATE AND CORAL NURSERY NEEDS.
***July 24, 2024 - Industry Day PowerPoint presentations uploaded.***
***July 16, 2024 - Virtual meeting link and password provided.***
***July 9, 2024 - The Government's questions for the Port Everglades Deepening Project - Environmental Update and Coral Nursery Needs are uploaded.***
The Jacksonville District of the U.S. Army Corps of Engineers will be holding an Industry Day event regarding the environmental updates associated with the forthcoming Port Everglades Deepening project and seeks feedback from the coral reef nursery community, contractors with experience overseeing complex mitigation restoration projects, and supporting environmental contractors, which will only be used for preliminary planning purposes. Seeking specific information, a list of questions will be uploaded to the SAM.gov website under the subject Notice ID. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating larger numbers of corals for outplanting; relocation of large number of corals, sponges and octocorals, removal of corals from tires; experience in outplanting benthic organisms, site preparation and oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
Note: USACE Break-out sessions are limited to contractors and USACE personnel only. However, for those who wish to have similar sessions with the National Marine Fisheries Service (NMFS) representatives, you may contact Ms. Jocelyn Karazsia at jocelyn.karazsia@noaa.gov or call 561-247-2101.
Event Date: July 23, 2024 – July 24, 2024
Event Time: 9:00am, EST (July 23, 2024), 8:00am, EST (July 24, 2024)
Event Location: Hilton Fort Lauderdale Marina
1881 Southeast 17th Street
Fort Lauderdale, FL 33316
Event Schedule:
Day 1 - Presentation and Breakout Sessions
- Registration: 8:30am - 9:00am
- Overview, Contracting, and Small Business Opportunities Presentation: 9:00am - 10:00am
- Breakout Sessions (1 hour): 10:00am – 5:00pm
- Event Concludes: 5:00pm
Day 2 - Breakout Sessions
- Breakout Sessions (1 hour): 8:00am – 5:00pm
- Event Concludes: 5:00pm
Event Registration:
Interested firms shall utilize the provided link to register for this event and request a breakout session No Later Than (NLT) July 16, 2024 at 3:00pm, EST. As space is limited, breakout sessions will be scheduled on a first come, first serve basis. Due to limited space, only 5 representatives from each firm will be able to attend the breakout session.
https://www.eventbrite.com/e/port-everglades-environmental-updates-and-coral-nursery-industry-day-2024-tickets-922817611317
Event Details: The Government is planning an Industry Day event to obtain feedback from both the dredging industry and supporting environmental contractors. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating and/or growing and outplanting a large number and wide variety of corals; ideas or experience in preventing disease or actions to maximize the success of outplanting/ relocating corals, sponges and octocorals, experience outplanting and site preparation as well as oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
The Government will provide an overview presentation on the history and status of the Port Everglades Deepening project, including the monitoring and adaptive management plan coordinated with regulatory agencies, to date.
If interested in attending this event, firms can register utilizing the link provided above and request a one-hour breakout session to answer the Governments questions. Note: The Government is not seeking responses to questions in advance of the event, rather, is requesting firms come prepared to discuss the questions, applicable to their area of expertise, during their breakout session. The goal of the breakout sessions is for the Government to obtain information from coral reef practitioners, those experienced in executing, monitoring and/or overseeing benthic habitat or similar mitigation projects. Input from the coral reef industry including practitioners is critical to the success of the subject project.
NOTES:
DO NOT RESPOND TO QUESTIONS UNTIL YOUR SCHEDULED BREAKOUT SESSION.
DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.
NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED.
Update #4 ·
The virtual option for the Industry Day Presentation may be accessed at the following link: https://usace1.webex.com/usace1/j.php?MTID=mf59a6b428bdb7e52282cab8ddde9c0b4
Meeting number (access code): 2820 270 5826
Meeting password: YEpvDq6Z$28
INDUSTRY DAY: PORT EVERGLADES DEEPENING PROJECT – ENVIRONMENTAL UPDATE AND CORAL NURSERY NEEDS.
***July 16, 2024 - Virtual meeting link and password provided.***
***July 9, 2024 - The Government's questions for the Port Everglades Deepening Project - Environmental Update and Coral Nursery Needs are uploaded.***
The Jacksonville District of the U.S. Army Corps of Engineers will be holding an Industry Day event regarding the environmental updates associated with the forthcoming Port Everglades Deepening project and seeks feedback from the coral reef nursery community, contractors with experience overseeing complex mitigation restoration projects, and supporting environmental contractors, which will only be used for preliminary planning purposes. Seeking specific information, a list of questions will be uploaded to the SAM.gov website under the subject Notice ID. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating larger numbers of corals for outplanting; relocation of large number of corals, sponges and octocorals, removal of corals from tires; experience in outplanting benthic organisms, site preparation and oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
Note: USACE Break-out sessions are limited to contractors and USACE personnel only. However, for those who wish to have similar sessions with the National Marine Fisheries Service (NMFS) representatives, you may contact Ms. Jocelyn Karazsia at jocelyn.karazsia@noaa.gov or call 561-247-2101.
Event Date: July 23, 2024 – July 24, 2024
Event Time: 9:00am, EST (July 23, 2024), 8:00am, EST (July 24, 2024)
Event Location: Hilton Fort Lauderdale Marina
1881 Southeast 17th Street
Fort Lauderdale, FL 33316
Event Schedule:
Day 1 - Presentation and Breakout Sessions
- Registration: 8:30am - 9:00am
- Overview, Contracting, and Small Business Opportunities Presentation: 9:00am - 10:00am
- Breakout Sessions (1 hour): 10:00am – 5:00pm
- Event Concludes: 5:00pm
Day 2 - Breakout Sessions
- Breakout Sessions (1 hour): 8:00am – 5:00pm
- Event Concludes: 5:00pm
Event Registration:
Interested firms shall utilize the provided link to register for this event and request a breakout session No Later Than (NLT) July 16, 2024 at 3:00pm, EST. As space is limited, breakout sessions will be scheduled on a first come, first serve basis. Due to limited space, only 5 representatives from each firm will be able to attend the breakout session.
https://www.eventbrite.com/e/port-everglades-environmental-updates-and-coral-nursery-industry-day-2024-tickets-922817611317
Event Details: The Government is planning an Industry Day event to obtain feedback from both the dredging industry and supporting environmental contractors. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating and/or growing and outplanting a large number and wide variety of corals; ideas or experience in preventing disease or actions to maximize the success of outplanting/ relocating corals, sponges and octocorals, experience outplanting and site preparation as well as oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
The Government will provide an overview presentation on the history and status of the Port Everglades Deepening project, including the monitoring and adaptive management plan coordinated with regulatory agencies, to date.
If interested in attending this event, firms can register utilizing the link provided above and request a one-hour breakout session to answer the Governments questions. Note: The Government is not seeking responses to questions in advance of the event, rather, is requesting firms come prepared to discuss the questions, applicable to their area of expertise, during their breakout session. The goal of the breakout sessions is for the Government to obtain information from coral reef practitioners, those experienced in executing, monitoring and/or overseeing benthic habitat or similar mitigation projects. Input from the coral reef industry including practitioners is critical to the success of the subject project.
NOTES:
DO NOT RESPOND TO QUESTIONS UNTIL YOUR SCHEDULED BREAKOUT SESSION.
DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.
NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED.
Update #3 ·
The virtual option for the Industry Day Presentation may be accessed at the following link: https://usace1.webex.com/usace1/j.php?MTID=mf59a6b428bdb7e52282cab8ddde9c0b4
INDUSTRY DAY: PORT EVERGLADES DEEPENING PROJECT – ENVIRONMENTAL UPDATE AND CORAL NURSERY NEEDS.
***July 16, 2024 - Virtual meeting link provided.***
***July 9, 2024 - The Government's questions for the Port Everglades Deepening Project - Environmental Update and Coral Nursery Needs are uploaded.***
The Jacksonville District of the U.S. Army Corps of Engineers will be holding an Industry Day event regarding the environmental updates associated with the forthcoming Port Everglades Deepening project and seeks feedback from the coral reef nursery community, contractors with experience overseeing complex mitigation restoration projects, and supporting environmental contractors, which will only be used for preliminary planning purposes. Seeking specific information, a list of questions will be uploaded to the SAM.gov website under the subject Notice ID. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating larger numbers of corals for outplanting; relocation of large number of corals, sponges and octocorals, removal of corals from tires; experience in outplanting benthic organisms, site preparation and oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
Note: USACE Break-out sessions are limited to contractors and USACE personnel only. However, for those who wish to have similar sessions with the National Marine Fisheries Service (NMFS) representatives, you may contact Ms. Jocelyn Karazsia at jocelyn.karazsia@noaa.gov or call 561-247-2101.
Event Date: July 23, 2024 – July 24, 2024
Event Time: 9:00am, EST (July 23, 2024), 8:00am, EST (July 24, 2024)
Event Location: Hilton Fort Lauderdale Marina
1881 Southeast 17th Street
Fort Lauderdale, FL 33316
Event Schedule:
Day 1 - Presentation and Breakout Sessions
- Registration: 8:30am - 9:00am
- Overview, Contracting, and Small Business Opportunities Presentation: 9:00am - 10:00am
- Breakout Sessions (1 hour): 10:00am – 5:00pm
- Event Concludes: 5:00pm
Day 2 - Breakout Sessions
- Breakout Sessions (1 hour): 8:00am – 5:00pm
- Event Concludes: 5:00pm
Event Registration:
Interested firms shall utilize the provided link to register for this event and request a breakout session No Later Than (NLT) July 16, 2024 at 3:00pm, EST. As space is limited, breakout sessions will be scheduled on a first come, first serve basis. Due to limited space, only 5 representatives from each firm will be able to attend the breakout session.
https://www.eventbrite.com/e/port-everglades-environmental-updates-and-coral-nursery-industry-day-2024-tickets-922817611317
Event Details: The Government is planning an Industry Day event to obtain feedback from both the dredging industry and supporting environmental contractors. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating and/or growing and outplanting a large number and wide variety of corals; ideas or experience in preventing disease or actions to maximize the success of outplanting/ relocating corals, sponges and octocorals, experience outplanting and site preparation as well as oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
The Government will provide an overview presentation on the history and status of the Port Everglades Deepening project, including the monitoring and adaptive management plan coordinated with regulatory agencies, to date.
If interested in attending this event, firms can register utilizing the link provided above and request a one-hour breakout session to answer the Governments questions. Note: The Government is not seeking responses to questions in advance of the event, rather, is requesting firms come prepared to discuss the questions, applicable to their area of expertise, during their breakout session. The goal of the breakout sessions is for the Government to obtain information from coral reef practitioners, those experienced in executing, monitoring and/or overseeing benthic habitat or similar mitigation projects. Input from the coral reef industry including practitioners is critical to the success of the subject project.
NOTES:
DO NOT RESPOND TO QUESTIONS UNTIL YOUR SCHEDULED BREAKOUT SESSION.
DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.
NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED.
Update #2 ·
INDUSTRY DAY: PORT EVERGLADES DEEPENING PROJECT – ENVIRONMENTAL UPDATE AND CORAL NURSERY NEEDS.
***July 9, 2024 - The Government's questions for the Port Everglades Deepening Project - Environmental Update and Coral Nursery Needs are uploaded.***
The Jacksonville District of the U.S. Army Corps of Engineers will be holding an Industry Day event regarding the environmental updates associated with the forthcoming Port Everglades Deepening project and seeks feedback from the coral reef nursery community, contractors with experience overseeing complex mitigation restoration projects, and supporting environmental contractors, which will only be used for preliminary planning purposes. Seeking specific information, a list of questions will be uploaded to the SAM.gov website under the subject Notice ID. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating larger numbers of corals for outplanting; relocation of large number of corals, sponges and octocorals, removal of corals from tires; experience in outplanting benthic organisms, site preparation and oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
Note: USACE Break-out sessions are limited to contractors and USACE personnel only. However, for those who wish to have similar sessions with the National Marine Fisheries Service (NMFS) representatives, you may contact Ms. Jocelyn Karazsia at jocelyn.karazsia@noaa.gov or call 561-247-2101.
Event Date: July 23, 2024 – July 24, 2024
Event Time: 9:00am, EST (July 23, 2024), 8:00am, EST (July 24, 2024)
Event Location: Hilton Fort Lauderdale Marina
1881 Southeast 17th Street
Fort Lauderdale, FL 33316
Event Schedule:
Day 1 - Presentation and Breakout Sessions
- Registration: 8:30am - 9:00am
- Overview Presentation: 9:00am - 10:00am
- Breakout Sessions (1 hour): 10:00am – 5:00pm
- Event Concludes: 5:00pm
Day 2 - Breakout Sessions
- Breakout Sessions (1 hour): 8:00am – 5:00pm
- Event Concludes: 5:00pm
Event Registration:
Interested firms shall utilize the provided link to register for this event and request a breakout session No Later Than (NLT) July 16, 2024 at 3:00pm, EST. As space is limited, breakout sessions will be scheduled on a first come, first serve basis. Due to limited space, only 5 representatives from each firm will be able to attend the breakout session.
https://www.eventbrite.com/e/port-everglades-environmental-updates-and-coral-nursery-industry-day-2024-tickets-922817611317
Event Details: The Government is planning an Industry Day event to obtain feedback from both the dredging industry and supporting environmental contractors. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating and/or growing and outplanting a large number and wide variety of corals; ideas or experience in preventing disease or actions to maximize the success of outplanting/ relocating corals, sponges and octocorals, experience outplanting and site preparation as well as oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
The Government will provide an overview presentation on the history and status of the Port Everglades Deepening project, including the monitoring and adaptive management plan coordinated with regulatory agencies, to date.
If interested in attending this event, firms can register utilizing the link provided above and request a one-hour breakout session to answer the Governments questions. Note: The Government is not seeking responses to questions in advance of the event, rather, is requesting firms come prepared to discuss the questions, applicable to their area of expertise, during their breakout session. The goal of the breakout sessions is for the Government to obtain information from coral reef practitioners, those experienced in executing, monitoring and/or overseeing benthic habitat or similar mitigation projects. Input from the coral reef industry including practitioners is critical to the success of the subject project.
NOTES:
DO NOT RESPOND TO QUESTIONS UNTIL YOUR SCHEDULED BREAKOUT SESSION.
DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.
NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED.
Update #1 ·
INDUSTRY DAY: PORT EVERGLADES DEEPENING PROJECT – ENVIRONMENTAL UPDATE AND CORAL NURSERY NEEDS.
The Jacksonville District of the U.S. Army Corps of Engineers will be holding an Industry Day event regarding the environmental updates associated with the forthcoming Port Everglades Deepening project and seeks feedback from the coral reef nursery community, contractors with experience overseeing complex mitigation restoration projects, and supporting environmental contractors, which will only be used for preliminary planning purposes. Seeking specific information, a list of questions will be uploaded to the SAM.gov website under the subject Notice ID. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating larger numbers of corals for outplanting; relocation of large number of corals, sponges and octocorals, removal of corals from tires; experience in outplanting benthic organisms, site preparation and oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
Note: USACE Break-out sessions are limited to contractors and USACE personnel only. However, for those who wish to have similar sessions with the National Marine Fisheries Service (NMFS) representatives, you may contact Ms. Jocelyn Karazsia at jocelyn.karazsia@noaa.gov or call 561-247-2101.
Event Date: July 23, 2024 – July 24, 2024
Event Time: 9:00am, EST (July 23, 2024), 8:00am, EST (July 24, 2024)
Event Location: Hilton Fort Lauderdale Marina
1881 Southeast 17th Street
Fort Lauderdale, FL 33316
Event Schedule:
Day 1 - Presentation and Breakout Sessions
- Registration: 8:30am - 9:00am
- Overview Presentation: 9:00am - 10:00am
- Breakout Sessions (1 hour): 10:00am – 5:00pm
- Event Concludes: 5:00pm
Day 2 - Breakout Sessions
- Breakout Sessions (1 hour): 8:00am – 5:00pm
- Event Concludes: 5:00pm
Event Registration:
Interested firms shall utilize the provided link to register for this event and request a breakout session No Later Than (NLT) July 16, 2024 at 3:00pm, EST. As space is limited, breakout sessions will be scheduled on a first come, first serve basis. Due to limited space, only 5 representatives from each firm will be able to attend the breakout session.
https://www.eventbrite.com/e/port-everglades-environmental-updates-and-coral-nursery-industry-day-2024-tickets-922817611317
Event Details: The Government is planning an Industry Day event to obtain feedback from both the dredging industry and supporting environmental contractors. The Government is requesting answers to questions regarding artificial reef and boulder reef creation with a focus on attracting biota inhabiting coral communities, coral nursery capabilities including ideas or experience generating and/or growing and outplanting a large number and wide variety of corals; ideas or experience in preventing disease or actions to maximize the success of outplanting/ relocating corals, sponges and octocorals, experience outplanting and site preparation as well as oversight of sub-contractors overseeing personnel providing this type of work. These more detailed discussions will be held during the Industry Day breakout sessions.
The Government will provide an overview presentation on the history and status of the Port Everglades Deepening project, including the monitoring and adaptive management plan coordinated with regulatory agencies, to date.
If interested in attending this event, firms can register utilizing the link provided above and request a one-hour breakout session to answer the Governments questions. Note: The Government is not seeking responses to questions in advance of the event, rather, is requesting firms come prepared to discuss the questions, applicable to their area of expertise, during their breakout session. The goal of the breakout sessions is for the Government to obtain information from coral reef practitioners, those experienced in executing, monitoring and/or overseeing benthic habitat or similar mitigation projects. Input from the coral reef industry including practitioners is critical to the success of the subject project.
NOTES:
DO NOT RESPOND TO QUESTIONS UNTIL YOUR SCHEDULED BREAKOUT SESSION.
DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENITAL DATA.
NO REIMBURSEMENT WILL BE MADE FOR ANY COST ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO SAID NOTICE, ATTENDANCE AT THE INDUSTRY DAY EVENT OR ANY FOLLOW-UP INFORMATION SUBSEQUENTLY REQUESTED.
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Special Notice | |
| Kissimmee River Restoration S-69 Weir Permanent Repair Scour | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| St. Lucie South Jetty Repair Industry Day | ENDIST Jacksonville | No set-aside | |
| Tampa Harbor Improvements Industry Day | ENDIST Jacksonville | No set-aside | |
| Virtual Industry Day for FY27 USACE Enterprise Dredge Delivery Center National Small Business MATOC | ENDIST Wilmington | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity