About this opportunity

The Federal Aviation Administration Southwestern Region anticipates procuring the design and build of a new Air Traffic Control Tower at Fort Lauderdale-Hollywood International Airport in Fort Lauderdale, Florida, using the Progressive Design Build method, with responses to this market survey due by 5:00 PM ET on August 27, 2026. No set-aside is contemplated. The estimated project value is between $75 million and $100 million; NAICS 236220 applies with a Small Business Administration size standard of $45 million.

The facility will be located at the intersection of Lee Wagener Boulevard and SW 11th Terrace on the airport campus. The control cab is specified at 210 feet above ground level (216 feet above mean sea level) with a tower top height of 245 feet AGL (251 feet AMSL), a 650-square-foot control cab, and a slab-wall console configuration. Environmental assessment is ongoing, including Phase II Environmental Site Assessment and concurrent Environmental Assessment to address two Recognized Environmental Conditions identified in the Phase I.

The FAA is seeking sources with verifiable experience on tower or vertical construction projects valued at a minimum of $10 million within the past ten years at similar critical facilities, including FAA air traffic facilities, hospitals, or data centers. Responses must include company name, address, point of contact, business size status (including 8(a) Certified, Large Business, Small Business, SDB, or SDVOSB designation), UEI Number, years in business, current bonding capacity and bonding company name, and confirmation of interest in the industry day. All responses must be provided on company letterhead, limited to 10 pages or less, and submitted to all four listed FAA points of contact. An active SAM registration is required. Questions close August 18, 2026. An industry day is scheduled for early-mid September 2026.

Notice text

This is the Market Survey and Industry Day notice for the Design and Build of the new Fort Lauderdale-Hollywood International Airport (PIH) Air Traffic Control Tower (ATCT) in Fort Lauderdale, FL.


The FAA has a potential upcoming project for the Design and Build of a new FLL ATCT, in Fort Lauderdale, FL.  The FAA anticipates utilizing the Progressive Design Build (PDB) method for this procurement. The FAA is seeking interested sources capable of completing this requirement. The magnitude of this requirement is estimated to be between $75,000,000.00 and $100,000,000.00. This market survey is being conducted in accordance with FAA Acquisition Management System (AMS) Policy section 3.2.1.2.1 Market Analysis.  Additionally, the purpose of this notice is to request participation in Industry Day one-on-one discussions. See attached notice for full details. 

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
MARKET SURVEY NOTICE for new ATCT Project at (FLL) Fort Lauderdale- Hollywood International Airport Ft Lauderdale, Florida, United States · NAICS 236220 Southwestern Region No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors