IA-port louisa NWR-boat ramp repair proj
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 140FC226Q0014
- Agency
-
Fish and Wildlife Service
Department of the Interior
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238110 Poured Concrete Foundation and Structure Contractors
- PSC
- 5620 Tile, Brick And Block
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Fish and Wildlife Service (Department of the Interior) is soliciting sealed bids from contractors for repair work on a damaged and degraded public boat ramp at Port Louisa National Wildlife Refuge in Wapello, Iowa. The primary scope of work involves demolishing and removing an approximately 8 feet by 28 feet damaged concrete and rebar section from the existing boat ramp slab, preparing the bedding, fabricating new forms with rebar, and pouring new concrete at 6 inches depth with a minimum strength of 4,000 psi and embedded traction bars. Contractors must possess the capability to perform heavy concrete work and coordinate scheduling with refuge staff to accommodate low river water conditions. The solicitation does not specify explicit evaluation criteria beyond standard sealed bid procurement procedures with public opening at the time offers are due. Critical deadlines include a mandatory site visit on March 11, 2026, at 9:00 AM CST (contractors must notify Nathan Barnett at Nathan_barnett@fws.gov or 636-474-9749 at least 24 hours in advance), submission of questions by March 12, 2026, to Bill Koski at william_koski@fws.gov, and sealed quotes due by March 27, 2026, at 3:00 PM EST to Bill Koski.
This solicitation is designated as a Total Small Business set-aside, restricting competition to certified small business concerns. No incumbent contractor or award value is identified in the available documentation. The project timeline requires contractors to commence work within 10 calendar days of award and complete all work within 91 calendar days, with a performance period from April 13, 2026, through October 2, 2026, with potential extension if Mississippi River levels necessitate schedule adjustments; the ideal work window is July 15, 2026, through October 2, 2026. The work is located at Port Louisa National Wildlife Refuge near Wapello, Iowa, with all materials, equipment, labor, and supervision provided by the contractor. Davis-Bacon wage rates apply to this project, and standard federal clauses regarding buy American construction materials, environmental compliance, and hazardous materials handling are incorporated into the contract terms.
Notice text
2 versions
Update #2 · Latest ·
IA-Port Louisa NWR Boat Ramp Project. Remove existing concrete boat ramp,and replace with new concrete boat ramp.
Seeking contractors to repair a damaged and degraded public boat ramp to the Mississippi River from the Louisa Division of the refuge. With river levels low, refuge staff have determined that previously-identified concrete degradation of a section of the ramp is accelerating and presents a property hazard to users of the river that must be monitored by refuge staff on a weekly basis to ensure its continued use.
Site Visit- March 11, 2026, 9:00 AM CST, email Nathan Barnett, Nathan_barnett@fws.gov, or call, (636)474-9749, no later than 24 hours prior to the site visit.
Questions- March 12, 2026, emailed to Bill Koski, william_koski@fws.gov
Quotes Due- March 27, 2026, at 3:00 PM EST, to emailed to Bill Koski, william_koski@fws.gov
Update #1 ·
IA-Port Louisa NWR Boat Ramp Project. Remove existing concrete boat ramp,and replace with new concrete boat ramp.
Seeking contractors to repair a damaged and degraded public boat ramp to the Mississippi River from the Louisa Division of the refuge. With river levels low, refuge staff have determined that previously-identified concrete degradation of a section of the ramp is accelerating and presents a property hazard to users of the river that must be monitored by refuge staff on a weekly basis to ensure its continued use.
Site Visit- March 11, 2026, 9:00 AM CST, email Nathan Barnett, Nathan_barnett@fws.gov, or call, (636)474-9749, no later than 24 hours prior to the site visit.
Questions- March 12, 2026, emailed to Bill Koski, william_koski@fws.gov
Quotes Due- March 20, 2026, at 3:00 PM EST, to emailed to Bill Koski, william_koski@fws.gov
Files
| File | Type | Posted |
|---|---|---|
| Sol_140FC226Q0014_Amd_0001.pdf | ||
| A04_SOW_Amended_Port_Louisa_Boat_Ramp_0001.pdf | ||
| SOW_Clauses_Wage_Rate_Port_Louisa_Boat_Ramp.pdf | ||
| Sol_140FC226Q0014.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| IA-port louisa NWR-boat ramp repair proj | Award Notice | |
| This notice | Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Or-malheur NWR-concrete slab south place | — | Total Small Business | |
| MN fergus falls WMD handrail stairs | — | Total Small Business | |
| NY montezuma NWR main shop roof | — | Total Small Business | |
| NJ-NY ERFO FW WARI 2019-1(1) - Wallkill River National Wildlife Refuge | Federal Highway Administration | Total Small Business | |
| In patoka river NWR dumpster service | — | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity