HVAC Repair

Closed Pre-Solicitation Posted

Solicitation number
W91QV124R9998
Agency
Responses due
Set-aside
Competitive 8(a)

Opportunity facts

Place of performance
Fort Belvoir, Virginia 22060, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston is seeking a contractor to provide a design-build solution for the repair and replacement of the HVAC system in Building 3136 at Davison Army Airfield, Fort Belvoir, VA. The existing 30-year-old HVAC system is in poor condition and needs to be replaced, including the fan coil units, air-cooled chiller, boiler, pumps, piping, and controls. The contractor will be required to design and construct the new HVAC system while the building remains occupied, and must provide a temporary conditioned work space during construction. The performance period is 730 calendar days, with the design to be completed within 215 days. Contractors must comply with all applicable federal, state, and local codes and regulations, and follow specific submittal and documentation requirements.

This is a Competitive 8(a) set-aside contract opportunity. The incumbent or current contractor is unknown. The contract value is not specified, but the building footprint is approximately 12,060 gross square feet. The pre-solicitation notice was posted on July 29, 2024, and proposals are due by August 7, 2024.

Notice text

Building 3136 is located at Davison Army Airfield (DAAF) at 6970 Britten Drive, Fort Belvoir, VA 22060 and is the airfield operation center.  It will remain occupied and mission ready throughout the completion of the construction.  Contractor shall provide a temporary conditioned work facility on site, large enough to support a minimum of 10-15 employees, for swing space while work is underway within the office space.  The building footprint is approximately 12,060 gross square feet, including two floors of offices, a control tower and a below grade mechanical room.

B3136 was constructed in 1966 but has been renovated since then. The existing 2-pipe fan coil system is approaching 30 years old and has antiquated controls. The air-cooled chiller located outside mechanical room operates on R-20 refrigerant and leading to increased difficulty maintaining the system. The offices are heated by wall fan coil units and cooled by window mounted air conditioners. The server/IT room is cooled by Liebert unit separated the rest of building. The heating water is provided by the condensing boiler with BAS controls resided in the mechanical room which is not working properly.

B3136 is an aging building showing signs of deferred maintenance. This existing configuration has led to difficulty maintaining comfort cooling or heating.

The two-story portion of the building is constructed with concrete masonry units (CMU) and has a low-slope gabled roof with a modified bitumen roof finish. Large windows with a small sliding operable sashes are placed on a 2’-0” knee-wall and extend to the finished ceiling in office spaces. The penthouse has a steel frame with curtain walls consisting of aluminum spandrel panels and fixed, insulated glazing. The penthouse has a minimally-sloped, flat roof with a modified bitumen roof finish. The mechanical room is located below grade at the south end of the building. The rest of the building has a large crawl space (approximately 4’ in height) below the concrete floor of the first floor.  The first floor has a concrete floor that is approximately 5” (F.V.) thick. The second floor is supported by steel bar joists with corrugated steel decking and a concrete floor. The roof has a steel bar joists with a poured gypsum deck (F.V.). The second floor joists have an approximate clear space of 13” (F.V.) and the roof joists have an approximate clear space of 13” at the eaves and 22” at the peak of the roof. Fixed portions of windows have insulated glass with the bottom quarter of the windows having an operable sliding sash. Some sashes have been removed to install window AC units. Windows appear to be in fair condition. 

This project addresses the inadequate HVAC configuration. Due to the limitations of the building construction, the HVAC shall be replaced in-kind including but not limited to, 2-pipe fan coil units, air cooled chiller, new insulated piping, circulator pumps, boiler, and valves. Additional fan coils are desired in the hallways and offices that are currently not served by the existing piping if feasible. The replacement system shall provide wall-mounted digital thermostat read outs for each fan coil showing the temperature set-point allowing for clearer understanding of system function to end-user. The building is to remain operational during construction.    

Files

File Type Posted
AV-22006-2J DAAF B3136-B SOW - HVAC.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
HVAC Replacement, Bldg. 2821 NAICS 238220 Air Combat Command Total Small Business
Replace HVAC Rooftop Units at Building 2275 March Air Reserve Base, California 92518, United States · NAICS 238220 Army National Guard No set-aside
648-22-104 Correct HVAC Deficiencies (P&V) Portland, Oregon 97239, United States · NAICS 238220 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement Jbsa Ft Sam Houston, Texas 78234, United States · NAICS 238220 Air Education and Training Command No set-aside
Gwmp - arho bunker HVAC NAICS 238220 Intermountain Region Service-Disabled Veteran-Owned Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity