Horse Creek Work Center Water Line Replacement
Award Notice Posted
- Solicitation number
- 1240BH21R0010
- Agency
-
Region 6 - Pacific Northwest Region
Forest Service, Department of Agriculture
- Awarded
- to Banzer Construction Co, Inc.
- Set-aside
- Total Small Business
Opportunity facts
- Contract number
- 1240BH21C0008 Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- Place of performance
- McKenzie Bridge, Oregon 97413, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This Award Notice from the USDA Forest Service R6-Pacific Northwest Region awarded a contract valued at $399,660 to BANZER CONSTRUCTION CO, INC on June 16, 2021 to replace the existing water system at the Horse Creek Work Center located on the Willamette National Forest. The awarded contract includes replacing approximately 2,770 feet of 3-inch water distribution pipes, installing new chlorine analyzers and backup generator, and replacing the well pump and starter to provide a reliable water system for the work center.
Notice text
2 versions
Update #2 · Latest ·
The work of this Contract includes all labor, equipment and materials required to replace the existing
water system at USFS Horse Creek Work Center located on the Willamette National Forest. This project
will:
1. Abandon the existing water system (3-Inch diameter main line water pipe) and install approximately
2,770 feet of new 3-inch main line water pipe. Connect existing buildings and new freeze-proof yard
hydrants to new main line water pipe. Piping shall be open trench High Density Polyethene (HDPE) pipe
material with alternatives to use Polyvinyl Chloride (PVC) pipe material and horizontal boring. Most
trenching will be outside of paved areas with limited asphalt and concrete paving to replace removed
pavement. Water valves with valve boxes and air release valves will be installed. There are no vaults or
water meter work.
2. Install two new Chlorine Analyzers with data loggers.
3. Install new by-pass piping at well in pump house.
4. Replace existing well pump and starter with same size equipment and operation.
5. Install new propane back-up generator for well pump at pump house (exterior stand-alone unit).
Awarded contract 1240BH21C0008 to BANZER CONSTRUCTION CO, INC for 399660.00 on 2021-06-16.
Update #1 ·
The work of this Contract includes all labor, equipment and materials required to replace the existing
water system at USFS Horse Creek Work Center located on the Willamette National Forest. This project
will:
1. Abandon the existing water system (3-Inch diameter main line water pipe) and install approximately
2,770 feet of new 3-inch main line water pipe. Connect existing buildings and new freeze-proof yard
hydrants to new main line water pipe. Piping shall be open trench High Density Polyethene (HDPE) pipe
material with alternatives to use Polyvinyl Chloride (PVC) pipe material and horizontal boring. Most
trenching will be outside of paved areas with limited asphalt and concrete paving to replace removed
pavement. Water valves with valve boxes and air release valves will be installed. There are no vaults or
water meter work.
2. Install two new Chlorine Analyzers with data loggers.
3. Install new by-pass piping at well in pump house.
4. Replace existing well pump and starter with same size equipment and operation.
5. Install new propane back-up generator for well pump at pump house (exterior stand-alone unit).
Awarded contract 1240BH21C0010 to BANZER CONSTRUCTION CO, INC for 399660.00 on 2021-06-16.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Award Notice | |
| Horse Creek Work Center Water Line Replacement | Solicitation | |
| Horse Creek Work Center Water Line Replacement | Pre-Solicitation |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity