Hollywood Reservoir Lakeridge Drive Landslide and Slope Restoration
Award Notice Posted
- Solicitation number
- AG-9104-S-09-0003
- Agency
-
National Resources Conservation Service
Department of Agriculture
- Awarded
- to Calex Engineering Inc.
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- AG-9104-C-09-0003 Federal contract award
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- PSC
- Not on record
Notice details come from SAM.gov. Updated .
Notice text
3 versions
Update #3 · Latest ·
This amendment adds clarification language, changes the bid due date, updates the Dept. of Labor wage determination, and corrects and adds some drawings for clarification.
This IFB is for Hollywood Reservoir Lakeridge Drive Landslide and Slope Restoration Emergency Watershed Project. Major items of construction are Fill for slides, 38,181 CY; Site clearing and structures removal, Lump Sum; Auger 18, 24-36 inch diameter pilot holes, 648 LF; 48 inch diameter, cast-in-drill-hole reinforced concrete piles, 1192 LF; 60 inch diameter, cast-in-drill-hole reinforced concrete piles, 504 LF; Excavation support and protection, Lump Sum; 6 inch diameter, French drain and perforated PVC pipe, 929 LF; and 4 inch diameter, French drain and perforated PVC pipe, 1662 LF. The period of performance is 142 calendar days from receipt of notice to proceed. Bids are due 7/28/2009 by 3:00 p.m., local time at the Davis office. A site visit is scheduled for 7/9/09 at 1:00 pm local time. Directions to the site visit meeting are: from US 101 South toward Los Angeles take Exit 11 (Barham Blvd. toward Barham Blvd. (0.1 mile); turn left onto Cahuenga Blvd. west (0.1 mile); turn left onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr.; from US 101 North toward Harbor Freeway take Exit 11A (Barham Blvd.) toward Barham Blvd./Burbank (0.1 mile); stay straight to go onto Cahuenga Blvd. East (0.5 mile); turn right onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave. (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr. The estimated price range for this work is between $1,000,000 and $5,000,000. The solicitation documents will be made available via FedBizOpps website approximately 06/11/2009.
Update #2 ·
This amendment adds CAD drawings for grading plan and cross sections.
This IFB is for Hollywood Reservoir Lakeridge Drive Landslide and Slope Restoration Emergency Watershed Project. Major items of construction are Fill for slides, 38,181 CY; Site clearing and structures removal, Lump Sum; Auger 18, 24-36 inch diameter pilot holes, 648 LF; 48 inch diameter, cast-in-drill-hole reinforced concrete piles, 1192 LF; 60 inch diameter, cast-in-drill-hole reinforced concrete piles, 504 LF; Excavation support and protection, Lump Sum; 6 inch diameter, French drain and perforated PVC pipe, 929 LF; and 4 inch diameter, French drain and perforated PVC pipe, 1662 LF. The period of performance is 142 calendar days from receipt of notice to proceed. Bids are due 7/28/2009 by 3:00 p.m., local time at the Davis office. A site visit is scheduled for 7/9/09 at 1:00 pm local time. Directions to the site visit meeting are: from US 101 South toward Los Angeles take Exit 11 (Barham Blvd. toward Barham Blvd. (0.1 mile); turn left onto Cahuenga Blvd. west (0.1 mile); turn left onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr.; from US 101 North toward Harbor Freeway take Exit 11A (Barham Blvd.) toward Barham Blvd./Burbank (0.1 mile); stay straight to go onto Cahuenga Blvd. East (0.5 mile); turn right onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave. (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr. The estimated price range for this work is between $1,000,000 and $5,000,000. The solicitation documents will be made available via FedBizOpps website approximately 06/11/2009.
Update #1 ·
This IFB is for Hollywood Reservoir Lakeridge Drive Landslide and Slope Restoration Emergency Watershed Project. Major items of construction are Fill for slides, 38,181 CY; Site clearing and structures removal, Lump Sum; Auger 18, 24-36 inch diameter pilot holes, 648 LF; 48 inch diameter, cast-in-drill-hole reinforced concrete piles, 1192 LF; 60 inch diameter, cast-in-drill-hole reinforced concrete piles, 504 LF; Excavation support and protection, Lump Sum; 6 inch diameter, French drain and perforated PVC pipe, 929 LF; and 4 inch diameter, French drain and perforated PVC pipe, 1662 LF. The period of performance is 142 calendar days from receipt of notice to proceed. Bids are due 7/28/2009 by 3:00 p.m., local time at the Davis office. A site visit is scheduled for 7/9/09 at 1:00 pm local time. Directions to the site visit meeting are: from US 101 South toward Los Angeles take Exit 11 (Barham Blvd. toward Barham Blvd. (0.1 mile); turn left onto Cahuenga Blvd. west (0.1 mile); turn left onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr.; from US 101 North toward Harbor Freeway take Exit 11A (Barham Blvd.) toward Barham Blvd./Burbank (0.1 mile); stay straight to go onto Cahuenga Blvd. East (0.5 mile); turn right onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave. (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr. The estimated price range for this work is between $1,000,000 and $5,000,000. The solicitation documents will be made available via FedBizOpps website approximately 06/11/2009.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity